ML20062B426

From kanterella
Revision as of 19:44, 6 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Public Version of Revision 2 to Emergency Plan Implementing Procedure Qep 530-3, Offshift Augmentation Drill & Revision 10 to Qep 530-0, Exercises & Dills
ML20062B426
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 06/21/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20062B400 List:
References
PROC-820621-01, NUDOCS 8208040481
Download: ML20062B426 (3)


Text

_ _

_ _ _ .u _

QEP 530-0 7 Ravision 10 June 1982 ID/2W,2X EXERCISES AND DRILIS 530-0 Rev. 10 Exercises and Drills 06-21-82 530-1 Emergency Exercise Rev. I 12-16-80 530-2 Emergency Drills Rev. 6 06-0.7-82 530-3 Off-Shift Augmentation Drill Rev. 2 06-21-82 530-S1 Monthly NARS Drill Quad-Cities Station Rev. 3 10-06-81 530-S2 ,

Monthly Test of the NRC Health Physics Network Rev. 1 01-05-82 530-S3 Monthly Test of the NRC Emergency Notification System Rev. 1 02-17-82 l

al

'i...

t i

4PPROVED I JUN 211982 Q. C. u. s. g 8208040481 820723 PDR ADOCK 05000254 F PDR (final)

- s.

QEP 530-3 Revision 2 0FF-SHIFT AUGMENTATION DRILL June 1982 ID/5C A. PURPOSE The purpose of this procedure is to outline the method used to conduct the semi-annual off-shift augmentation drill.

B. REFERENCES

1. GSEP Table 6.1-1, Simplified Emergency Notification Scheme.
2. QEP 320-1, Activation of the Emergency Organization.
3. QEP 310-1, Initial Notification.
4. QEP 310-T1, Guidance for Augmentation of the On-Site Emergency Organization Within 30 Minutes.

C. PREREQUISITES

1. None.

D.

PRECAUTIONS i-

1. None.

E. LIMITATIONS AND ACTIONS

1. Off-shift shall be any time other than regular working hours (0800-1630, Monday thru Friday).
2. If no Director for a given responsibility can be contacted, an appropriate Caller or a Station Director may be deputized to act as an interim Director.

F. PROCEDURE

1. On a semi-annual basis, the Quad-Cities Nuclear Power Station should conduct an off-shift augmentation drill in order to test the ability to staff the Station's emergency organization within the time frame necessary to adequately respond to an emergency.

l l

l l

I APPROVED l JUN 211982 l _1 o.c.u s n

._ __ _ __ __. _ _ _. .__ _. _ _ _ _ _ __ 7 QEP 530-3 Revision 2

2. The drill should be initiated by handing the on-shift Shift Engineer a pre-written message. Beginning with the Shift Engineer, personnel are to relay the message in the sequence specified by QEP 310-T1. The message should be:

"This is a drill. A GSEP condition of General Emergency is being simulated. Please contact those individuals you are designated to contact as specified by your copy of the Prioritized Notification List. Indicate on the listing the times at which you contact the required personnel. Return your copy of the Prioritization Notification List to the GSEP Coordinator as soon as practical. Relay this message in the sequence specified by QEP 310-T1, until adequate staff augmentation is achieved."

, 3. The GSEP Coordinator will tabulate the data to determine if the drill was successful.

4. The drill is considered successful if the general emergency requirements of QEP 310-T1 are met. This is to be interpreted that the appropriate personnel would be able to be'on-site within 30 minutes of being notified, and the appropriate notifications are all completed within 30 minutes from the start of the drill. If the drill is not successful, another drill should be conducted within a month.

G. CHECKLISTS

1. None.

4 H. TECHNICAL SPECIFICATION REFERENCES

1. None. .

l l

l APPROVED JUN 211982 Q.C.O.S.H.

(final)

. . . - .