Rept of Investigation Re Gap Allegations Concerning Lack of NRC Action When Notified of Wrongdoing by Util.Region IV Should Have More Promptly Responded to Anonymous Allegations
ML20154R146
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/30/1985
From: Connelly S, Mulley G
NRC OFFICE OF INSPECTOR & AUDITOR (OIA)
To:
Shared Package
ML20154R138 List:
References
NUDOCS 8603280102
Download: ML20154R146 (20)


Text

. , . s .-

~

OFFICIAL U 0"LY pR RFGug

/ I%

) REPORT OF INVESTIGATION TITLE: COMANCHE PEAK - GAP ALLEGATIONS (LACK 0F NRC i

ACTION WHEN NOTIFIED OF WRONGD0ING BY UTILITY)

=.c..... ... -

-  ?, .. ..

s 9

)

PREPARED BY:

y }f George /A. Mulley, Jr. 8 8- 3 0 - 8 ['

. DATE:  ;

Investigator, 0IA

a. ..t '

i

-.m... . . . < , , .

...,: a. : n, APPROVED BY:

fqW p =

b &

Sharon R. Co elly l Director, 0IA DATE: f 3 o g g ""

l l

i l OFFICE OF INSPECTOR & AUDITOR U.S. NUCLEAR REGULATORY COMMISSION

$$ganggggg gg83 A

p FREEDOM OF INFORMATION/ R ACY ACT EXEMPTION .(.h.f...(.5) & (7) (d 0FFICIA SE ONLY

=

UtHWAL TUNI.Y .

g BACKGROUND On November 1,1984, Ms. Billie Pirner Garde, Director, Citizen's Clinic, Government Accountability Project (GAP), Institute for Policy Studies, was interviewed by the Office of Inspector and Auditor (OIA), U.S. Nuclear Regulatory Commission (NRC) concerning allegations of NRC misconduct regarding the Comanche Peak Steam Electric Station (SES) (Attachment 1). During the interview, Garde ' alleged that Region IV, NRC, and the Office of Investigations (01), NRC, did not properly . respond when notified of possible wrangdoing by Texas Utilities Generating Company (TUGCO), .the applicant at Comanche Peak S ES .- Garde outlined three instances when Region IV and 01 allegedly failed to act when notified of wrongdoing by TUGCO:

On March 8,1984, the Comanche Peak SES Quality Assurance (QA) Supervisor detained eight quality control (QC) inspectors in a room then searched their desks and confiscated inspection reports documenting numerous deficiencies with electrical equipment.

In September 1983, TUGC0 management pressured a contract inspector to reword his inspection report concerning the adequacy of the paint coatings program at Comanche Peak SES.

TUGC0 had falsified inspection reports concerning improper installation of liner plates for the spent fuel tank, refueling cavities, and two transfer canals.

On November 13, 1984, 0IA initiated an investigation into the alleged inaction by Region IV and 0I when notified of these instar.ces of wrongdoing by TUGCO.

SUMMARY

Region IV and 0I allegedly failed to act when notified that on March 8,1984, the Comanche Peak SES QA Supervisor detained eight QC inspectors in a room then searched their desks and confiscated inspection reports documenting numerous deficiencies with electrical equipment.

Paul S. Check, Deputy Regional Administrator, Region IV, NRC, when interviewed (Attachment 2) stated that at.about 9:00 a.m., March 8, 1984, he received'a telephone call from TUGC0 Vice President for Nuclear Operations, Billy Ray Clements, who briefed Check on what Clements described as " provocative behavior" on the part of electrical QC inspectors at Comanche Peak SES.

Reportedly, some of the electrical QC inspectors were wearing T-shirts with the message "I pick nits" printed on them. Additionally, the QC inspectors were finding numerous problems with electrical construction allegedly as a result of conducting " destructive" inspections. Clements stated he was concerned for the safety of the QC inspectors because craft workers might retaliate for what the QC inspectors were doing. For this reason, the QC inspectors had been sequestered in a room and were going to be interviewed by TUGC0 management. After the telephone conversation, Check discussed the situation with Richard P. Denise, Director, Division of Reactor Safety and Projects, Region IV. They agreed that Region IV would wait for further information before taking any action.

04 C A. US ONLY

rarf*lpa Ai 110T f i 'V wi s suuns uv6 t u.s i -

2 At about 11:00 a.m. , March 8,1984, Check received another telephone call -from Clements to update him on the ongoing situation at Comanche Peak SES.

Clements reported that the QC inspectors had been sent home and they would be allowed to return when properly attired. Clements also reported there was.no evidence that the QC inspectors had engaged in sabotaga during their inspections. Check, Denise, and William Brown, the Regional Attorney, dis-cussed the information from Clements and' agreed that TUGC0 seemed to be handling the situation responsibly. Because there was no health and safety issue, Check did not see any need for immediate NRC involvement in what appeared to be a labor-management problem.

Soon after the second telephone call from Clements, a meeting was held at i

Region IV to discuss the situation at Comanche Peak.SES. The consensus of the

. participants at the meeting was there was no need for NRC involvement in'the

! situation at Comanche Peak SES. It was suggested that Region IV contact the i NRC resident inspectors at Comanche Peak SES and have them observe and gather

. morr information on what was happening.

{ Although unsure of the details, Check recalled that sometime after the tele-phone calls from Clements, Region IV learned that TUGC0 had seized records

from the desks of the CC inspectors. In the event the documents might, at a i later date, be evidence or be of interest to the Atomic Safety and Licensing j Board (ASLB), Region IV immediately took action to confiscate the documents
from TUGC0 and secure them in the NRC's Resident Inspector's office for safe-keeping.

i

) Paul S. Check prepared notes concerning his telephone conversations with 2

Bill Clements and his recollection of the events regarding the Comanche- Peak

- SES T-shirt incident (Attachment 3). The notes by Check indicate that i Region IV thought the utility was handling the incident in a responsible manner. A decision was made to ask the NRC Resident Inspectors at Comanche Peak SES to observe, but not interfere with, the developing situation.

