ML20155E159
ML20155E159 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 04/11/1986 |
From: | Silver H Office of Nuclear Reactor Regulation |
To: | Stolz J Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8604170515 | |
Download: ML20155E159 (2) | |
Similar Documents at Crystal River | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211L3311999-09-0303 September 1999
[Table view]Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3 ML20207F8451999-03-0202 March 1999 Forwards NRC Operator Licensing Exam Rept 50-302/98-301 (Including Completed & Graded Tests) for Tests Administered on 980629-0701 ML20207L7771999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Deficiencies in License Amend Request to Change Standby Position of LPI & Bldg Spray Sys Suction Valves from Open to Closed.Meeting Has Been Cancelled ML20203J0851999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Licensee Deficiencies Identified in Their License Amend Request to Change Standby Position of Low Pressure Injection & Building Spray Sys Suction Valves ML20151X0311998-08-27027 August 1998 Notification of 980921 Meeting W/Fpc in Rockville,Md to Discuss Present Plans & Schedules for Proposed Design Mods to Emergency Feedwater & High Pressure Injection Systems at Crystal River Unit 3.Meeting Agenda Attached ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20236Y5761998-08-0606 August 1998 Notification of 980724 Meeting W/Util in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20236S1451998-07-17017 July 1998 Responds to 980206 Memo from W Rogers Which Documented Errors Identified in Staff SE for Amend 163 to Crystal River Unit 3 FOL ML20236U5641998-07-10010 July 1998 Notification of 980724 Meeting W/Florida Power Corp in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20249A7921998-06-12012 June 1998 Submits TIA 98-003 Requesting That NRR Respond to Questions Re Unit 3 Low Pressure Injection ECCS Valve Configurations ML20248M0831998-06-11011 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20248L7421998-06-0505 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20217Q5271998-05-0404 May 1998 Notification of 980513 Meeting W/Util in Crystal River,Fl to Discuss Issues Related to Increased Number of Sea Turtles Entering Crystal River Intake Canal,Requirements of Endangered Species Act ML20217Q5551998-05-0101 May 1998 Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3 ML20216J5241998-04-15015 April 1998 Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20203A3651998-02-12012 February 1998 Notification of Meeting W/Fpc on 980225 in Rockville,Md Re Technical Discussions Concerning IPE Submittal ML20199F9211998-01-27027 January 1998 Informs That on 971215 FPC Submitted Jco Re Control Complex Habitabiltiy Envelope ML20199A4851998-01-0707 January 1998 Notification of 980112 Meeting W/Util in Rockville,Md to Present Status of Resolution Issues Addressed in NRC CAL, ML20199A4811998-01-0505 January 1998 Notification of 980108 Meeting W/Util in Rockville,Md to Discuss Control Complex Habitability Envelope Including NRC Staff Assessment of FPC Justification for Continued Operation (NRC Ltr ) ML20203C4761997-12-0505 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Util Response to Staff 971126 Request for Addl Info Re SBLOCA License Amend Submittal ML20202E6581997-11-26026 November 1997 Notification of 971202 Meeting W/Util in Rockville,Md to Discuss Seismic Qualification of Mechanical & Electrical Equipment (A46 Issue) & Large Bore Piping & Pipe Support Calculations ML20198Q2751997-11-0404 November 1997 Notification of 971106 Meeting W/Util in Rockville,Md to Discuss Crystal River 3 Restart Schedule Issues ML20198Q4231997-11-0404 November 1997 Notification of Meeting W/Fpc on 971120 in Rockville,Md Re Plant Mgt Corrective Action Plan & Mc 0350 Restart Panel Meeting ML20198Q4921997-11-0404 November 1997 Notification of Meeting W/Fpc on 971114 in Rockville,Md Re Control Complex Habitability envelope-working Level Technical Discussions ML20199B9791997-11-0404 November 1997 Notification of Change in Time & Room Number of 971120 Meeting W/Util in Rockville,Md Re Plant,Unit 3 Mgt Corrective Action Plan & Manual Chapter 0350 Restart Panel Meeting ML20199C4821997-11-0404 November 1997 Notification of Change in Room Number & Purpose for 971114 Meeting W/Fpc Re Control Complex Habitability Envelope - Working Level Techincal Discussions & Request for Addl Info Re SBLOCA ML20217K8131997-10-17017 October 1997 Notification of 971028 Meeting W/Util Re Working Level Discussions Re EDG Mods,Testing & Qualification ML20198R8001997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20.Meeting Cancelled & to Be Rescheduled ML20212F2361997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20 ML20198K0451997-10-15015 October 1997 Revised Notification of 971022 Meeting W/Util in Rockville, MD to Discuss Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes.Listed Attendees Encl ML20211P4381997-10-0909 October 1997 Notification of 971022 Meeting W/Util in Rockville,Md to Discuss Working Level Technical Discussions Relating to FPC Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes ML20216J4361997-09-10010 September 1997 Notification of 970918 Meeting W/Util in Rockville,Md to Discuss Changes to EOP to Reflect TSs Change Request Re Mitigation of Small Break LOCAs & Associated Design Basis Changes ML20217Q9611997-08-28028 August 1997 Notification of 970905 Meeting W/Util in Rockville,Md to Discuss Licensee Schedule & Status of Licensing Submittals Required for Restart ML20217D3341997-07-30030 July 1997 Transmits Attachment D to Memo of 970729,which Forwarded Minutes of Crystal River 3 Restart Panel Meeting Held 970722.Memo Did Not Include Attachment D as Result of Inadvertent Error ML20141C5761997-06-23023 June 1997 Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 ML20148J7341997-06-13013 June 1997 Notifies of 970624 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed License Amend for Addressing Emergency Diesel Upgrade,Emergency Feedwater,High Pressure Injection Sys & Small Break LOCA Design Basis Issues ML20141H4691997-05-21021 May 1997 Notification of 970611 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Findings Related to 10CFR50,App R Design Basis Issues ML20148C0851997-05-0707 May 1997 Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown ML20148C0931997-04-17017 April 1997 Requests Concurrence in Adjusting SALP Period for Plant Facility Until Six Months After Restart of Unit ML20137V2781997-04-15015 April 1997 Notification of 970423 Meeting W/Florida Power Corp in Rockville,Md to Discuss Status of Licensing Activities & Actions ML20137D5741997-03-25025 March 1997 Forwards Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr.W/O Encl ML20137A1391997-03-13013 March 1997 Requests That Pp Number 73 Be Removed,Destroyed & Replaced W/Encl Corrected Pp Number 73 to Physical Security Plan.Page Withheld ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20135E1991997-03-0404 March 1997 Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents ML20134H5211997-02-0707 February 1997 Notification of Meeting W/Fpc on 970218 in Rockville,Md to Discuss & Review Status of Licensing Activities & Actions ML20147C3351997-01-27027 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960322-29 ML20133K9871997-01-16016 January 1997 Discusses Util Which Submitted 30 Day Special Rept 96-03 & Informed NRC of Plan to Abandon Two Peak Seismic Monitoring Instruments.Subj Plan Found to Be Acceptable ML20210L3471997-01-14014 January 1997 Responds to 960926 Memo to Ew Merschoff Re Proposed Enforcement Actions Resulting from Crystal River Integrated Performance Assessment Process for Insp Rept 50-302/96-07. Planned Disposition of Potential Enforcement Actions Listed ML20203B3911996-12-24024 December 1996 Forwards Rept of Investigation Re Alleged Discrimination Against Senior Licensed Operations Supervisors DA Fields & RP Weiss (Case 2-95-020 & 2-95-021) ML20203B5281996-12-0404 December 1996 Expresses Appreciation for Prompt Review of Six Transcripts Provided in 961003 Memo 1999-09-03 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20211L3311999-09-0303 September 1999
[Table view]Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3 ML20207F8451999-03-0202 March 1999 Forwards NRC Operator Licensing Exam Rept 50-302/98-301 (Including Completed & Graded Tests) for Tests Administered on 980629-0701 ML20207L7771999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Deficiencies in License Amend Request to Change Standby Position of LPI & Bldg Spray Sys Suction Valves from Open to Closed.Meeting Has Been Cancelled ML20203J0851999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Licensee Deficiencies Identified in Their License Amend Request to Change Standby Position of Low Pressure Injection & Building Spray Sys Suction Valves ML20151X0311998-08-27027 August 1998 Notification of 980921 Meeting W/Fpc in Rockville,Md to Discuss Present Plans & Schedules for Proposed Design Mods to Emergency Feedwater & High Pressure Injection Systems at Crystal River Unit 3.Meeting