Amend 132 to License NPF-1,revising Tech Spec Section 3/4.8.2, Onsite Power Distribution Sys
ML20236H553
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/30/1987
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20236H535 List:
References
NUDOCS 8708050244
Download: ML20236H553 (7)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ -

' ,. J p n ato v

' +

  1. ^

'o UNITED STATES 8" n NUCLEAR REGULATORY COMMISSION

{ '

. . ,E WASHINGTON, D. C. 20555 PORTLAND GENERAL ELECTRIC COMPANY THE CITY OF EUGENE, OREGON PACIFIC POWER AND LIGHT COMPANY DOCKET NO. 50-344 TROJAN NUCLEAR PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 132 License No. NPF-1

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Portland General Electric Company, et al., (the licensee) dated September 10, 1985, as supplemented AirTT3,1987,complieswiththestandardsandrequirementsofthe Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

870B050244 a70730 PDR ADOCK 05000344 P PDR

,,. .1 i

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-1 is hereby amended-to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and.B. as revised through Amendment No.132, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifica-tions, except where otherwise stated in' specific license conditions.

3. This license amendment is effective as of the date of its issuance. i FOR THE NUCLEAR REGULATORY COMMISSION ,

1

, ic/ d-George Knighton irector f Projee Directorat V Division of Reac' tor Projects - III l

IV, V and Special Projects 1

Attachment:

Changes to the Technical Specifications Date of Issuance: July 30, 1987 i

t

~

l e l

4

a

, i

. - July 30 1987 0

i ATTACHMENT TO LICENSE AMENDMENT N0. 132 TO FACILITY OPERATING LICENSE NO. NPF-1 DOCKET N0. 50-344  !

l I

Revise Appendix A as follows:  ;

Remove Paces Insert Pages TS 3/4 8-6 TS 3/4 8-6 3/4 8-7 3/4 8-7 3/4 8-10 3/4 8-10 8 3/4 8-1 B 3/4 8-1 1

J l

1 1

L

a

< 1

. q ELECTRICAL POWER SYSTEMS

-3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. DISTRIBUTION - OPERATINE LIMITING CONDITION FOR OPERATION 3.8.2.1 The following A.C. electrical busses shall be 4PERABLE and .)

energized with tie breakers open between redundant busses:  !

4160 volt Emergency Bus # A1 4160 volt Emergency Bus # A2

)

480 volt Emergency Bus # B01/803 l

480 volt Emergency. Bus # B02/B04

]

120 volt A.C. Preferred Instrument Bus # Y11 (Vital Bus) 120 volt A.C. Preferred Instrument Bus # Y13 (Vital Bus) 120 volt A.C. Preferred Instrument Bus # Y22,(Vital Bus) 120 volt A.C. Preferred Instrument Bus # Y24 (Vital Bus) 2 APPLICABILITY: MODES 1, 2, 3 and 4. -

ACTION:

With less than the above complement of A.C. busses OPERABLE, restore the inoperable bus to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. 1 l

SURVEILLANCE REQUIREMENTS , 4.8.2.1 The specified A.C. busses shall be determined OPERABLE and q energized with tie breakers open between redundant busses at least l once per 7 days by verifying correct breaker alignment and indicated power availability.

l l.TRO.1AN-UNIT 1 3/4 8-6 . Amendment No'.132-7/30/87 l

ELECTRICAL POWER SYSTEMS A.C. DISTRIBUTION - SHUTOOWN LIMITING CONDITION FOR OPERATION 3.8.2.2 As a minimum, the following A.C. electrical busses shall be OPERABLE and energized:

l l 1 - 4160 volt Emergency Bus 1 - 480 volt Emergency Bus 2 - 120 volt A.C. Preferred Instrument Busses (Vital Busses) l APPLICABILITY: MODES 5 and 6.

ACTION:

With any of the above required electrical busses not energized in the required manner, immediately suspend all operations involving CORE '

ALTERATIONS, positive reactivity changes, or movement of irradiated f uel.

Initia.te corrective action to energize the required electrical busses in the specified manner. Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, depressurize and vent the RCS through a >3.40 square-inch vent, SURVEILLANCE REQUIREMENTS 4.8.2.2 The specified A.C. busses shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability. l IL TROJAN-UNIT 1 3/4 8-7 Amendment No. 132 7/30/87

,s

. . a l

9 ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.4 As a minimum, the following D.C. electrical equipment and bus shall be energized and OPERABLE:

1 - 125-volt D.C. bus, and 1 - 125 volt battery bank and at least one charger associated with the above D.C. bus.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above complement of D.C. equipment and bus OPERABLE, 'l immediately suspend all operations involving CORE ALTERATIONS, positive ,

reactivity changes, or movement of irradiated fuel. Initiate corrective J action to energize the required electrical bus, battery bank, and )

associated charger in the specified manner. Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, depressurize j and vent the RCS through a 13.40 square-inch vent.

SURVEILLANCE RE0VIREMENTS 4 . 8. 2 . 4 .1 The above required 125-volt D.C. bus shall be determined  ;

OPERABLE and energized at least once per 7 days by verifying indicated '

power availability.

4.8.2.4.2 The above required 125-volt battery bank and charger shall be demonstrated OPERABLE per Surveillance Requirement 4.8.2.3.2.

l TROJAN-UNIT 1 3/4 8-10 Amendment No. 132 7/30/87

.. g

,, . o I-l l

3/4.8 ELECTRICAL POWER SYSTEMS BASES l The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of l accident conditions within the facility. The minimum specified indepen-

! dent and redundant A.C. and 0.C. power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Appendix "A" to 10 CFR 50.

The ACTION requirements specified for the levels of degradation of' the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least one of each of the onsite A.C. and D.C. power sources and associated distribution systems OPF.RABLE during accident conditions coincident with an assumed loss of offsite power and sing 1c failure of the other onsite A.C. source.

l The OPERABILITY of the minimum specified A.C. and D.C. power sources an'd associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the facility status.

The basis for depressurizing and venting the RCS through a

>3.40 square-inch vent when less than the required busses are OPERABLE is provided on Page B 3/4 4-9.

1 TROJAN-UNIT 1 B 3/4 8-1 Amendment No.132 7/30/87