1 i In a July 10, 1984, deposition before the Atomic Safety and Licensing Board (ASLB) in the matter of Comanche Peak SES (excerpts at Attachment 4),

! Billy Ray Clements stated that during the morning of tie T-shirt incident at Comanche Peak SES, he was informed of the ongoing incident while at his office in Dallas, Texas. Clements then telephoned Paul Check and informed him of the situation. Clements reported to Check that QC inspectors wearing T-shirts bearing some reference to " nit-picking" were being kept in a room at Comanche Peak SES. Clements told Check that the reason for the detention of the QC

, . inspectors was possible animosity between TUGC0 construction workers and QC

. inspectors. Clements did not want any physical violence or verbal abuse

between these groups of employees.

t

? In testimony before the ASLB on September 11, 1984, in the matter of the

!- Comanche Peak SES (excerpts at Attachment 5), Clements stated that during the day of the T-shirt incident, he telephonically discussed the situation with 1 Region IV at least three or four times. After reviewing the handwritten notes l prepared by Check to document the telephone conversations between Clements and l Check (Attachment 3) Clements confirmed to the ASLB that the first page and a i half of the notes accurately recorded what he told Region IV. However, i

Clements could not recall making the comments listed under " Update" on the bottom of the second page of the notes. Additionally, Clements was not i

i l r vm M :N 0 63 - V-

, u , I w m. - -

%... _ . _ _ . _ _ . - _ - ~ _

( ~m r. m r rm u x _

J g n ._U91. qik k certain if the names listed in the notes were correct. Clements also commented that some background information concerning the meaning of the saying "I pick nits" was not recorded in Check's notes. In response to a question, Clements stated that he did not consider the inspections being conducted by the electrical inspectors as being destructive or sabotage. He considered the inspectors as just' being over-aggressive.

Richard P. Denise, Director, Division of Reactor Safety and Projects, Region IV, when interviewed (Attachment 6) stated that at about 9:30 a.m.,

March 8,1984, he was advised by Check that Billy Clements had telephonically reported to Region IV that some Comanche Peak SES QC inspectors had arrived at work wearing T-shirts bearing the statement "I pick nits." TUGC0 management apparently considered the T-shirts to be provocative and TUGC0 was concerned for the safety of the inspectors. For this reason, the QC inspectors had been sequestered in a room and were going to be interviewed by a TUGC0 consultant.

Reportedly, this situation had developed from a belief that the QC inspectors had been conducting destructive testing of electrical construction.

Denise and Check briefly discussed the information provided by Clements. Tncy were primarily concerned with whether the QC inspectors were engaged in sabotage that should be investigated by NRC. Check considered the situation to be a labor-management problem, and he thought Region IV should wait for further information from Clements before Region IV took any action. On the other hand, Denise thought Region IV should act to gather more information about the ongoing situation and then decide if the Region should become involved. Check and Denise agreed to await further information from Clements before taking any action.

At about 11:00 a.m., March 8, 1984, Clements telephoned Check and stated that

-TUGC0 had no proof of destructive testing and there was no clear evidence of sabotage. Clements also advised that the QC inspectors would be sent home without pay until the T-shirts were taken off and that they could return to their jobs if they were still there. Clements stated that TUGC0 would keep Region IV informed.

At about noon, March 8,1984, a meeting was held between Check; Denise; Eric H. Johnson, Chief, Reactor Projects Branch II, Division of Safety and Projects, Region IV; and Doyle M. Hunnicutt, Chief, Reactor Project Section B, Reactor Projects Branch 2, Region IV. At the meeting, Hunnicutt indicated he had spoken with the NRC resident inspectors at Comanche Peak SES that morning and they had told him they had just received telephone calls regarding the ongoing incident. Apparently the resident inspectors had taken no action in response to the information except to notify Hunnicutt.

Hunnicutt instructed the resident inspectors to not-become involved in what he considered to be a labor-management problem. Hunnicutt briefed the meeting on what the resident inspectors had told him about the situation at Comanche Peak and it was at this time that Denise learned the QC inspectors had reportedly been physically detained, locked in a room, and escorted when they left the room. Denise stated that Hunnicutt did not mention at the meeting that documents had been seized. During this meeting, Denise recommended, and it was agreed to, that the Senior Resident Inspector for Operations at Comanche Peak SES would go to the location of the incident, learn what was transpiring, and take pictures of the inspectors in their T-shirts and of the " sabotage" Mr n A f Mr Mt 11 vil . u n . um i . m. :

' ' ~ ~

,~..:

-^

. , a re. . . , L.,,

Urribit1 U4L UILI-- -

4 areas. Denise asked Hunnicutt to relay these instructions to the resident

inspectors. Apparently, Hunnicutt passed the instructions to the resident inspectors at about 12:30 p.m., March 8, 1984; however, by this time the incident was over and the QC inspectors had been escorted off the site.

At 11:13 a.m., March 9, 1984, Clements again telephoned Check to provide an

, update. Denise was present for the telephone conversation. Among other topics, Clements reported that TUGC0 had looked at the QC inspector's personal belongings for inspection documents. It seemed that TUGC0 was interested in non-conformance reports. This was the first ind_ication that'TUGC0 was reviewing inspection documents.

l At about 3:17 p.m., March 9,1984, Denise and Eric Johnson had a telephone

conversation with David N. Chapman, Quality Assurance Manager, TUGCO. Chapman i

reviewed the incident and discussed some perceptions ~of the inspectors. The

, inspectors thought TUGC0 management was putting too much emphasis on non-problems and that the incident on March 8,1984, resulted from the lack of supervisor communications. The inspectors-did not want to make a big scene and now realized how the T-shirts could be considered provocative and n'on-professional. Chapman further related that TUGC0 had removed documents from the inspector's work area. This was the first time that Denise was informed

that documents had been sein d by TUGCO. During the telephone conversation,
Chapman was asked to lock ui, the documents that were seized, limit access only to NRC and a selected TUGC0 reviewer, and to get the boxes of material to the l NRC resident inspector. Chapman agreed to deliver the material to the NRC Senior Resident Inspector for Construction.

, At about 4:00 p.m., March 9,1984, Denise briefed Hunnicatt on the information provided by Chapman and instructed Hunnicutt to ensure the documents were secured by NRC.