Agenda Attached ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20236Y5761998-08-0606 August 1998 Notification of 980724 Meeting W/Util in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20236S1451998-07-17017 July 1998 Responds to 980206 Memo from W Rogers Which Documented Errors Identified in Staff SE for Amend 163 to Crystal River Unit 3 FOL ML20236U5641998-07-10010 July 1998 Notification of 980724 Meeting W/Florida Power Corp in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20249A7921998-06-12012 June 1998 Submits TIA 98-003 Requesting That NRR Respond to Questions Re Unit 3 Low Pressure Injection ECCS Valve Configurations ML20248M0831998-06-11011 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20248L7421998-06-0505 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20217Q5271998-05-0404 May 1998 Notification of 980513 Meeting W/Util in Crystal River,Fl to Discuss Issues Related to Increased Number of Sea Turtles Entering Crystal River Intake Canal,Requirements of Endangered Species Act ML20217Q5551998-05-0101 May 1998 Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3 ML20216J5241998-04-15015 April 1998 Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20203A3651998-02-12012 February 1998 Notification of Meeting W/Fpc on 980225 in Rockville,Md Re Technical Discussions Concerning IPE Submittal ML20199F9211998-01-27027 January 1998 Informs That on 971215 FPC Submitted Jco Re Control Complex Habitabiltiy Envelope ML20199A4851998-01-0707 January 1998 Notification of 980112 Meeting W/Util in Rockville,Md to Present Status of Resolution Issues Addressed in NRC CAL, ML20199A4811998-01-0505 January 1998 Notification of 980108 Meeting W/Util in Rockville,Md to Discuss Control Complex Habitability Envelope Including NRC Staff Assessment of FPC Justification for Continued Operation (NRC Ltr ) ML20203C4761997-12-0505 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Util Response to Staff 971126 Request for Addl Info Re SBLOCA License Amend Submittal ML20202E6581997-11-26026 November 1997 Notification of 971202 Meeting W/Util in Rockville,Md to Discuss Seismic Qualification of Mechanical & Electrical Equipment (A46 Issue) & Large Bore Piping & Pipe Support Calculations ML20198Q4231997-11-0404 November 1997 Notification of Meeting W/Fpc on 971120 in Rockville,Md Re Plant Mgt Corrective Action Plan & Mc 0350 Restart Panel Meeting ML20198Q4921997-11-0404 November 1997 Notification of Meeting W/Fpc on 971114 in Rockville,Md Re Control Complex Habitability envelope-working Level Technical Discussions ML20199B9791997-11-0404 November 1997 Notification of Change in Time & Room Number of 971120 Meeting W/Util in Rockville,Md Re Plant,Unit 3 Mgt Corrective Action Plan & Manual Chapter 0350 Restart Panel Meeting ML20199C4821997-11-0404 November 1997 Notification of Change in Room Number & Purpose for 971114 Meeting W/Fpc Re Control Complex Habitability Envelope - Working Level Techincal Discussions & Request for Addl Info Re SBLOCA ML20198Q2751997-11-0404 November 1997 Notification of 971106 Meeting W/Util in Rockville,Md to Discuss Crystal River 3 Restart Schedule Issues ML20217K8131997-10-17017 October 1997 Notification of 971028 Meeting W/Util Re Working Level Discussions Re EDG Mods,Testing & Qualification ML20212F2361997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20 ML20198R8001997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20.Meeting Cancelled & to Be Rescheduled ML20198K0451997-10-15015 October 1997 Revised Notification of 971022 Meeting W/Util in Rockville, MD to Discuss Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes.Listed Attendees Encl ML20211P4381997-10-0909 October 1997 Notification of 971022 Meeting W/Util in Rockville,Md to Discuss Working Level Technical Discussions Relating to FPC Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes ML20216J4361997-09-10010 September 1997 Notification of 970918 Meeting W/Util in Rockville,Md to Discuss Changes to EOP to Reflect TSs Change Request Re Mitigation of Small Break LOCAs & Associated Design Basis Changes ML20217Q9611997-08-28028 August 1997 Notification of 970905 Meeting W/Util in Rockville,Md to Discuss Licensee Schedule & Status of Licensing Submittals Required for Restart ML20217D3341997-07-30030 July 1997 Transmits Attachment D to Memo of 970729,which Forwarded Minutes of Crystal River 3 Restart Panel Meeting Held 970722.Memo Did Not Include Attachment D as Result of Inadvertent Error ML20141C5761997-06-23023 June 1997 Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 