Proposed Tech Specs SR 3.8.1.7 Re Rev to DG Surveillance Requirement
ML20202E593
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/22/1999
From:
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20202E584 List:
References
NUDOCS 9902030086
Download: ML20202E593 (4)


Text

. _.. . _ _ _ _ _ _ _ .. _ _ . _ . _ _ _ _. _ _ . _ _ _ ._ _ _ . _ _ ._. _ _ . _ . . _ . _ .

AC Sources - Operating 3.8.1 l

SURVEILLANCE REQUIREMENTS (continued) i SURVEILLANCE FREQUENCY SR 3.8.1.6 Verify the fuel oil transfer system 31 days operates to transfer fuel oil from storage

. tank-to the day tank.

SR 3.8.1.7 -------------------NOTE-------------------- 1 All DG starts may be preceded by an engine prelube period. -

l

)

Verify each DG starts from standby -

184 days condition and achievesl inA 10 segefids.  ;

.rv ol e 2 37 and/ 4574V and ffequency <

.5Hz L2 ds60/JHz.}

l SR 3.8.1.8 ------------------NOTE-------------------

( ,

This Surveillance shall not be performed  !

in MODE 1 or 2. However, credit may be l l taken for unplanned events that satisfy l

this SR. '

Verify automatic slow transfer 24 months I

of AC power supply from the Startup Transformer to the Standby Transformer.

(continued) q, h 6 to reconds volhge 3 3'P/W an A j h

  • 1
  • W y ) 5 7. 5 H w ; aw l

! b. sbh hde v oWge. *TMWad 6 45% V j { ad 4 epentf ><F7,s H, ad 6 6o.Sih.

i s

i l

j DAEC Amendment 223 l

9902030086 990122 l PDR ADOCK 05000331 4 P PDR .J u

AC Sources-Operating B 3.8.1 1

B,ASES ,

l l

SURVEILLANCE SR 3.81.2 and SR 3. ELL 2 (continued)

REQUIREMENTS i After completion of the SR the fuel racks to the DG are disabled to allow purging of any residual fuel oil from the cylinders. This also renders the DG inoperable. The two l hours allowed by the Note minimizes the amount of time a DG i is inoperable while providing enough time to perform the  !

required Conditional Surveillance and avoids entering the shutdown actions of Condition E or F unnecessarily For the purposes of this testing, the DGs are manually started from standby conditions. Standby conditions for a l DG mean that the diesel engine coolant and oil are being I continuously circulated and temperature is being maintained  !

consistent with manufacturer recommendations. ,

In order to reduce stress and wear on diesel engines during I testing, the manufacturer of the DGs installed at the DAEC l

h o.cMeve4 sYadf recommends a modified start in which the starting speed of l' f

sh% vob e,33')yy the DG is limited, warmup is limited to this lower speed.

and the DGs are gradually accelerated to synchronous speed "d MSN M prior to loading. These start procedures are the intent of 6epewy >,b ELS Ha Note 2 (SR 3.8.1.2).

4d 6 GO,5 NQ SR 3.8.1.7 requires that, at a 184 day Frequency, the DG starts from standby conditions and achieves reauirgd voltag and frequency (i.e. -soltace 2 3744 V(ang s 4F/6 V)and e

frequency a 59.5 10 second start Hz(ani s 60/5 requirement r Hb)the sugorts withiri 10 seconds;in the assumptions design basb LOCA analysis of JFSAR. Section 6.3 (Ref.12) l and DAEC SAFER /GESTR LOCA Analysis. NEDC-31310P (Ref. 15).

The 10 second start requirement is not a]plicable to SR 3.8.1.2 (see Note 3 of SR 3.8.1.2), w1en a modified start procedure as described above is used. If a modified start ,

is not used, the 10 second start requirement of SR 3.8.1.7 l applies.9 The normal 31 day Frequency for SR 3.8.1.2 is consistent ,

with Safety Guide 9. The 184 day Frequency for SR 3.8.1.7 l is a reduction in cold testing consistent with Generic Letter 84-15 (Ref. 7). These Frequencies provide adequate assurance of DG OPERABILITY, while minimizing degradation resulting from testing.

