MONTHYEARML20212D1631999-09-20020 September 1999 Summary of 990908 Meeting with Myap in Rockville,Md Re Plant License Termination Plan.List of Attendees & Licensee Handouts Encl ML20212A3101999-09-14014 September 1999 Summary of 990823 Meeting with Util in Rockville,Md to Discuss License Termination Plan.List of Attendees Encl ML20210G2711999-07-28028 July 1999 Summary of 990707 Meeting with Util in Rockville,Md to Discuss Licensee Termination Plan.List of Attendance & Handouts Encl ML20210B7521999-07-21021 July 1999 Summary,For Docket 7200030,of 990707 Meeting with Myap,S&W & NAC Intl Re Util Plans to Store Spent Fuel Using NAC-UMS Dry Storage Sys.Attendance List,Meeting Handouts & Util Rulemaking Handout,Encl ML20207G2401999-06-0707 June 1999 Summary of 990525 Meeting with Util in Rockville,Md to Discuss Maine Yankee Atomic Power Station License Termination ML20196C3251998-11-23023 November 1998 Summary of 981109 Meeting with Util & SWEC Re Decommissioning Activities & Schedule at Maine Yankee Atomic Power Station.List of Attendees Enclosed ML20236S9811998-07-22022 July 1998 Summary of 980710 Meeting W/Util in Rockville,Md Re Plant Backfit Appeal.Appeal Submitted Per NRC Determination Re Plant Emergency Preparedness Exemption ML20249B8251998-06-17017 June 1998 Summary of 980609 Meeting W/Util in Rockville,Md to Discuss Sf Heatup Analysis That Util Performed in Support of Exemption Requests Submitted Re Emergency Preparedness & Financial Protection ML20202F4691997-12-0101 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md to Discuss Proposed Defueled TSs for Plant.List of Attendees & Handouts Used by Licensee Encl ML20202G8591997-12-0101 December 1997 Summary of 971125 Meeting W/Employees of Myap in Rockville, Maryland Re Proposed Defueled Emergency Plan for Myap Station.List of Attendees Encl ML20211P3801997-10-0808 October 1997 Summary of 970911 Meeting W/Myapco Re Options Available for Storage of Spent Fuel Currently at Site.Meeting Attendee List & Meeting Handouts Encl ML20197F7631997-08-14014 August 1997 Summary of 960429 Public Meeting in Wiscasset,Maine Re Licensee New small-break loss-of-coolant Analysis & Licensee Reanalysis of Potential Containment Pressures Under Postulated Accident Conditions ML20140H5731997-04-0404 April 1997 Summary of 439th Meeting of ACRS on 970306-08 Re Release of AP600 Test Data from Rosa Test Facility,Rept Entitled, Recommendations to Improve Senior Mgt Meeting Process & Independent Safety Assessment of Myaps ML20137L3531997-03-27027 March 1997 Summary of 970320 Meeting W/Util in Rockville,Md Re Outage Activities Identified in Attachment Four & Proposed TS Change 194, Reactor Coolant Flow Rate Requirements. W/List of Attendees & Viewgraphs ML20134P0531997-02-20020 February 1997 Summary of 970212 Meeting W/Listed Attendees in Rockville,Md to Discuss Pending Mgt Svcs Agreement Between Licensee & Entergy Nuclear,Inc.Meeting Closed Due to Proprietary Nature of Info to Be Discussed ML20129E6321996-10-0707 October 1996 Summary of 960730 Meeting W/Myap in Rockville,Md Re Lessons Learned Related to RELAP5YA.Transcript Encl ML20127L7631993-01-21021 January 1993 Summary of 921028 Meeting to Review Licensee Proposed Fuel Pool Reracking ML20127J6121993-01-15015 January 1993 Summary of 921217 Meeting W/Licensee to Discuss Fuel Pool Reracking ML20198D6241992-05-12012 May 1992 Summary of 920507 Meeting W/Util in King of Prussia,Pa Re Current Status of Physical Security Program Being Implemented at Facility ML20055E2491990-07-0505 July 1990 Summary of 900625 Meeting W/Util & C-E Re Control Element Assembly Failures & Corrective Actions.Major Topics Presented Listed,Including Visual Exam Results & Fuel Insp Activity & Results.List of Attendees & Briefing Matls Encl ML20153C1861988-08-23023 August 1988 Summary of Operating Reactors Events Meeting 88-34 on 880823 ML20207F6541988-08-17017 August 1988 Summary of 880816 Operating Reactors Events Meeting 88-33 in Rockville,Md Re Briefing of