Richard P. Denise prepared notes concerning his knowledge of the events surrounding the T-shirt incident (Attachment 7). These notes were used to 1 support Denise's recollection of the incident.

I In a memorandum dated April 20, 1984 (Attachment 8), Richard P. Denise instructed Doyle M. Hunnicutt to copy the material seized by TUGCO, forward a copy of the material to Region IV'and send a copy of relevant material to each i

QC inspector, and retain the seized material at the Senior Resident

Inspector for Construction's office.
Doyle M. Hunnicutt, Chief, Reactor Project Section B, Reactor Project

! Branch 2, Region IV, when interviewed (Attachment 9), stated his recollection

, of the circumstances surrounding the March 8,1984, T-shirt incident at Comanche Peak SES was very vague. However, Hunnicutt stated he testified at

! length before the ASLB in October 1984 concerning the incident. At that time, Hunnicutt's memory was much fresher concerning what took place. Hunnicutt stated the testimony he provided the ASLB was correct, and he had no changes.

In prepared testimony for the ASLB (Attachment 10) Doyle M. Hunnicutt detailed

! his involvement in the March 8, 1984, "T-shirt incident" at Comanche Peak SES.

Hunnicutt stated that at about 11:00 a.m., March 8,1984, the Senior Resident i Inspectors at Comanche Peak SES telephoned him at Region IV and reported to him that an anonymous caller had relayed information to the NRC resident l

~

fu f i i,e( p*'

1 T t Ju I trillL Ush L a s J -

k

I n ran' n- i e nw v

~~ u Ilu n. Ld. U L e -

5 inspectors concerning an event taking place at Comanche Peak SES. Both Senior Resident Inspectors told Hunnicutt that the caller ' stated that Comanche Peak SES management and Brown and Root (B&R) security personnel were going through desk drawers and files in the electrical and mechanical quality control office in the safeguards building. The caller had also stated he was concerned that some inspectors were being detained by the' licensee. The caller had' requested that an NRC representative come to the safeguards building. Hunnicutt instructed the Resident Inspectors not to go to the safeguards building until he discussed the situation with Region IV management. Hunnicutt stated that at that time he believed that the issue was a TUGC0 labor-management problem and not something affecting the health.and safety of the plant. At about noon, March 8,1984, a Region IV reactar inspector visiting Comanche Peak SES telephoned Hunnicutt and stated he hd received an anonymous telephone call and shortly thereafter a visit from an individual who did not disclose his name. Both the telephone caller and the individual expressed concern about licensee personnel going through the personal effects and records in the desks of inspectors in the safeguards building. The caller and the person who came to the NRC offi_ce told the reactor inspector that the cause of the management action was the wearing of T-shirts by QC inspectors bearing a statement referring to " nit pickers".

Following the telephone calls, Hunnicutt discussed the information with his Branch Chief, Eric H. Johnson, and it was decided that Region IV should be alert to the concerns of these individuals but should not participate in the ongoing incident between Comanche Peak management and the T-shirt personnel.

These instructions were relayed to the NRC inspectors at Comanche Peak SES.

Subsequently, a meeting was held between Hunnicutt, Johnson, and Richard Denise. During this meeting Hunnicutt discussed the telephone conversations and what could be accomplished by NRC involvement. After this meeting, the three participants discussed the entire situation with Paul Check. During the meeting Check stated that Billy Clements of TUGC0 had also telephoned him concerning the incident with the T-shirts. The four then determined that there was no indication that NRC regulations had been violated nor that there was a threat to health and safety of the plant. However, it was decided to monitor the incident and gather more knowledge of what was happening. Consequently, between 12:30 p.m. and 1:00 p.m., March 8, 1984, Hunnicutt telephonically instructed the Senior Resident ?nspector for Operations at Comanche Peak SES to make a reasonable attempt to meet with the T-shirt personnel. The Senior Resident Inspector for Operations was also instructed to attempt to take photographs of the inspectors wearing the T-shirts and to attempt to photograph any electrical wiring which appeared to have been damaged. At about 1:30 p.m. , March 8,1984, the Senior Resident Inspector for Operations telephoned Hunnicutt and informed him that the QC inspectors had already been escorted off the site and that he had been unable to take any pictures. The Senior Resident Inspector had found one wire which appeared to have some scratch marks but had no other indication of damage.

Sometime during the afternoon of March 8,1984, Hunnicutt was informed by Paul Check that Comanche Peak management had taken documentary material from the desks of the QC inspectors. Check indicated he had been told this by Billy Clements. There were subsequent discussions between Hunnicutt, Johnson, Denise, and Check, and on the afternoon of March 9,1984, the NRC Senior Resident inspector for Construction at Comanche Peak was instructed by Hunnicutt and Johnson, who had been instructed by Denise, to request that Comanche Peak SES management turn over to the NRC the documents taken f rom e,mmMUM '"~* NY-

; p. Wu

~~ ^ ~ ^ ~ ~ ~ ^

isa.a.asVnl 11et.11111 V '

6 1

desks, lockers, ~or other locations during the T-shirt incident. It was Hunnicutt's understanding that the reason for taking custody of these documents was that, while there was nothing to indicate that NRC involvement was warranted at that time, there existed the possibility that later events might involve the NRC. It was decided to acquire the materials against that possibility. Shortly after relaying the instructions to the Senior Resident Inspector for Construction, Hunnicutt received a telephone call that the documents had been secured.

) On March 13, 1984, acting on instructions from Richard Denise, Hunnicutt completed an inventory of each of the eight packages of material that were seized. Hunnicutt identified nothing which would raise health and safety concerns with the NRC.

On about April 2,1984, Hunnicutt was requested by Denise to prepare a list of interview questions and interview some or all of the eight QC inspectors involved in the T-shirt ir.cident. The purpose of the interviews was to provide the NRC with a better understanding of.the events of March 8, 1984, and to hcip determine whether there should have been NRC involvement. On April 5,1984, Hunnicutt and the NRC Senior Resident Inspector for l Construction interviewed three QC inspectors selected at random. The answers to the questions were somewhat similar from all three inspectors interviewed.

