ML20196E175

From kanterella
Revision as of 09:11, 5 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Addendum 2 to Vol 2 to WCAP-12071, Westinghouse Large-Break LOCA Best Estimate Methodology,Vol 2: Application to Two- Loop PWRs Equipped W/Upper Plenum Injection,Addendum 2: Pbnp Plant Specific Analysis
ML20196E175
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/31/1988
From: Dederer S, Hochreiter L, Schwarz W
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML19295G789 List:
References
WCAP-12071, WCAP-12071-V02-ADD02, WCAP-12071-V2-ADD2, NUDOCS 8812090285
Download: ML20196E175 (183)


Text