Senior Managers from Nrr,Osp, AEOD & Regional Ofcs on Events Which Occurred Since Last Meeting on 880809.List of Attendees Encl ML20154J8011988-05-16016 May 1988 Summary Rept of 880427 Meeting W/Util in King of Prussia,Pa Re Licensee Planning & Preparation for Upcoming Outage & Station Performance in Area of Radiological Controls ML20154L1661988-05-10010 May 1988 Trip Rept of 880412-15 Mgt Team Visit to Plant Sites,Two Matls Licensees & Region I Ofcs.List of Team Members & Summary of Observations & Perceptions from Visit Encl.Info Deleted ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20205Q9121987-03-20020 March 1987 Summary of 870306 Meeting W/Util in Bethesda,Md Re Low Level Waste Mgt.List of Attendees,Viewgraphs & APTR-42, Maine Yankee Atomic Power Station In-Situ Decommissioning/Low Level Waste Mgt, Encl ML20211B9491987-02-0909 February 1987 Summary of 870205 Meeting W/Util in Bethesda,Md Re RELAP5YA Computer Code & Use in Small Break LOCA Analysis Pertmi Action Plan Item II.K.3.30.List of Attendees & Presentation Matl Used by Util Encl ML20212G4991987-01-12012 January 1987 Summary of 861216 Meeting W/Util & Intermountain Technologies,Inc in Bethesda,Md Re Large Break LOCA Analysis Axial Power Shape.List of Attendees & Presentation Outline on Steam Cooling Model Rev Encl ML20207J7881987-01-0707 January 1987 Trip Rept of 861218-19 Visit to Framingham,Ma to Examine Plant Spent Fuel Pool Masonry Wall Failure Consequence Analysis.Conclusions Listed ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207A7551986-11-0404 November 1986 Summary of 861022 Meeting W/Util in Bethesda,Md Re Selection of Axial Power Shape for Large Break LOCA Analysis.List of Attendees & Supporting Documentation Encl ML20215N5521986-11-0404 November 1986 Summary of 860930 Second Peer Review Group Meeting in San Francisco,Ca Re Facility Seismic Design Margin Program ML20210G8611986-09-22022 September 1986 Summary of 860909 Meeting W/Util in Bethesda,Md Re Util Large Break LOCA Analysis Axial Power Shape.List of Attendees & Viewgraphs Encl ML20205E2901986-08-13013 August 1986 Summary of 860721-25 Meetings W/Util & Consultants Re Seismic Design Margin Program.Peer Review Group Meeting Scheduled for 860930.Attendee List,Agenda & Contractor Presentation Outline Encl ML20198C6991986-05-19019 May 1986 Summary of 860507-08 Meetings W/Util & Consultants Re Seismic Design Margin Program Activities,Schedules & Manpower Requirements.Attendance List,Viewgraphs & Supporting Documentation Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20128M0751985-05-21021 May 1985 Summary of 850508 Meeting W/Util in Bethesda,Md Re Testing of Offsite Power Supplies ML20216H9751985-04-0303 April 1985 Summary of 850311 Meeting W/Util Re Alternative Approach to 10CFR50,App R,Section Iii.O Requirements.W/List of Attendees ML20140C8561984-06-0404 June 1984 Summary of 840424 Meeting W/Utils & Eqe,Inc Re Update of Seismic Design Review Project ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20148G8601976-11-15015 November 1976 Summary of 761103 Meeting W/Utils,Nus Co,C-E & Lowenstein, Newman,Reis & Axelrad Re Submission of Proposed Measures to Prevent Reactor Vessel Overpressurization in Operating C-E Facilities.Attendance List Encl 1999-09-20
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212D1631999-09-20020 September 1999 Summary of 990908 Meeting with Myap in Rockville,Md Re Plant License Termination Plan.List of Attendees & Licensee Handouts Encl ML20212A3101999-09-14014 September 1999 Summary of 990823 Meeting with Util in Rockville,Md to Discuss License Termination Plan.List of Attendees Encl ML20210G2711999-07-28028 July 1999 Summary of 990707 Meeting with Util in Rockville,Md to Discuss Licensee Termination Plan.List of Attendance & Handouts Encl ML20210B7521999-07-21021 July 1999 Summary,For Docket 7200030,of 990707 Meeting with Myap,S&W & NAC Intl Re Util Plans to Store Spent Fuel Using NAC-UMS Dry Storage Sys.Attendance List,Meeting