No additional QC inspectors involved in the T-shirt incident were interviewed because the first three gave fairly consistent answers.

j A list of eight questions prepared by Hunnicutt as well as Summaries of i' Interview documenting the three interviews of QC inspectors conducted by Hunnicutt were reviewed (Attachment 11). The responses from the three QC inspectors were similar.

j - In testimony before the ASLB on October 1, 1984, in the matter of Comanche Peak SES (excerpts at Attachment 12) Doyle M. Hunnicutt testified concerning his recollections of the T-shirt incident. Concerning those matters of i interest to OIA, Hunnicutt's testimony agreed with the information in his i prepared testimony.

James E. Cummins, Senior Resident Inspector for Construction, Comanche Peak SES, when interviewed (Attachment 13) stated he recalled that at about

! 11:00 a.m., March 8, 1984, he was in the office of the Senior Resident 4

Inspector for Operations, Comanche Peak SES, when he answered an anonymous telephone call which asked him to go to the TUGC0 QC offices in the North I

Island area of Comanche Peak SES. The caller claimed that TUGC0 management had sequestered some QC inspectors in a room and were going through their-

desks. Cumins telephoned his supervisor, Doyle M. Hunnicutt, at Region IV,

, and relayed the information to him. Cummins was instructed by Hunnicutt to

not get involved in what appeared to be a TUGC0 labor-management issue.

Cumins later received a telephone call from Hunnicutt who stated he had talked to Region IV management and the original instructions to not get involved still applied. Later that morning, Cummins learned from a Region IV i reactor inspector who was at Comanche Peak that he had received a telephone i call and a visit from an anonymous QC inspector who reported TUGCO's detention i

of QC inspectors and search of their desks. Curr.nins later received another anonymous telephone call requesting NRC involvement in the ongoing incident.

fCIPW w -..

' RE MH V a.om.-

. . _ . . - - ._..._-r.~ _ _._..._.., ,, _ _ _ _ . . . _ _ _ _ _ _ , , _ . _ _ _ _ _ _ _ _ _ . . , _ _ . . . _ , _ _ _ . _ _ , _ _ _ . -

g r fy 11 ' Of ml U s.1.u m kv' unwu 7

In the afternoon of March 9,1984, Cumins received telephone instructions from Hunnicutt to obtain from the TUGC0 QC Supervisor at Comanche Peak SES all the documents which had been confiscated by TUGC0 on March 8,1984. Cummins complied with these. instructions and secured the documents in the NRC trailer at Comanche Peak SES.

Early in April 1984, Cummins and Hunnicutt interviewed three or four of the TUGC0 QC inspectors who had been detained on March 8, 1984. The QC inspectors told Cummins and Hunnicutt that they were not trying to deliver a message by wearing the T-shirts and that TUGC0 management had over reacted to the situa-tion.

In testimony before the ASLB on July 17, 1984, in the matter of Comanche Peak SES (excerpts at Attachment 14), James E. Cumins provided his recollections

.of the T-shirt incident _. Although in more detail, Cummins' testimony before the ASLB agreed with the information he provided 0IA.

Ben B. Hayes, Director, Office of Investigations (01), NRC, when interviewed (Attachment 15)_ stated he did not specifically recall receiving a telephone call from Billie Garde on the evening of March 8, 1984, to notify him of the detention and seizure of inspection records at Comanche Peak SES. However, Hayes had no reason to doubt that Garde, in fact, telephoned him. Hayes did recall that Richard K. Herr, Director, 01 Field Office, Region IV, had checked with Region IV and learned that the records seized by TUGC0 had already been confiscated by Region IV and.were under NRC control. Upon learning that Region IV had control of the records, OI's involvement in the incident ceased.

Hayes comented that had there been an allegation of harassment or intimidation of the QC inspectors, 01 would have investigated. However, no such allegation -was ever made.

Hayes commented that sometime in the Summer 1984, he participated in interviews of those QC inspectors still employed at Comanche Peak SES who had been involved in the March 8, 1984, incident. The purpose of the interviews was to learn from the QC inspectors the circumstances surrounding the incident. The QC inspectors stated the issue had been resolved and no one had been fired. None of the QC inspectors made any allegation of harassment or intimidation. Generally, the QC inspectors thought TUGC0 management overreacted to the situation. All the inspectors interviewed stated they did not change any of their inspection procedures and still wrote non conformance reports whenever they observed deficiencies.

Region IV and 01 allegedly failed to act when notified that in September 1983, TUGC0 management pressured a contract inspector to reword his inspection report concerning the adequacy of the paint coatings program at Comanche Peak SES.

Donald D. Criskill, Investigator, 01 Field Office, Region IV, when interviewed (Attachment 16), stated that on September 12, 1983, during an interview of a witness regarding an ongoing 01 investigation, he received a copy of a

" Departmental Correspondence" memorandum prepared by Joseph J. Lipinsky, the OB Cannon and Sons Company (OB Cannon) Quality Assurance / Quality Control Manager. In the memorandum Lipinsky documented his evaluation of the protective paint coatings program at Comanche Peak SES.

mrwM m'N"V U ; I iist ru. u u:. U n L I

M ' # " Y m r trID' Al 11 g i i w m. L OL L 1 ~ i 8

A review of the memorandum by Driskill disclosed that Lipinsky visited Comanche Peak SES between July 26-28, 1983, to evaluate the TUGC0 paint coatings program. The memorandum documented a variety of problems with the coatings program. Several weeks after receipt of the Lipinsky memorandura,-

Driskill prepared an 01 Report of Inquiry to transfer the technical information in the report to Region IV. The reason for the transfer was the memorandum contained information about a poor TUGC0 paint coatings program; however, it did not contain any information regarding licensee misconduct.