1 Ewd b hheSRY'pWe*Sk h h dr.b Dbht*N Sbd chh o pd% pw\est n' vent *h Db SN MM U e* Pb *b i I I pohtu\\y mondoreh *M M D'*A "M # A k N#^ 7 b "'3"^ M Qgf emp ad volhp rap N or per9erktwc%J .

(continued)

DAEC B 3.8-16 Amendment 223

1

, TSCR-022 Attachment 3 to NG-99-01 I2 l Page1ofI l

, , SAFETY ASSESSMENT By letter dated January 22,1999, IES Utilities Inc. submitted a request for revision of the Technical Specifications for the Duane Arnold Energy Center (DAEC). The proposed change is consistent with NRC-approved Revision 2 to Traveler TSTF-163 for the Improved Standard Technical Specifications for General Electric BWR/4 plants (NUREG-1433). i Evaluation: I l

This proposed change revises surveillance requirement SR 3.8.1.7 to better match plant

- conditions during testing. This surveillance test is performed with the DG unloaded, so  !

that the DG initially over-shoots its target nominal voltage and frequency during testing. l In an actual event, the DG would be almost immediately loaded once minimum voltage and frequency requirements are met, thereby limiting the over-shoot. The revision changes the SR 3.8.1.7 criteria to clarify which voltage and frequency limits are applicable during the transient and steady state portions of the DG start.

The revised test criteria are a better match for the tested condition (unloaded). The Loss of Offsite Power - Loss of Coolant Accident (LOOP-LOCA) test will still be performed l to demonstrate DG operability in conditions which are more representative of accident l conditions (loaded in the actual time sequence for loading). I i

This change does not affect the DG's ability to supply the minimum voltage and frequency required within 10 seconds or the steady state voltage and frequency required by the UFSAR analysis. The DGs will continue to perform their intended safety function, l in accordance with the DAEC accident analysis.

Therefore, we have concluded that the proposed revision to the DAEC Technical Specifications is acceptable, i l

l~ l 1

l l

l l.

I i

k 4

. l l '. TSCR-022 Attachment 4 to l

I NG-99-0112 PageiofI

, , ENVIRONMENTAL CONSIDERATION 10 CFR Section 51.22(c)(9) identifies certain licensing and regulatory actions which are eligible for categorical exclusion from the requirement to perfonn an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed I amendment would not: (1) involve a significant hazards consideration; (2) result in a

)

i significant change in the types or significant increase in the amounts of any effluents that may be released offsite; and (3) result in a significant increase in individual or cumulative occupational radiation exposure. IES Utilities Inc. has reviewed this request and  ;

determined that the proposed amendment meets the eligibility criteria for categorical  ;

exclusion set forth in 10 CFR Section 51.22(c)(9). Pursuant to 10 CFR Section 51.22(b), i no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows:

Basis l

l The change meets the eligibility criteria for categorical exclusion set forth in 10 CFR I Section 51.22(c)(9) for the following reasons:

i

1. As demonstrated in Attachment I to this letter, the proposed amendment does not involve a significant hazards consideration.

I l

2. There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite. The proposed change is consistent with NRC-approved Revision 2 to Traveler TSTF-163 for the Improved Standard j Technical Specifications for General Electric BWR/4 plants (NUREG-1433). This l l change affects DG testing criteria only and will not affect either the amount or l

type of effluents normally released from the plant.

3. There is no significant increase in individual or cumulative occupational radiation exposure. The proposed change is consistent with NRC-approved Revision 2 to .

I l Traveler TSTF-163 for the Improved Standard Technical Specifications for General Electric BWR/4 plants (NUREG-1433). This change affects DG testing criteria only and will not significantly affect either individual or cumulative  ;

occupational radiation exposure. '

1 l