Handouts & Util Rulemaking Handout,Encl ML20207G2401999-06-0707 June 1999 Summary of 990525 Meeting with Util in Rockville,Md to Discuss Maine Yankee Atomic Power Station License Termination ML20196C3251998-11-23023 November 1998 Summary of 981109 Meeting with Util & SWEC Re Decommissioning Activities & Schedule at Maine Yankee Atomic Power Station.List of Attendees Enclosed ML20236S9811998-07-22022 July 1998 Summary of 980710 Meeting W/Util in Rockville,Md Re Plant Backfit Appeal.Appeal Submitted Per NRC Determination Re Plant Emergency Preparedness Exemption ML20249B8251998-06-17017 June 1998 Summary of 980609 Meeting W/Util in Rockville,Md to Discuss Sf Heatup Analysis That Util Performed in Support of Exemption Requests Submitted Re Emergency Preparedness & Financial Protection ML20202F4691997-12-0101 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md to Discuss Proposed Defueled TSs for Plant.List of Attendees & Handouts Used by Licensee Encl ML20202G8591997-12-0101 December 1997 Summary of 971125 Meeting W/Employees of Myap in Rockville, Maryland Re Proposed Defueled Emergency Plan for Myap Station.List of Attendees Encl ML20211P3801997-10-0808 October 1997 Summary of 970911 Meeting W/Myapco Re Options Available for Storage of Spent Fuel Currently at Site.Meeting Attendee List & Meeting Handouts Encl ML20197F7631997-08-14014 August 1997 Summary of 960429 Public Meeting in Wiscasset,Maine Re Licensee New small-break loss-of-coolant Analysis & Licensee Reanalysis of Potential Containment Pressures Under Postulated Accident Conditions ML20140H5731997-04-0404 April 1997 Summary of 439th Meeting of ACRS on 970306-08 Re Release of AP600 Test Data from Rosa Test Facility,Rept Entitled, Recommendations to Improve Senior Mgt Meeting Process & Independent Safety Assessment of Myaps ML20137L3531997-03-27027 March 1997 Summary of 970320 Meeting W/Util in Rockville,Md Re Outage Activities Identified in Attachment Four & Proposed TS Change 194, Reactor Coolant Flow Rate Requirements. W/List of Attendees & Viewgraphs ML20134P0531997-02-20020 February 1997 Summary of 970212 Meeting W/Listed Attendees in Rockville,Md to Discuss Pending Mgt Svcs Agreement Between Licensee & Entergy Nuclear,Inc.Meeting Closed Due to Proprietary Nature of Info to Be Discussed ML20129E6321996-10-0707 October 1996 Summary of 960730 Meeting W/Myap in Rockville,Md Re Lessons Learned Related to RELAP5YA.Transcript Encl ML20127L7631993-01-21021 January 1993 Summary of 921028 Meeting to Review Licensee Proposed Fuel Pool Reracking ML20127J6121993-01-15015 January 1993 Summary of 921217 Meeting W/Licensee to Discuss Fuel Pool Reracking ML20198D6241992-05-12012 May 1992 Summary of 920507 Meeting W/Util in King of Prussia,Pa Re Current Status of Physical Security Program Being Implemented at Facility ML20055E2491990-07-0505 July 1990 Summary of 900625 Meeting W/Util & C-E Re Control Element Assembly Failures & Corrective Actions.Major Topics Presented Listed,Including Visual Exam Results & Fuel Insp Activity & Results.List of Attendees & Briefing Matls Encl ML20153C1861988-08-23023 August 1988 Summary of Operating Reactors Events Meeting 88-34 on 880823 ML20207F6541988-08-17017 August 1988 Summary of 880816 Operating Reactors Events Meeting 88-33 in Rockville,Md Re Briefing of Senior Managers from Nrr,Osp, AEOD & Regional Ofcs on Events Which Occurred Since Last Meeting on 880809.List of Attendees Encl ML20154J8011988-05-16016 May 1988 Summary Rept of 880427 Meeting W/Util in King of Prussia,Pa Re Licensee Planning & Preparation for Upcoming Outage & Station Performance in Area of Radiological Controls ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20205Q9121987-03-20020 March 1987 Summary of 870306 Meeting W/Util in Bethesda,Md Re Low Level Waste Mgt.List of Attendees,Viewgraphs & APTR-42, Maine Yankee Atomic Power Station In-Situ Decommissioning/Low Level Waste Mgt, Encl ML20211B9491987-02-0909 February 1987 Summary of 870205 Meeting W/Util