Driskill forwarded the draft Report of Inquiry to.his supervisor, Richard Herr, Director, 01 Field Office, Region IV. Herr suggested that Driskill talk to Lipinsky to confirm that Lipinsky wrote the memorandum and to determine if he had any information to give NRC. 0n October 14, 1983, Driskill telephonically interviewed Lipinsky. Lipinsky was surprised and concerned that Driskill had a copy of the memorandum and was reluctant to discuss the memorandum with Driskill. Lipinsky stated the memorandum was an internal document which was not to be released outside of OB Cannon. Lipinsky related the memcrandum was intended as a trip report to inform his management about what he found during his visit to Comanche Peak SES. Lipinksy further related that the purpose )f his July 26-28, 1983, visit to Comanche Peak SES was to evaluate the quality of the Comanche Peak SES protective paint coatings program in accordance with a Consulting Services Contract that OB Cannon had with TUGC0. Lipinsky further stated his memorandum contained his personal opinion, and OB Cannon Vice President, R.B. Roth, to whom the memorandum was addressed did not agree with Lipinsky on all points contained in the memorandum.

After his telephone interview with Lipinsky, Driskill prepared an 01 Report of Inquiry (Q4-83-026). A copy of the October 18, 1983, 01 Report of Inquiry, along with a copy of the Lipinsky memorandum was forwarded to Region IV for their review of the technical issues. There were no allegations of impropriety for 01 to investigate.

On November 10, 1983, Brooks Griffin, Investigator, 01 Field Office, Region IV, interviewed Lipinsky who was at Comanche Peak SES to discuss the contents of his memorandum with TUGCO. Durirg the interview, Griffin let Lipinsky read a copy of Driskill's 0! Report of Inquiry, Q4-83-026. Lipinsky

~

had no problem with the report and stated that Driskill had fairly and honestly characterized the October 14, 1983, telephone conversation. Lipinsky made no allegations of harassment or intimidation to Griffin.

01 January 16, 1984, while he was in the office of David N. Chapman, QA Manager, TUGCO, Driskill obtained a copy of the transcript of the November 13-11, 1983, meeting between Lipinsky and TUGCO. Driskill reviewed the transcript and provided a copy to Region IV management as an attachment to a February 7, 1984, 01 Report of Inquiry Supplemental. Driskill did not identify any indications of harassment and intimidation during his review of the transcript.

Driskill commented that prior to September 1N3e OI had conducted several investigationsatComanchePeakSESbasedonallegationsfromQCinspectorsin the paint coatings department. Additionally, Region IV had been involved in n- DMt 7 mnv U ,

wm & U m, j ~

~~ ~~~ ~ ~ ~ ~ ~^

prrim u irn imiu.

vs IlulML WL unL r 9

reviewing and inspecting the paint coatings program at Comanche Peak. 01's investigations concerned intimidation of QC personnel in the paint coatings group; falsification of paint coatings QC records; and discrimination against a paint coatings QC inspector. Additionally, 01 conducted an inquiry into an

. allegation concerning the use of improper coating procedures. Among other l things, between September and November 1983, Region IV had an NRC inspector from Region III, who was an expert in the paint coatings area, inspect the paint coatings program at Comanche Peak SES. Also, in January 1984, Region IV 4

contracted with Brookhaven National Laboratory, to review the paint coatings i program.

i 01 Report of . Inquiry Q4-83-026, dated October 18, 1983, prepared by Donald D.

Driskill (Attachment 17) was reviewed. The information contained in the Report of Inquiry agreed with the information provided by Driskill during the

-01A interview. The inquiry report documented Driskill's receipt of the

" Departmental Correspondence" memorandum and his interview of Lipinsky. As an

, exhibit to the Report of Inquiry was a copy of the " Departmental Correspon-t dence." The Report of Inquiry does not contain any allegation of licensee misconduct.

J GI Report of Inquiry Supplemental Q4-83-026, dated February 7,1984, prepared by Donald D. Driskill (Attachment 18) was reviewed. The Supplemental Report of Inquiry had as an exhibit a copy of the transcript of the November 10-11, 1983, meeting between TUGC0 and 0.B. Cannon personnel. The transcript did not contain any indication of harassment or intimidation of Lipinsky by TUGC0

personnel..

1 Brooks Griffin, Investigator, 01 Field Office, Region IV, when interviewed (Attachment 19), stated that on November 10, 1983, while at Comanche Peak SES he interviewed Lipinsky. During the interview, Griffin showed Lipinsky the 01

. Report of Inquiry, QA-83-026, prepared by Driskill to document the October 14, 1983, telephone conversation between Driskill and Lipinsky. Lipinsky read the report and stated it accurately documented what he told Driskill during the

telephone interview.

During the interview, Lipinsky told Griffin that he had been asked to come to Comanche Peak SES to discuss a paint coatings contract. When he arrived at ,

t the site he was called into a room where Donald Tolson, the Comanche Peak QA Manager, read the internal memorandum Lipinsky had written to his supervisor concerning his inspection of the Comanche Peak SES paint coatings program.

Tolson then discussed why Lipinsky was wrong. Because Lipinsky was not prepared for the interview, the only reply he had for Tolson was that if what Tolson was saying by way of explanation was true then there was no problem.

I Additionally, because Lipinsky had not talked to many paint coatings QC f inspectors nor had he been allowed to review TUGC0's records to any extent, he i did not have sufficient background to refute Tolson. Lipinsky's memo to his i supervisor was essentially based on the interview of one TUGC0 QA inspector

who told Lipinsky what he thought the problem areas were. Li;'insky did not
intend for his memorandum to become public. He had put his findings in l writing with the thought that OB Cannon could obtain a paint coatings contract at Comanche Peak SES. Lipinsky was concerned that his memo becoming public l

knowledge could adversely affect his future in the nuclear industry because he would be associated with a leak of internal information.

ll CP'* W ns W,' i n n 1

'Ui i IUIHL Uw. un L r

.- _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ , _ _ _ . _ . _ - . _ . . _ . . _ - . _ _ _ . , _ _ _ _ _ _ _ . - . ~

e am an i or nm u J rw s m. unu U l -

10 During the interview, Lipinsky never indicated nor alleged to Griffin that he had been harassed or intimidated. L1pinsky stated he was under pressure because he was unprepared to respond to questions being asked during his meeting with TUGC0.

