ML20236C465

From kanterella
Jump to navigation Jump to search
Corrected Tech Spec Page 3/4 3-47 to Amend 93 to License NPF-1
ML20236C465
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/15/1989
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20236C459 List:
References
NUDOCS 8903220167
Download: ML20236C465 (1)


Text

,

1

+

e INSTRUMENTATION 1

CHLORINE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.3.3.6 Two independent chlorine detection systems, with their alarm / trip l

setpoints adjusted to actuate at a chlorine concentration of a 5 ppe, shall be OPERABLE with the chlorine detectors located at the control room l

l air intake duct.

APPLICABILITY:

M DES 1, 2, 3 and 4. ~

ACTION:

~,

l a.

With one chlorine detection system inoperable, restore the inoperable detection system to OPERABLE status within 7 days or within the next 6.cours initiate and maintain operation of the control room amer;ency ventilation system in the rectreula-(

i tten mode of operation.

B.

With both chlorine detection systems inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inittate and maintain operatton of the conkaol room emergency ventilation system in the rectreulation mode of operation.

The provisions of Sp, edification 3.0.4 are not applicable.

)

c.

)

$ SURVEILLANCE REQUIREMENTS 4.3.3.6 Each chlorine detection system shall be verified energized at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and demonstrated OPERABLE by performance of a CHANNEL CALIBRATION at least once per 18 months.

l

\\

TROJAN-UNIT 1 3/4 3-47 Amendment No. 93 8903220167 890315 ADOCK0500{g4 PDR P