in Bethesda,Md Re RELAP5YA Computer Code & Use in Small Break LOCA Analysis Pertmi Action Plan Item II.K.3.30.List of Attendees & Presentation Matl Used by Util Encl ML20212G4991987-01-12012 January 1987 Summary of 861216 Meeting W/Util & Intermountain Technologies,Inc in Bethesda,Md Re Large Break LOCA Analysis Axial Power Shape.List of Attendees & Presentation Outline on Steam Cooling Model Rev Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207A7551986-11-0404 November 1986 Summary of 861022 Meeting W/Util in Bethesda,Md Re Selection of Axial Power Shape for Large Break LOCA Analysis.List of Attendees & Supporting Documentation Encl ML20215N5521986-11-0404 November 1986 Summary of 860930 Second Peer Review Group Meeting in San Francisco,Ca Re Facility Seismic Design Margin Program ML20210G8611986-09-22022 September 1986 Summary of 860909 Meeting W/Util in Bethesda,Md Re Util Large Break LOCA Analysis Axial Power Shape.List of Attendees & Viewgraphs Encl ML20205E2901986-08-13013 August 1986 Summary of 860721-25 Meetings W/Util & Consultants Re Seismic Design Margin Program.Peer Review Group Meeting Scheduled for 860930.Attendee List,Agenda & Contractor Presentation Outline Encl ML20198C6991986-05-19019 May 1986 Summary of 860507-08 Meetings W/Util & Consultants Re Seismic Design Margin Program Activities,Schedules & Manpower Requirements.Attendance List,Viewgraphs & Supporting Documentation Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20128M0751985-05-21021 May 1985 Summary of 850508 Meeting W/Util in Bethesda,Md Re Testing of Offsite Power Supplies ML20216H9751985-04-0303 April 1985 Summary of 850311 Meeting W/Util Re Alternative Approach to 10CFR50,App R,Section Iii.O Requirements.W/List of Attendees ML20140C8561984-06-0404 June 1984 Summary of 840424 Meeting W/Utils & Eqe,Inc Re Update of Seismic Design Review Project ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20148G8601976-11-15015 November 1976 Summary of 761103 Meeting W/Utils,Nus Co,C-E & Lowenstein, Newman,Reis & Axelrad Re Submission of Proposed Measures to Prevent Reactor Vessel Overpressurization in Operating C-E Facilities.Attendance List Encl 1999-09-20
[Table view] |
Text
_ . _ ._ _. . . . _ . _ _ -
,; $ 2 01987 Docket No.'50-309 MEMORANDUM FOR: Ashok C. Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B FROM: Patrick M. Sears, Project Manager
. PWR Project Directorate #8 l Division'of PWR Licensing-B
[
SUBJECT:
SUMMARY
OF MEETING HELD ON MARCH 6, 1987 CONCERNING LOW-LEVEL.
, WASTE MANAGEMENT AT MAINE YANKEE-ATOMIC POWER STATION
- The above meeting was held in Bethesda, Maryland, and the names of the attendees 4 are. listed in Enclosure 1. Enclosure 2. lists specific points made at the meeting. Enclosure 3 contains a. copy of material included in Maine Yankee Atomic Power Company's (MYAPCo) presentation. Enclosure.4 is a document thet was presented by MYAPCo as a conceptual overview of the proposal for In-Situ i
Deconmissioning/ Low Level Waste Management.
Representatives of MYAPCo presented a concept which involves'(1) storing all of the State of Maine's low-level radioactive waste along with.the plant's low-level-waste in a temporary storage facility at the Maine. Yankee site.
4 until the termination of the plant's operating license (October 21, 2008);
j (2) decommissioning the plant (2009-2011) and preparing the containment building
- for use as an active low-level waste repository;-(3) . operating the decommissioned 3
containment building as a state-owned low-level waste site for receipt of all low-level waste generated in Maine (2012-2041); and (4) permanently closing the
, low-level waste site (2042).
- - The MYAPCo representative indicated that their next step was to present this i
concept to the State of Maine's Low-level Waste Commission for its approval.
. If approved by that Commission, the concept would have to be approved by-
] the voters in the State, according to State law, in order to be implemented.
