h nuary ?1, 1993 Docket No. 50-309 LICENSEE: Maine Yankee Atomic Power Company UTillTY:
Maine Yankee Atomic Power Station
SUBJECT:
SUMMARY
OF MEETING HELD Oh OCTOBER 28, 1992 TO DISCUSS FUEL P0OL RERACKING (TAC NO. M85218)
The licensee has announced plans to rerack their fuel pool and is scheduled to submit the attendant request to amend their Technical Specifications in January 1993. This meeting was requested by the staff to review the licensee's proposed seismic methodology.
Staff questions on the 11censee's seismic methodology focused on ensuring that the enveloping analyses were comprehensive.
Staff questions included proposed seismic input acceleration values and spectrum, power spectral density and energy distribution of input time histories, vaiiattor, of input time histories, and shear wave velocity in site bedrock.
In addition, the staff sought to ensure the licensee's analysis would include seismic effects on both full and empty fuel racks, and the interaction between rack mounting feet and the pool liner.
Further questions about the pool liner included a determination that the licensee has leak monitoring capability at every liner weld, and that the licensee will verify full contact between the liner and concrete backing (no liner ripples).
The staff also recommended that design and installation acceptance specifications be developed, and that the licensee provide a rationale as to why the proposed hydrodynamic coupling is conservative, it was concluded that the licensee has the proper background and support for providing adequate design margins, and appears to be proceeding in a direction that should ensure comprehensive analyses to support their amendment application.
Original signed by E. H. Trottier, Project Manager Project Directorate 1-3 2,600b.fu Division of Reactor Projects _ i/ii Office of Nuclear Reactor Regulation
Enclosures:
DISTRIBUTION:
1.
Meeting Agenda Docket File ^50-309 W. Butler Sang Bo Kim 2.
List of Attendees NRC & Local PDRs E. Trottier G. Lee PDI-3 Reading T. Clark G. Bagchi cc w/ enclosures:
T. Murley/F.Miraglia OGC ACRS (10)
See next page J. Partlow E. Jordan V. McCree, EDO S. Varga J. Linville, RI J. CalvA n
OFFICE LA PDi.3 _ m PM:PDI(3 D:PDI-3 / [-b TCladb ETr[tDk'iihw WButler W mE
//O/93 Oi /~21/93 l /a/93
/
/
/
/
l DATE OfflCIAL RECORD COPY 93012YO35"93[>iYim R MTS
{
PDR ADOCK 05000309 P
- - _ - - - ~.. - -. _.
.., -. _ _ ~..
. - _ - _ - -.-....- -~_-
i
[#'fCEE
'~g UNITED STATES 4
l f
g NUCLEAR REGULATORY COMMISSION i
g l
W ASHINGTON, D. C. 20$55 I
\\
j' January 21, 1993 i
}
Docket No. 50-309 LICENSEE: Maine Yankee Atomic Power Company UTill1Y:
Maine Yankee Atomic Power Station t
)
SUBJECT:
SUMMARY
OF MEETING HELD ON OCTOBER 28, 1992 TO DISCUSS FUEL P0OL RERACKING (TAC NO. M85218) i-The licensee has announced plans to rerack their fuel pool _and-is scheduled to submit the attendant request to amend their Technical Specifications in January 1993.
This meeting was requested by the staff to review tho licensee's proposed seismic methodology.
j Staff questions on the licensee's seismic methodology focused on ensuring that the enveloping analyses were comprehensive. Staff questions included proposed a
seismic input acceleration values and spectrum, power spectral density and i
energy distribution of input time histories, variation of input time
}
histories, and shear wave velocity in site bedrock.
In addition, the staff sought to ensure the licensee's analysis would include seismic effects on both full and empty fuel racks, and the-interaction between i
rack mounting feet and the pool.llner.
Further questions about the pool liner included a determination that the licensee has leak monitoring capability at i
every liner weld, and that the licensee will verify full contact between the liner and concrete backing (no liner ripples).
The staff also recommended that design and installation acceptance specifications be developed, and that I
the licensee provide a rationale as to why the proposed hydrodynamic coupling j
is conservative.
It was concluded that the licensee has the proper _ background and support for l
providing adequate-design margins, and appears to be proceeding in a direction that should ensure comprehensive analyses to support their amendment application.
1 E. H. Trottier, Project Manager j
Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation 4
L
Enclosures:
l.
Meeting Agenda-l 2.
List of Attendees 4
cc w/ enclosures:
}
See next page 1
1.
- -. ~,,,-
r._,
e 7
a 4
Maine Yankee Atomic Power Company Maine Yankee Atomic Power Station ec:
Mr. Charles B. Brinkman Mr. James R. Hebert, Manager Manager - Washington Nuclear Nuclear Engineering and Licensing-Operations Maine Yankee Atomic Power Company Combustion Engineering, Inc.
83 Edison Drive 12300 Twinbrook Parkway, Suite 330 Augusta, Maine 04336 Rockville, Maryland 20852 Mr. Robert W. Blackmore John A. Ritsher, Esquire Plant Manager Ropes & Gray Maine Yankee Atomic Power Company One International Place P.O. Box 408 Boston, Massachusetts 02110-2624 Wiscasset, Maine 04578 Mr. Uldis Vanags Mr. G.- D. Whittier, Vice President State Nuclear Safety Advisor Licensing and Engineering State Planning Office Maine Yankee Atomic Power Company State House Station #38 83 Edison Drive Augusta, Maine 04333 Augusta, Maine 04336.
Mr. P. L. Anderson, Project Manager Mr. Patrick J. Dostie Yankee Atomic Electric Company State of Maine Nuclear Safety 580 Main Street inspector Bolton, Massachusetts 01740-1398 Maine Yankee Atomic Power Company P.-0. Box 408 Regional Administrator, Region I Wiscasset, Maine 04578 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. Charles D. Frizzle, President King of Prussia, Pennsylvania 19406
-Maine Yankee Atomic Power Company 83 Edison Drive First Selectman of Wiscasset Augusta, Maine 04336 Municipal Building U.S. Route 1 Wiscasset, Maine 04578 Mr. Charles S. Marschall Senior Resident, Inspector Maine Yankee Atomic Power Station U.S. Nuclear Regulatory Commission P.. O. Box E' Wiscasset, Maine 04578
..a.U
4 o
4 1
Agenda for NRC/ Maine Yankee Technical Interface Peeting Discussion Tooics 1.
Proposed Seismic Methodology i
2.
ANSYS Computer Program j
3.
Fluid Coupling:
Fuel to Rack
~
4.
Fluid Coupling:
Rack to Rack 5.
Spectrum of Enveloping Analyses a.
Coefficients of Friction b.
Rack Fill c.
Rack Size 1
i i
1 4
1
4 MAINE YANKEE SPENT FUEL RERACKING MEETING OCTOBER 28. 1992 LIST OF ATTENDEES NAME ORGANIZATION E. H. Trottier NRR/ Project Manager - MY Robert Jordan Maine Yankee Sang Bo Kim NRR/DE/ECGB Peter Titus SWEC Gye H. Lee -
NRR/DE/ECGB Goutam Bagchi NRR/DE/ECGB George East SWEC
- --ii r
i
.~._...2
......m.....
in
-.-aha..h-
-