ML20127P574

From kanterella
Jump to navigation Jump to search
Amend 189 to License NPF-1,revising Plant TS 3/4.3.3.7, Fire Protection Instrumentation
ML20127P574
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/26/1993
From: Quay T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20127P573 List:
References
NUDOCS 9302010335
Download: ML20127P574 (7)


Text

po $8 %g

. p c 3* .I n UtelTED STATES i T i NUCLEAR REGULATORY COMMISSION

  1. dg .

f f WA5mNoToN. D C. MM POR1 LAND GENERAL ELECTRIC COMPAtLY THE CITY Of EVGENE. OREGQB PAtlfl0 EQWER AND LIGHT COMPANY QQCKET NO. 50-344 IROJAN NUCLEAR PLANT 6t1DiDMENT T0_[ACILITY OPEILATING LICENSI Amendment No. 189 License No. NPf-l

1. The Nuclear Regulatory Comission (the Commission) has found that:

A. The application for amendment by Portland General Electric Company, et al. (PGE or licensee) dated November 5,1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be ennducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of facility Operating License No. NPF-1 is hereby amended to read as follows:

9302010335 930126 i PDR ADOCK 05000344 P pon

4 (2) lechnical Sngciflgdigni.jtad Environmenta]_Protettlon P1an The Technical Specifications contained in Appendix A, as revised through Amendment No.189, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. The licensee shall operate the f acility in accordance with the Technical Specifications and the Environmental Protection Pl an.

3. This license amendment is effective as of the date of issuance. This amendment shall be fully implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION 2/e4+ f. .S.y Theodore R. Quay, Director Project Directorate V Division of Reactor Projects Ill/lV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: January 26, 1993

.A1TACHMENT 10 LICENSE AMEhDMENT

! Ni[!Di[N1 NO. 1891QEll1TY OPEfalifiLLLCillSL!iUlPl-l DOCKET NO. 50-344 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by amendment number and contain rnarginal lines indicating the areas of change.

ELM _011 ildfRI 3/4 3-48 3/4 3-48 3/4 3-49 3/4 3-49 3/4 3-49a 3/4 4-49a --

3/4 3-49b 3/4 4-49b mumm- ---memmens em-mmmm , g

. INSTRUMENTAT104 FIRE PROTECTION INSTRUMENTAT!0fl LIMITING CONDE 10N FOR OPERATION 3.3.3.7 As a minimum, the fire protection instrumentation for each fire detection zone shown in Table 3.3-10 shall be OPERABLE.

APPLICABILITY: Whenever equipment in that fire detection zone is required to be OPERABLE.

ACTI0fi: With one or more of the fire detection instrument (s) shown in lable 3.3-10 inoperable:

a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the zone (s) with the inoperable instrument (s) at least once per hour unless the instrument (s) is located inside the Containment, then inspect the Containment at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and
b. Restore the inoperable instrument (s) to OPERABLE status within 14 days or, in lieu of any other report required by Specification 6.6.1 or 10 CFR 50.72, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the inoperability and the plans and sentdule for restoring the instrument (s) to OPERABLE statur,
c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

},1)RyfillANCE R.E0VIRf4ENTS 4.3.3.7.1 Each of the above required smoke detection instruments shall be l demonstrated OPERABLE at least once per 6 months by performance of a CHAtiNEL FUNCTIONAL TEST. Smoke detectors which are not accessible during l plant operation shall be demonstrated OPERABLE by the performance of a CHANNEL FUNCTIONAL TEST during each COLO SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous.6 months.

4.3.3.7.2 One or more of the thermal detection instruments from each fire ,

detector zone shall be tested at least once per 6 months by performance of. ,

a CHANNEL FUNCTIONAL TEST. Different detectors shall be selected for each subsequent test such that within five years, each detector shall have been ttsted.

4.3.3.7.3 The NFPA Code 720 Class B supervised circuits supervision l associated with the detector alarms of-each of the above required fire detection instruments shall be demonstrated OPERABLE at least once per

~

6 months.