Joseph Gallo, an attorney with the law firm of Isham, Lincoln, and Beal, and the legal representative of Joseph J. Lipinsky, was contacted in an effort to interview Lipinsky (Attachment'20). Gallo stated that Lipinsky was in the process of testifying before the ASLB concerning his inspection of the Coraanche Peak SES paint coatings program and the memorandum he subsequently prepared to document his findings. Lipinsky had been directed by the ASLB not to discuss his testimony with any third party. Because the proposed 0IA interview of Lipinsky would be directly related to the matters testified to by Lipinsky before the ASLB, it would not be possible for Lipinsky to be inter-viewed.

0IA reviewed the testimony of Joseph J. Lipinsky given before the ASLB between November 19-21, 1984, regarding Comanche Peak SES (Attachment 21). Lipinsky related during his testimony that he did not believe he was harassed, intimi-dated, or unduly pressured by OB Cannon or TUGC0 to change his August 8,1983,

" Departmental Correspondence" memorandum regarding his evaluation of the Comanche Peak paint coatings program. Lipinsky s testimony provided no indication that he ever reported to the NRC that he was being harassed or intimidated as a result of the findings documented in the memorandum.

In prepared testimony for the ASLB (Attachment 22), Joseph J. Lipinsky detailed his inspection of the Comanche Peak SES paint coatings program, the preparation of a draft report for 08 Cannon management documenting his evaluation of the paint coatings program, and subsequent discussions of his evaluation with OB Cannon and TUGC0 management, as well as, the NRC Office of Investigations. Lipir. sky testified that his supervisor slightly modified his memorandum concerning the ability of OB Cannon to accomplish any rework of the Comenche Peak SES paint coatings. Although asked by his supervisor on several occasions to sign the revised report, Lipinsky refused. Lipinsky stated that each time he refused, the matter was dropped. Lipinsky stated that his employment status at 08 Cannon was not threatened in any way by the fact he had written the memorandum, that it had leaked to the public, or that he refused to sign the revised report. Lipinsky stated he was not " railroaded" into changing his opinion. Lipinsky did not indicate that he alleged to 01 that he was being harassed or intimidated.

In an affidavit dated September 28, 1984, before the ASLB concerning Comanche Peak SES (Attachment 23), Joseph J. Lipinsky recounted the circumstances surrounding his preparation of the " Departmental Correspondence" memorandum concerning his evaluation of the Comanche Peak SES paint coatings program.

The affidavit discussed in some detail each of the areas mentioned in the memorandum and the fact that the observations and conclusions in the memorandum no longer represented his views or the views of OB Cannon. In the affidavit,- Lipinsky asserted he had not been induced in any way to retract his memorandum, and he had not been subjected to any harassment, intimidation or threats by his employer, the applicants, or anyone associated with the proceeding.

I 8" OE V [M y

, _L4 u n. .w. 6....-

L

_ _ __ ._ ___ _ __ __ _ _ _ _ _ . _ _ _ _. ____m. - _. ._ _ _ _ _ _

n TID!A liftr M1 V V I IUlfl . Udb UU I.s j 11 I

Region IV and 01 allegedly failed to act when notified that TUGC0 had falsi-fied inspection re3 orts concerning improper installation of lincr plates for t the spent fuel tan (, refueling cavities, and two transfer canals.

L H. Brooks Griffin, Investigator, 0! Field Office, 01, Region IV, when i interviewed (Attachment 24), stated that on April 6,1984, he interviewed a confidential GAP witness concerning alleged falsification by TUGC0 of liner plate inspection reports at Comanche Peak SES. The GAP witness reported that she had been instructed to sign off on inspection travelers for quality control (QC) inspections on liner plates she had not perforned. This ,

l interview was the first involvement by 01 in the alleged TUGC0 falsification '

, of liner plate inspection reports. On April 6,1984, driffin interviewed a second GAP witness who provided corroborating testimony concerning the allegations made during the first interview. During both interviews,

Thomas Ippolito, former Project Manager, Comanche Peak SES Technical Review

, Team (TRT), was present and received copies of both statements.

As a result of the information provided by both GAP witnesses, 01 and the ,

Comanche Peak SES TRT worked together for about a month to review liner plate '

allegations / problems. After the review, 01 assumed investigative jurisdiction on matters involving possible licensee wrongdoing, and the TRT took responsibility for reviewing the technical issues concerning whetSer the liner i plates were properly manufactured and installed.

i During the first of September 1984, Griffin and Tom Currie, EG&G, Idaho, reviewed TUGC0 inspection travelers, and on September 10, 1984, Griffin began active investigation of the allegations of wrongdoing contained in'the state-ments of the GAP witnesses. 01 Report of Investigation (4-84-039), which was in draft form at the time of the OIA interview, documented this investigation which consisted of interviews of 16 licensee personnel, including everyone mentioned by the first GAP witness. Many of these interviews were conducted .

~ between September and October 1984. Griffin noted'that the first GAP witness '

alleged she was told to sign inspection trevelers for inspections of liner plates she did not conduct. However, the practice of " late entry sign-offs,"

where an inspector signs inspection documents for inspections the inspector- i did not perform as long as there are inspection documents to support the

traveler, is common. Apparently, as far as the NRC technical staff and the nuclear industry are concerned, there is no problem with this practice.

! Because the first GAP witness had reservations about what she was asked to do l by TUGC0 management, she noted on the travelers the fact the entries she made were late. She also incorporated the old construction documents which bore previous QC inspector signatures for inspection steps into the traveler package by renumbering the documents. During any future review, these steps would identify that the entry was a late entry sign-off and the documents used to support the entry would be available.

Althcugh the first GAP witness was concerned with signing for inspections she did not personally conduct, the 01 investigation did not focus on that allegation because the practice of late entry sign-offs was not considered improper. However, through a series of interviews, Griffin was able to determine exactly what instructions the first GAP witness received from TUGC0 management. It was learned that the instructions to the first witness were to sign-off on the travelers whether or not construction documents (NDE chits) existed to support that inspections were actually conducted. The OI e

rTmu mr(W1y L: l 'JiiiL J :.3 L U d h T

.,.,.s,- . _ _ - _--.._-_r-., , - , - . , _ . - , - _ - - . - - - - _ - . _ - - - , - - . w_ , .. -,v-'

GCrlN M hN!< - .

ui ivinL uvo b u."

12 investigation determined that management instructions to sign-off on travelers for which no back-up documents were available were improper.