ML20148J7341997-06-13013 June 1997 Notifies of 970624 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed License Amend for Addressing Emergency Diesel Upgrade,Emergency Feedwater,High Pressure Injection Sys & Small Break LOCA Design Basis Issues ML20141H4691997-05-21021 May 1997 Notification of 970611 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Findings Related to 10CFR50,App R Design Basis Issues ML20148C0851997-05-0707 May 1997 Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown ML20148C0931997-04-17017 April 1997 Requests Concurrence in Adjusting SALP Period for Plant Facility Until Six Months After Restart of Unit ML20137V2781997-04-15015 April 1997 Notification of 970423 Meeting W/Florida Power Corp in Rockville,Md to Discuss Status of Licensing Activities & Actions ML20137D5741997-03-25025 March 1997 Forwards Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr.W/O Encl ML20137A1391997-03-13013 March 1997 Requests That Pp Number 73 Be Removed,Destroyed & Replaced W/Encl Corrected Pp Number 73 to Physical Security Plan.Page Withheld ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20135E1991997-03-0404 March 1997 Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents ML20134H5211997-02-0707 February 1997 Notification of Meeting W/Fpc on 970218 in Rockville,Md to Discuss & Review Status of Licensing Activities & Actions ML20147C3351997-01-27027 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960322-29 ML20133K9871997-01-16016 January 1997 Discusses Util Which Submitted 30 Day Special Rept 96-03 & Informed NRC of Plan to Abandon Two Peak Seismic Monitoring Instruments.Subj Plan Found to Be Acceptable ML20210L3471997-01-14014 January 1997 Responds to 960926 Memo to Ew Merschoff Re Proposed Enforcement Actions Resulting from Crystal River Integrated Performance Assessment Process for Insp Rept 50-302/96-07. Planned Disposition of Potential Enforcement Actions Listed ML20203B3911996-12-24024 December 1996 Forwards Rept of Investigation Re Alleged Discrimination Against Senior Licensed Operations Supervisors DA Fields & RP Weiss (Case 2-95-020 & 2-95-021) ML20203B5281996-12-0404 December 1996 Expresses Appreciation for Prompt Review of Six Transcripts Provided in 961003 Memo 1999-09-03 |
Contents
Text
_-. - _ . - .. . _ . . . .
APR 111986 bO Docket No. 50-302 MEMORANDUM FOR: John F. Stolz, Director, PWR Project Directorate #6 Division of PWR Licensing-B
SUBJECT:
FORTHCOMING MEETING WITH FLORIDA POWER CORPORATION, B&W, ET AL.
- Time & Date
- Thursday, April 24, 1986 9:00am-5:00pm i
Location: Phillips Building, Room 110 Bethesda, Maryland
Purpose:
To discuss the CR-3 reactor coolant pump failures.
Requested
Participants:
NRC-FMiraglia, DCrutchfield, CYCheng, JJackson, RBosnak, BDLiaw, RBernero, GHolahan, JStolz, GEdison, CMcCracken, RWeller, ERossi, EJordan, DVerrelli, HSilver, AThadani, GKnighton, VPanciera, TStetka Licensee-WWilgus, et al.
"0DOlllfd. UCUID GY.#
Harley Silver, Project Manager PWR Project Directorate f6 Division of PWR Licensing-B :
cc: See next page l
l 4
PBDf5 QSilver;cf
- #f ///86 i
8604170515 860411 PDR ADOCK 05000302 i S PDR I
l i
l l
MEETING NOTICE DISTRIBUTION PWR PROJECT DIRECTORATE #6 Docket File NRC PDR L PDR PBD-6 Rdg Project Manager-HSilver ORAS HDenton OELD Edordan BGrimes JPartlow (Emergency Preparedness only)
Receptionist NRC Participants I FMiraglia DCrutchfield CYCheng JJackson RBosnak BDLiaw RBernero GHolahan JStolz GEdison CMcCracken RWeller ERossi EJordan DVerrelli HSilver AThadani GKnighton VPanciera, R:II TStetka ACRS-10 OPA N01sen, P-428 Regional Administrator Region-II Resident Inspector
h
[/ '
N 4
"1
,, j UNITED STATES NUCLEAR REGULATORY COMMISSION WA SHING TON, 0. C. 20555 e '._ g l
k j8 April 11, 1986 Docket No. 50-302 MEMORANDUM FOR: John F. Stolz, Director, PWR Project Directorate #6 Division of PWR Licensing-B FROM: Harley Silver, Project Manager, PWR Project Directorate #6 Division of PWR Licensing-B
SUBJECT:
FORTHCOMING MEETING WITH FLORIDA POWER CORPORATION, B&W, ET AL.
Time & Date: Thursday, April 24, 1986 9:00am-5:00pm F-ilS Location: Phillips Building, Room g Bethesda, Maryland
Purpose:
To discuss the CR-3 reactor coolant pump failures.
Requested
Participants:
NRC-FMiraglia, DCrutchfield, CYCheng, JJackson, RBosnak, BDLiaw, RBernero, GHolahan, JStolz, GEdison, CMcCracken, RWeller, ERossi, EJordan, DVerrelli, HSilver, AThadani, GKnighton, VPanciera, TStetka Licensee-WWilgus, et al. ,
4 )
Harle< Silver, Project Manager PWR Project Directorate #6 Division of PWR Licensing-B cc: See next page e=