The NRC staff indicated to the MYAPCo representatives that, although there are
, many technical issues that need resolution, principal concerns at-this stage
! relate to the policy, legal, and regulatory-implications of such a concept.
i The staff noted the potential precedent-setting nature of such a proposal and i identified several policy issues that would need to be addressed before the i NRC could_ consider the proposal. Some of these concerns are presented in p Enclosure 2.
i Original signea by 8704060122 DR 870320 ADOCK 05000309 Patrick M. Sears, Project Manager
, PDR PWR Project Directorate #8 i Division of PWR Licensing-B
Enclosures:
As stated l cc w/enclosu -
ee next p W PBD#8 BD 8 PBD 0 N SS MPBD#
Pi rp neman RBoyle r AThadani 3/ppdtzer jg/87 d) 'WPerfetti PSears;cf 3/tg/87 l 3/lg /87 3/fo(87 3/2o/87 /87 3/g87
Mr. J. B. Randazza Maine Yankee Atomic Power Company Maine Yankee Atomic Power' Station cc:
Charles E. Monty, President Mr. P. L. Anderson, Project Manager Maine Yankee Atomic Power Company Yankee Atomic Electric Company 83 Edison Drive 1671 Worchester Road Augusta, Maine 04336 Framingham, Massachusetts 07101 Mr. Charles B. Brinkman Mr. G. D. Whittier Manager - Washington Nuclear Licensing Section Head Operations .
Maine Yankee Atomic Power Company Combustion Engi eering, Inc. 83 Edison Drive 7910 Woodmont Avenue Augusta, Maine 04336 Bethesda, Maryland 20814 John A. Ritsher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 State Planning Officer Executive Department 189 State Street Augusta, Maine 04330
, Mr. John H. Garrity, Plant Manager
? Maine Yankee Atomic Power Company l P. O. Box 408 Wiscasset, Maine 04578 i
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue
- King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 Mr. Cornelius F. Holden Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box E Wiscasset, Maine 04578 l
3 M 3 o/6 MEETING SIMtARY DISTRIBUTION PWR PROJECT DIRECTORATE #8 6etFile)
K5 YUK L PDR PBDf8 Rdg '
PKreutzer OGC-Beth EJordan BGrimes ACRS-10 NRC Participants P5 ears FBrenneman RBoyle, NMSS RFonner RPerfetti EWenzinger, R:I 44-'
.C*- 6
Enclosure 1 LIST OF ATTENDEES FOR MEETING HELD WITH MAINE YANKEE ATOMIC POWER COMPANY ON MARCH 6, 1987 Name Affiliation Phone No.
Pat Sears NRR 492-8006 Frank Miraglia NRR 492-7207 Mal Knapp NMSS 427-4433 Paul Lohaus Region I 215-337-5246 Ed Wenzinger, Sr. Region I 215-337-5224 Regis Boyle NMSS 427-4799 Michael Tokar NMSS 427-4748 Tom Cardone NMSS 427-4684 Peter Loysen NMSS 427-4205 Steve Salomon OSP 492-9881 Carl Feldman RES 443-7699 Cardelia Maupin OSP 492-9888 Jane Mapes OGC 492-8695 Robert Fonner OGC 492-8692 Faith Brenneman NRR 492-4415 Ashok Thadani NRR 492-4553 G. D. Whittier Maine Yankee 207-623-3521 J. B. Randazza Maine Yankee 207-623-3521 G. S. Mizuno OGC 492-8505 Renee Perfetti NRR 492-8799 Pete Erickson NRR 492-8194 i
l ;
i
Enclosure 2 NRC COMMENTS o It was stated that endorsement by NRC was not possible without a detailed submittal from Maine Yankee Atomic Power Company (MYAPCo),
followed by an NRC review and exploration of policy, legal, and 4 technical issues.
o The potential impact of this proposal on the low-level waste activities of other states is unclear.
o The use of the containment building for low-level waste disposal may be inconsistent with NRC's decommissioning rule. The link between low-level waste management and decommissioning generates questions about legal implications, current policies, and rules. -
o This proposal appears to be inconsistent with NRC several policies or regulations. For instance, a low-level waste disposal system should not require long-term " active" maintenance such pumping and treatment of water from a desposal unit. Such policies or regulations would have to be considered by the applicant.
o There are many unanswered questions, such as how this proposal affects decommissioning of the plant, and what manpower and detailed tasks are required to maintain the facility.
4 o MYAPCo's proposed feasibility study should be presented to the NRC Commissioners prior to the initiation of an in-depth NRC staff effort.
o The NRC staff suggested the term " Topical Report" used on the report was an inappropriate term for this document in view of NRC review procedures.