Griffin further related that on August 24, 1983, he interviewed Arvil Dillingham, Jr. , a former B&R general foreman at Comanche Peak SES.

This interview was conducted during the course of an 01 investigation (4-84-006) into allegations of intimidation of employees at Comanche Peak SES.

During the interviewt Dillingham provided information concerning his belief that inspection travelers concerning liner clates had been falsified. The purpose of the 01 interview of Dillingham was to investigate alleged intimidation at Comanche Peak SES. OI believed that Dillingham's allegations concerning the liner plates had previously been addressed; therefore, 0! did not identify his belief that the travelers had been falsified as being an 01 matter. 0I referred the Dillingham statement, which contained numerous technical allegations many of which had already been addressed, to Region IV.

Region IV was to refer back to 01 any allegations of wrongdoing that it developed. 01 never received any feedback from Region IV. However, as a result of the information provided during the April 6,1984, interviews of GAP witnesses, the allegations of liner plate inspection traveler falsification, originally mentioned by Dillingham, were thoroughly investigated by 01.

OIA reviewed the transcript of an interview of the first GAP witness conducted at 2:37 p.m. , April 6,1984, by H. Brooks Griffin, 01, and Thomas Ippolito, Comanche Peak SES (TRT) (Attachment 25). Discussed during the interview were numerous technical allegations which were raised by the GAP witness. These allegations were subsequently segregated and issued NRC allegation tracking numbers. Also discussed in detail, on page 60, was an allegation that TUGC0 management wanted the GAP witness to sign between 112-142 travellers for the stainless steel liner plates for the spent fuel pool. The GAP witness was concerned that she was signing for inspections that she did not personally conduct.

0IA reviewed the transcript of an interview of a second GAP witness conducted at 6:55 p.m. , April 6,1984, by H. Brooks Griffin, 01, and ihomas Ippolito, Comanche Peak TRT (Attachment 26). Discussed during the interview were numerous technical allegations raised by the GAP witness. Also briefly commented on by the second GAP witness, on page 88 of the transcript, was her knowledge of falsification of documentation. The second GAP witness cor-roborated the testimony of the first GAP witness.

OIA reviewed the transcript of an interview of Arvill Dillingham, Jr., con-ducted on August 24, 1983, by Richard K. Herr and H. Brooks Griffin, 01 Field Office, Region V (excerpts at Attachment 27). Among the allegations documented in the transcript, Dillingham discussed his concern that travelers for stainless steel fuel liner plates were being falsely prepared.

Thomas F. Westerman, Enforcement Officer, Region IV, when interviewed (Attach-ment 28), stated that upon completion of the OI investigation into the concerns raised by Arvill Dillingham, Jr., in his August 24, 1983, interview, 0I provided Westerman with a copy of the transcript. In addition to the August 24, 1983, transcript, Westerman had on file two other affidavits by Dillingham dated March 31, 1983, and June 27, 1983, which documented his concerns with the construction at Comanche Peak.

n v!E! f iM O W V_

V ,1b!HL M wa e

_. J

.g y .

p = ng y T1 .1U111. . 9 Ull F 13 Although the issues raised by Dillingham in the first two affidavits had previously been investigated by NRC, in April 1984 Westerman provided the  ;

three affidavits to a Region IV inspector for review and research. However, also in April 1984, the NRC Comanche Peak TRT arrived at Region IV to review

and ottempt to resolve allegations of construction deficiencies at Comanche Peak SES. Consequently, the TRT assumed responsibility for all allegations at <

Comanche Peak SES. The Dillingham affidavits, as well as any other

~

allegations concerning the liner plates at Comanche Peak, were turned over to the TRT for reJolution.

  • In a memorandum dated April 4,1984, (Attachment 29) H. Brooks Griffin, 0I i

Field Office, Region IV, provided Thomas F. Wesi.erman, Inspection and Enforcement Officer, Region IV, with a copy of the transcript of the 01 interview of Arvill Dillingham.

In a Technical Interview conducted on December 10, 1984, (excerpts at Attach-ment 30) between the NRC Comanche Peak TRT and intervenors, the issue of the stainless steel spent fuel pool liners was discussed. Both technical and falsification issues were discussed. Vincent S. Noonan, Project Director for the Comanche Peak TRT, stated he had issued a memorandum to the NRC staff directing them to formalize a position on whether the spent fuel pool liners were safety or non-safety related. Also during the interview, it was noted that the alleged falsification of the inspection travelers for the spent fuel pool liner

  • cas the subject of a separate investigation by 01.

2 In a memorandum dated December 7, 1984, (Attachment 31) from Vincent S.

Noonan, Project Director, Comanche Peak TRT, to various NRC Branch Chiefs, Noonan requested that the staff prepare a statement of the NRC staff's position on the need for the spent fuel pool liner to be designed and constructed as a Seismic Category I structure, and/or a safety-related,10 CFR 50, Appendix B structure. As enclosures to the memorandum were two NRC Inspection Reports, 50-445/77-13 and 50-445/79-15, which provided information on Region IV's past inspections of the spent fuel pool liner.

Inspection Report 77-13 documented Region IV's inspection of the welding of fillet joints for the attachment of leak chase channels and of tacks for the attachment of backing bars for the butt weld seams for stainless steel liners.

Inspection Report 79-15 documented a special investigation of allegations j received regarding improper and potentially very poor welding of inter-plate seams in the Unit 1 Refueling Pool, spent fuel pools, and transfer canal of the common facility Fuel Handling Building.

Conclusion hTnefactsdevelopedduringthisinvestigationindicatethatRegionIVwasnot i 2

sufficiently sensitive to reports concerning the detention by TUGC0 management

of Comanche Peak SES quality control inspectors and the subsequent search of their desks and files. 0IA believes that Region IV should have more promptly  ;

responded to the anonymous allegations by acting to gather firsthand Yi .

information concerning the ongoing incident. Region IV would have then been d ,

better able to decide whether the situation was a TUGC0 labor-management dispute or whether additional NRC involvement was required.

