ML20115B368

From kanterella
Revision as of 15:47, 13 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-40,changing TS Sections 2.10.4(5)(a)(i) & 3.2,including Table 3-5,Item 10b.3 Re DNBR Margin During Power Operation Above 15% of Rated Power & Equipment & Sampling Tests,Respectively
ML20115B368
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/09/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20115B375 List:
References
LIC-92-210A, NUDOCS 9210160021
Download: ML20115B368 (2)


Text

'li

. - . . - - - - . _ ~ . A ~ ~X Omaha Public Power District 444 South 16th Street Mall Omaha. Nebraska 68102-2247 October 9, 1992 402/6 5 2000 LIC-92-210A Commission U. S. Nuclear ATIN: Document Regulatorbesk Control Mail Station Pl-137 Washington, DC 20555

References:

1. Docket No. 50-285
2. Letter from OPPD dated July 9,199(1 (LIC-91-185R)W. G. Gates) to NRC (Document Contro
3. Letter from NRC (T R. Quay) to OPPD (W. G. Gates) dated August 14, 1991 Gentlemen:

SUBJEC'- Application for Amendment of Operating License Enclosed please find Omaha Public Power District's (0 PPD) " Application for Amendment of Operating License," which seeks to amend the Fort Calhoun Station Unit No.1 Technical Specifications Sections 2.10.4(5)(a)(i) and 3.2 (including Table 3-5, item 10b.3). These changes are consistent with documentation previously submitted to the NRC in Reference 2. Reference 3 provided the NRC response which found the submittal to be acceptable.

Attachment A contains a markup reflecting the requested changes of the Technical Specifications. Attachment B provides a Discussion, Justification and No Significant Hazards Consideration Analysis for the chances requested. OPPD respectfully requests 60 days from the date of issuance to implement these changes.

If you have additional questions, or require further information, please do not hesitate to contact me or members of my staff.

Sincerely, g- ] 'N' W. G. Gates Division Manager

, Nuclear Operations WGG/sel c: LeBoeuf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager R. P. Mullikin, NRC Senior Resident Inspector

11. Borchert, Director - Division of Radiological Health State of Nebraska 9210160021 921009 d PDR ADOCK 05000295 i' 45 5124 P _

PDR

) (fb] I fhploymengh Equa opportunity j

9' f jt UNITED STATES OF-AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of  ;

Omaha Public Power District 1 Docket No. 50 285 (Fort Calhoun Station h Unit No. 1) ll AFFIDAVIT W. G. Gates, being duly sworn, hereby desoses and says that he is the Division Manager

- Nuclear Operations of the Omaha Public Power District; that- as such he. is duly authorized to sign and file with the Nuclear Regulatory Commission the attached ,

information concerning the Application for Amendment dated October 9,1992 concerning

that changes to Technical he is familiar with the content Specifications thereof;Sections and that 2.10.4 and 3.2 the matters set(including forth thereTable 3-5)in are true and correct to the best of his knowledge, information, and belief.

AV 5 5Y W. G. Gates Division Manager Nuclear Operations STATE OF NEBRASKA ss.

COUNTY OF DOUGLAS j

Subscribed and sworn to before me, a Notary Public in and for the State of Nebraska on this P day of October, 1992.

. I AM s. > OxwoLmt

'~ Notary Public 4 I GMW Rwanst enti d - u[O hI A

_