MYAPCo COMMENTS o Waste would be packaged to meet requirements for burial at commercial disposal facilities.
o MYAPCo does not foresee large amounts of hazardous waste (chemicals or biological materials mixed with radioactive waste) being stored at the site in the future.
o The NYAPCo representative indicated that they would consider disposing of greater than Class C wastes although the Low-Level i Radioactive Waste Policy Amendments Act of 1985 specifies that 3
disposal of greater than Class C waste is a responsibility that may be assumed by the federal government.
o Funds saved from not dismantling the containment building would be placed in a trust to cover the cost of monitoring the low-level waste facility.
I
- - . - . - , . - - - .- ~ - - - - - -
s Enclosure 3 l
- 1. ,
I l
INTRODUCTION LOWLEVELWASTE/DECOMfSSIONINGSTATUS AIF/NESP-034 PURPOSEOFPROPOSEDALTERNATIVE VOLUETRIC CONSIDERATIONS AVAILABLEAREAS PROCEDURALOUTLINE ADVANTAGEOFCONCEPT REGULATORY /POLITICALCONSIDERATIONS THENEXTSTEP l
1
)
2.
l STATUS i
WASTE
.LOWLEVELWASTEACT-1980
.STATELLWCOMISSION
, LLW COMISSION ACTIVITIES 1980-1986
.PERCEPTIONOFCONSENSUS i
.MAINEYANKEE-CONSTRUCTIONOFLLWSTORAGEFACILITY
,REFERENDUMREQUIRINGV0TERAPPROVALOFANYLLWPLAN 4
a 3.,
)
.DOEHIGHLEVELWASTEMAINESITEINCLUSION
.DOEPUBLICINPUTHEARINGS
.PUBLIC/POLITICALREACTION
. DOUBLING 0FGALVANIZINGOPPOSITION
.EXPANDLLW.COMMISSIONSCOPE .
.THIRDMAINEYANKEESHUTDOWNREFERENDUMINITIATIVE o
.CURRENTSTATELLWACTIVITIES f
4.
I DECOMISSIONING STATUS STUDY COMPLETED--PROMPT DISMANTLEENT APPROVEDBYFERCANDSTATEPUC NON-VIABILITYOFDECOMISSIONING
~
- DECOMISSIONING WASTE DISPOSAL
-REMOVAL 0FSPENTFUEL
-GREATERTHANCLASSCWASTE l l
,?
I
5.
INTACT DECOMISSIONING STUDY - NESP-034
! BASISFORPROPOSEDALTERNATIVE
- .PROVIDESADEFINITIVEPLANUPONWHICHACTION
- CANBETAKENPOLITICAL/ REGULATORY / FINANCIAL.
.PROVIDESAYARDSTICKAGAINSTWHICHOTHER
. ALTERNATIVESMAYBEMEAS6 tad.
.REASSURESPUBLICTHATANACCEPTABLESOLUTION j ISPOSSIBLE.
1 i
[
l l
f
i LOH LEVEL HASTE VOLUMES l
YEARS SOURCE VOLUME (FT3 1 1993-2008 MAINE YANKEE 80,000 28,000 OTHER MAINE GENERATORS l'
2009 - 2041 MAINE YANKEE . .
DECOMMISSIONING i
7
- IN CONTAINMENT 105,642 )
- - OUTSIDE CONTAINMENT 224,469 J
(
- OTHER MAINE GENERATORS 46.200
- TOTAL 484.311 ;
\
{
u____ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ = _ _ _ _ _ . . _ _ _
i l
MAINE YANKEE STATISTICS i
i i
1 CON TAINMENT ,
2,075,000 cu. ft.
j DOME - 645,000 COMPONENTS AND STRUCTURES - 200.000 FREE VOLUME 1,230,000
- FREE VOLUME BELOH GRADE 120.0QQ FREE VOLUME ABOVE GRADE 1,110,000 .
I j CAVITY VOLUME 40,000 '
i j FUEL P0OL VOLUME 54,000 SPRAY BUILD VOLUME BELOW 48,000 :
OPERATING LEVEL l l
VOLUME OF LOH LEVEL HASTE GENERATED 484,000 cu. ft. !
> TO YEAR 2041 FROM MAINE YANKEE
} OPERATION, PLANT DECOMMISSIONING AND l
INSTITUTIONAL LLH GENERATORS l
, L
O 3
\
m aursuant poou t A Ls c r:. - .
b, ??,
- fi) see m enant g
u e_ -
3,
$.:. t I
- y a
b.':
?.
