ML20128K100

From kanterella
Revision as of 01:34, 8 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected TS Page 3/4 3-49a to Amend 189 to License NPF-1, Reflecting Correct Spelling of Kziu in Items 4.c & 6.c
ML20128K100
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/11/1993
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20128K091 List:
References
NUDOCS 9302180069
Download: ML20128K100 (1)


Text

O l

INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE

  • Snqkg Thermal
b. Train B Elevation 61 ft KZlu 6-#6, Zone 3 5 l
c. Train A Elevation 65 ft KZIU 6-#6, Zone 4 2
5. Station Battery Rooms
a. Train A Elevation 65 ft KZIU 6-#6, Zone 2 1
b. Train B Elevation 65 ft KZIU 6-#6, Zono 1 1
6. Containment
a. KZlU 6-#5, Zone 2 1
b. KZIU 6-#5, Zone 3 1
c. KZiU 6-#19, Zone 3 2
7. Auxiliary Feedwater Pump Rooms
a. KZIU 6-#16, Zone 1 2
b. KZiU 6-#16, Zone 2 1
c. KZlU 6-#16, Zone 3 1
8. Residual Heat Removal and Safety injection Pump Rooms
a. KZiU 6-#13, Zone 1 2
b. KZlU 6-#13, Zone 2 4
9. Service Water Pump Area
a. KZIU 6-#8, Zone 1 1
b. KZiU 6-#8, Zone 2 1
c. KZlu 6-#8, Zone 3 1 TROJAN-UNIT 1 3/4 3-49a Amendment No M , 60, 69,  !

92, 189 9302180069 930211

" ^ " " ESE j