The OIA investigation did not develop any indication that the OB Cannon i

1nspector believed or reported that he was harassed, intimated, or unduly V

nr m.V ll M M il V un um va en8 4

. - . - - , - - - , , - . , . , _ ~ , _ - - . - , , - _ , , . _ _ , , - - . , . - -

.. . . . . - .. - . - . - .. . . ._ . - - . , . . . - . _. . _ ~ - . . .

i - . . . . .

i 14 i

~

pressured in connection with his " Departmental Correspondence" memorandum.

Consequently, we believe Region IV and 01 acted appropriately in this matter.

I OIA believes that Region IV and 01 responded appropriately to. reports received i

in April 1984, concerning the alleged falsification of spent fuel pool liner j

plates by TUGCO. As a result of these allegations, the 01 Field Office, Region IV, conducted an investigation into possible licensee tvrongdoing and j

the NRC Comanche Peak TRT-reviewed the technical concerns witn the spent fuel pool liner plates. GIA noted, however, that the 01 Field Office, Region IV

! 4 received information in August 1983, that inspection reports for the spent i fuel pool lir,er plates were being falsely prepared. Because this was not

! [t identified as an 01 matter at that time, investigation of this issue was inappropriately delayed until the allegations were again received in j l April 1984.

i I

1 i.

I i

_ o. . r.. e , r , - c -

Un i to. 6L L L m- '

_ _ . - . - _ _ . _ . - _ - . _ _ _ - - . _ _ . . . _ _ _ _ _ _ _ _ - _ . . . . . _ - . _ - - _ . - __ _ _ _ _ . , _ _ ~ . . . _ . - _ . .

r rw 0 tDr miV T ,1 J n . uva ma s ATTACHMENTS

1. Report of Interview - Billie P. Garde, dated November 7, ~1984.
2. Report of Interview - Paul S. Check, dated May 1,1985.
3. Notes by Paul S. Check re Comanche Peak.
4. Excerpts of Deposition of Billy R. Clements, dated July 10, 1984.
5. Excerpts of Testimony of Billy R. Clements, dated September 11, 1984.
6. Report of Interview - Richard P. Denise, dated May 3, 1985.
7. Notes by Richard P. Denise re Comanche Peak.
8. Memo,

Subject:

B&R QC Inspection Material Impounded by NRC at CPSES, dated April 20, 1984.

9. Report of Interview .- Doyle'M. Hunnicutt, dated May 9,1985.
10. Testimony of Doyle M. Hunnicutt, w/ attachments.
11. List of questions and Sumaries of Interview.
12. Excerpts of Testimony of Doyle M. Hunnicutt, dated October 1, 1984.
13. -Report of Interview - James E. Cumn, ins, dated May 6,1985.

l 14. Excerpts of Testimony of James E. Cummins, dated July 17, 1984.

15. Report of Interview - Ben B. Hayes, dated May 6, 1985.
16. Report of Interview - Donald D. Driskill, dated May 6, 1985.

i 01 Report of Inquiry, Q4-83 026, dated October 18, 1983.

^

17.

18. 01 Report of Inquiry Supplemental, Q4-83-026, dated February 7, 1984.
19. Report of Interview - Brooks Griffin, dated May 2,1985.
20. Report of Interview - Joseph Gallo, dated May 8, 1985.
21. Review of Testimony, dated May 29, 1985.
22. Testimony of Joseph J. Lipinsky.
23. Affidavit of Joseph J. Lipinsky, dated September 28, 1984.
24. Report of Interview - Brooks Griffin, dated May 2,1985.
25. Confidential Interview, dated 2:37 p.m. , April 6,1984.
26. Confidential Interview, dated 6:55 p.m., April 6.,1984.

t ,

v:;

J2 1 L .. . -

nrr'rrn; e c r-

. v . . . i . ;- o ~ ;. . . . ,

\

27. Interview of Arvill Dillingham Jr., dated August 24, 1983.
28. Report of Interview - Thomas F. Westerman, dated May 3,1985.
29. Memo,

Subject:

Release of Portions of Dillingham's Transcript.

30. Excerpts of Technical Interview, dated December 10, 1984.
31. Memo,

Subject:

Preparation of a Statement on the NRC Staff's Position on the Spent Fuel Liner, w/ attachments, dated December 7, 1984.

, e ** *

  • L _ _ _

REC 0LLECTION BY PAUL S. CHECK 0F SEQUENCE OF EVENTS REGARDING COMANCHE PEAK " TEE SHIRT" INCIDENT

1. Bill Clements called me on March 8 to inform NRC of apparently provocative behavior on part of several QC inspectors and to describe TUGCO's initial actions in response. (See attached note r' call.)
2. In discussion with Bill . Brown and Dick Denise, I observed that the Utility appeared to be handling the incident in a responsible manner and endorsed suggestion by Denise that we ask our residents to observe, but not interfere with, the developing situation. Denise was to handle.
3. Later (perhaps the next day), upon learning that the company had collected material from desks of QC inspectors and anticipating ASLB and other interest in it, we decided to impound it. Denise handled.

Attachment l'

l t

I l

t

- _ _ _ =_, , --_

jg ( \ L o o [I'/l v f ")"(,

./

[% P 01aC  ?#~ 7%

3R fL& id&p tr & n f tv6f speu. # A< sr uphd 4;pqa t n 16 mtf f efu&u'd 79e 4pa% a tl

%{ypul kufL 7 .

% l&~ 7A a .1p . k i n M t f . Iva f W /u j e k o p klak . W &sp k 40 L ud fd n<aw $ pik e lage ,

sppuff % a4 +f 2LabJ<

am<

k W (13. f mM in i sf jae& W n sa yyiM 2%

M xan k on&F% L3 edL) .

7 1a 4 pub at uaf G-dad d spt 1 pal o4 " .

g Tu&co .4 en u w J V spq sf 6

.u/ Am tcp tul Am

.m .

Q w ju,tg Apda. ~@lG tanul by bay d-per M A .m . %puq n$t L wt(de Amyu) M i wq&9 nyt &p .

Iw 'g A JapF &yt .

sa r-a; r luay Wilk(ud/

s. ShD E/d Tq/tt/

w& wpdP G P 1

. A 6re.Es%1 n.#

%< bul & I' Re d M p M r^ h @d "g 3

,