+
. .J .
.' .y 1
. - t . .
caamt : *'
$5 '
s b--
~
G. ' .
D8 sgAL ek
.-a
- -lsras *
- c. ,
4.1 A ..' setw- Futa I -
i':
q h .
y., ,_ _ _ . . . . . . .
-l, g
. ..m -1 ;= ...
. 7 \ d e. _ , g. .y .1 wy, 7
f n -
- . .;
- e 1
-l
- y. .
s..
T:,I '
si .
- ,- m..f
? I L f.f' ' .'d ).O d:?
D . ]- i .
si M .3.l q.- ;g i fa. ;, Jh'- ri.e.
- t. 22c:=. - f* ' =M h *
'*/ 2 .,'f.[TaAws8TE GnaDE - {;:' ,
_'l , _
ys^f
a'i ' T 11 0 '
i
$ j:. , 5? . . .e & . A l?: - a l ki u
~
a - :y.:*?" '.': l E.*LC. k,._f ..
~
i ..x i l((~ ,
' .":;'$NS$$h.$-c:~ .
- :.<?.hh,,
a b,n* Q re ]N[ a U*Q l
A,j ?1 5 N' ;M. :. . ...:'*
-.#P..' N. ;;*.@ '
.,./(7 ' *ffs; e :. .6:i;* C fa.f7. *- ;'*i.:r;- .s M. s. ==.*-
7:., y x N'"j..G S.*'. .3. <= ' 6 . Y;- I
.'.',:\.y: n -l '(iv'?;,": . .*' t<.h'i* T 4'. )f.". !. .< '. :: '.n' %;'
. 2 ; * .- * ^ " . ~- '
- ?
eg,.; m;; !_ .; y *:e :<:: .M.;::. ..
',,;!,.,v .Y-:2 4 .
. ~.74 *
,j;" . :.
. _4
'r'
- ,r,.- *'
.. v s'r **' .n ...**i* I
- *i."[.'. : d - . . ._ ,
4 . . ). ' t l
~J7i:
"i '
RtaM CDust9 ll j: t f rwesP sucTee.sE, C# 64.C' ' .; "Y. MAON SMM l
-.q ;. ] T'a" stret umEn 1
)
- 3. _ ----< ]E ...- arCD4C pagTauertet? Pf7
)
j WASTE CLASSIRCATION
- l "
. 7Q
, .. t .:
' piggqg gg. g.; 1 CLASS C OR GREATER
. . C8 ' . <
4 : .; 'g .t. . S * "-
... .. .. CONTAINMENT BULDINC- l 3 CLASS B B C V'S' ' N '. SOE VIEW
! @ class A I
l l ._ _ . _ _ . __ _____ . _ _
- _ _ _ - - - . _ . _ _ . _ _ _ ~ . _
, _ na . _ _ _ . m-, m - - - - - - - - - - - - - - - - - - -
h kE8 h
I (e. t! '
. .,_ .n I
1
.ii lf
-- f.b... . . . ~-7.- -} -. - . . . = . ..
i ~ '
I
! I .,
m.m
,8j
-y 4 g, l es, 4 ,, I: :; -
5 g.il !. mmm k I t 9 .
=8 l'
, =5-8 l
m CR E
' ;0 E* v
$5 E
o.t -
t b
7 s' 3 u
..~
O 28ll ,gl> .; l6
~
/I >-
i.;
l, ..*
gg 1
Li u*t u T.*, !
c -- ..
'ir l ,
e-
- g 4 .,
1
. y. = 5 j ** 'm~'. ,. 4
s
,j" hy=
! %)g , 1 a..
-N-gy,
- m-
~
, , s~ v,
~<%
e.
s n., 2 T.*
N . f?f:@,.3jfr@Y *
j j ,
1 1.
II : ,
I <
[i s .
l h
, , ,'c-'.. ~
b 1
9, .
.j A N
- ,.. / ..
stret unte i
I
/.
?
j
- 3. anresonrtirare, sentu s,cws rns r$ e y" r"
MA 1:. "
,F: . _,,t..,,.... eru J -
gt,,a*=via w
]~ .I
%:.en .\
h, -
r I
$ ;t '
1
'i r
[ l
{ -
="" g, .