TROJAN-UNIT 1 3/4 3-48 Amendment No. 48, Sp, 9A 189 u , .,..w,.,,.,.,,. .m-,., - - . , r ,. . , , , . ,,n , _ . , - . . , , . . . 4..-,.~..-- n.--

l l

. Table 3.3-10 FIRE DETECTION INSTRUMENTS JNSTRUMENT LOCATION MINitiUM INSTRUMENTS OPERABLE

  • Smoke Thermal
1. Control Room
a. KZlV f-#1, Zone 1 4 i
b. KZlV s-#1, Zone 2 4 i
c. KZll 6-#1, Zone 3 1
d. V~4V 6-#1, Zone 4 1
2. .able Spreading Room

.-- KZIU 6-#2, Zone 1 2

b. KZlV 6-t2, Zone 2 2  :
c. KZlV G-#2,-Zone 3 2 l
d. KZIU 6-#2, Zone 4 2 l l
3. Electrical Penetration Area -

\

a. KZlV 6-#5, Zone 1 2
b. KZIU 6-#5, Zone 4 1
4. Switchgear Room
a. Train A Elevation 69 ft (1) KZlV 6-#7, Zone 1 5 (2) KZIU 6-#7, Zone 2 5 l

)

TROJAN-VNIT 1 3/4 3-49 Amendment No. M , M , 4 189 er . .e, . . -<~~,..we -- . - , , , - - - . -.....--.u-~,.,_..-.-..,,_,.,,-.s-r -y., . -, y---,,me, .-4--w. ,er e-iim. .-y-. *s<v -a--<cr,-r-=

T/

l I 11[STRUMENT LOCAT10f4 tiltilliVli_IliSJ RUM E NT S 0 P E R A B L E

  • M2It lbfall
b. Train B Elevation 61 f t KZlV 6-f6, Zone 3 5
c. Train A Elevation 65 ft KZVI 6-#6, Zone 4 2
5. Station Battery Rooms
a. Train A Elevation 65 ft _

KZlU 6-#6, Zone 2 1

b. Train B Elevation 65 ft KZlV 6-#6, Zone 1 1
6. Containment
a. KZlV 6-#5, Zone 2 1
b. KZ!U 6-#5, Zone 3 1
c. KZUI 6-#19, Zone 3 2
7. Auxiliary Feedwater Pump Rooms
a. KZlU 6-#16, Zone 1 2
b. KZlV 6-#16, Zone 2 1
c. KZlU 6-#16, Zone 3 1

~

8. Residual Heat Removal and Safety Injection Pump Rooms
a. KZlV 6-#13, Zone 1 2
b. KZlU 6-#13, Zone 2 4
9. Service Water Pump Area
a. KZlV 6-#8, Zone 1 1
b. KZlV 6-#8, Zone 2 1
c. KZlV 6-88, Zone 3 1 TROJAN-UNIT 1 3/4 3-49a Amendment No. 48, 50, 69, 92, 189

_ ~

INSTRUMENT LOCATION HINIMUM INSTRUMEilTS OPERABLE

  • 2mde Thermal l

i

10. Service Water Dooster Pump Area
a. KZlu 6-#9, Zone 1 1
b. KZIU 6-#9, Zone 4 4
11. Centrifugal Charging Pump Rooms
a. KZIU 6-#14, Zone 2 1
b. KZlu 6-#14, Zone 3 1  ;
12. Emergency Diesel Generator Rooms P
a. KZIU 6-#15, Zone 1 3
b. KZIU 6-#15, Zone 2 2
13. Component Cooling Water Pump Area
a. KZIU 6-#9, Zone 2 1
b. KZlU 6-#9, Zone 3 2
  • The fire detection instruments located within the Containment are not required to be OPERABLE during the performance of Type A Containment leakage Rate Tests.

TROJAN-UNIT 1 3/4 3-49b Amendment No. 48, 60, 69, % 189

- . .- . -.-- . . . . _ - . .- . .