'P
" # ;,& amar==r-
{e 4
g mar er ,
j
, [ $,7[er%s,In T NAI.7 m ,
rateurarca om.
j .,i A' ,.
i m
{ . . . ..-
N' ' ' FIGURE NS-8-3
' N c<
QG ,
, 2..a ;j,! t- .
"' CONTARMENT FLOOR l
ENCAPSULATIONDECOMMISSIONING
- 1. END OF LICENSED LIFE ' REACTOR DEFUELED.
- 2. ALLLARGE" CLEANABLE"COMPONENTSREMOVEDFROM -
m CONTAINMENT. (I.E. REACTOR COOLANT PUMP MOTORS, FANS, COOLERS,STEAMLINES,ETC.).
$ 3. INSTALLALL" WASTE"CORECOMPONENTSINTOREACTOR VESSEL (I.E. OLD CONTROL RODS, INCORE INSTRUMENTATION, ETC.) COMPLETE FILLING WITH C+
ANDCWASTE.
- 4. DEWATERVESSELANDSEALCLOSED--ENCAPSULATING HIGHESTLEVELWASTE.
-- j
a
- 5. REMOVE ALL RADI0 ACTIVE COMP 0ENTS FROM AREAS EXTERNAL TO CONTAINENT AND PREPARE FOR PLACING IN CONTAINENT (I.E. HPSI, LPSI PUMPS, DEMINERILIZERS, COOLERS,' FILTERS,ETC.).
- 6. INSTALLALLVERYHIGHACTIVITYCOMP0NENTSPLUS REMAININGCANDBWASTEINREFUELINGCAVITY (I.E.OLDSTEAMGENERATORS,REACTORCOOLANTPUMP ASSEMBLIES, VALVES,DEMINERALIZERS,ETC.).
s
- 7. FILL CAVITY WITH SAND / LIE MIITURE AND CAP WITH 24"REINFORCEDCONCRETESLAB--ENCAPSULATINGMID LEVELWASTE.
i
. 8. PLACE ALL L0ER ACTIVITY MATERIAL (A) IN CONTAINENT-FREE VOLUE AREAS. COMPONENTS OR WASTETOBEPLACEDBELOWGRADEMUSTBEINHIGH INTEGRITYCONTAINERS.
1 -. . _ .
- 9. CLOSEANDSEALALLCONTAINMENTPENETRATION EXCEPTTHOSENECESSARYTOSERVEWASTE RESPOSITORY.
- 10. TURNFACILITYOVERTOSTATEWASTEAUTHORITY
~
FOROPERATION.
- 11. CONTINUEINSTALLINGWASTEUSINGAVAILABLE VOLUME-(30+ YEARS).
- 12. SEALREMAININGCONTAINMENTPENETRATIONSTO PR0HIBITACCESS.
- 13. CONTINUE" PERPETUAL"MONITORINGFOR100 YEARS l VIADECOMMISSIONINGTRUST. (I.E.20 YEARS CARETAKEROVERSIGHT,100YEARSGROUNDWATER SAMPLING.)
ADVANTAGES OF CONCEPT
' ENCAPSULATION' TECHNICALLY. FEASIBLE VIABLE SOLUTION TO MAINE'S LLH STORAGE AND DISPOSAL MAXIMUM UTILIZATION OF EXISTING F'ACILITY, SECURITY AND TECHNICAL EXPERTISE -
SITING AND. LICENSING OF OTHER LLH FACILITY UNNECESSARY .
LONG TERM PROTECTION TO PUBLIC HEATH AND f SAFETY AFFORDED BY THE CONTAINMENT IS EQUAL TO OR BETTER THAN OTHER LLH DISPOSAL ALTERNATIVES I
FACILITY IS MONITORABLE l
MINIMIZE RADI0 ACTIVE HASTE SHIPMENTS OVER PUBLIC ROADHAYS, MINIMIZING PUBLIC RISK MOST ECONOMICAL ALTERNATIVE TO DISPOSAL OF MAINE'S LLH OVERALL ENVIRONMENTAL IMPACT MINIMIZED
- . z. . - . - . -
l l
REGULATORY / POLITICAL CONSIDERATIONS i APPLICATION FOR TERMINATION OF OPERATING ,
LICENSE INCLUDING DECOMISSIONING PLAN POSSESSION ONLY LICENSE AMENDMENT -
ORDER TO DECOMMISSION DECOMMISSION FACILITY LICENSE TERMINATED 10CFR61 LICENSE FOR LLH DISPOSAL FACILITY l STATE APPROVAL OF LLH FACILITY l
~* '