ML20129A351
From kanterella
ML20129A351 | |
Person / Time | |
---|---|
Site: | Fermi ![]() |
Issue date: | 03/15/1996 |
From: | DETROIT EDISON CO. |
To: | |
Shared Package | |
ML20129A313 | List: |
References | |
DC-76230, DC-76230-R, DC-76230-R00, NUDOCS 9609180171 | |
Download: ML20129A351 (66) | |
Similar Documents at Fermi | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20153B7921998-08-31031 August 1998
[Table view]Rev 0 to Fermi 1 Sar ML20197A9921997-12-15015 December 1997 Rev 0 to Efp,Unit 1 Fermi 1 Sar ML20148A3191997-05-0202 May 1997 SE Summary Rept for Fermi 2, Rev 1 ML20137N1261997-03-25025 March 1997 Rev 0 to Leak-Before-Break Evaluation for Three Locations on Recirculation Sys at Fermi 2 ML20133A2311996-12-19019 December 1996 Ferm 2 CR Simulator Four Yr Rept ML20129A3511996-03-15015 March 1996 Rev 0 to Cchvac Duct & Duct Support Qualification ML20134J6241996-03-13013 March 1996 Rev 0 to Tmr 96-0003, Safety Evaluation ML20083A7591995-05-0808 May 1995 Safety Evaluation Summary Rept, Rev 7 NRC-94-0093, Main Turbine-Generator Vibration Monitoring & Balancing During Start-Up After RF041994-10-0707 October 1994 Main Turbine-Generator Vibration Monitoring & Balancing During Start-Up After RF04 ML20076J6211994-10-0606 October 1994 Safety Evaluation of Rev a to Edp 26726 ML20076J5831994-08-31031 August 1994 Turbine Failure Post-Event Earthquake Passive Instrumentation Data Evaluation ML20076J6081994-08-27027 August 1994 Root Cause Analyses of Fermi 2 Main Turbine Generator Event, Executive Summary ML20076J5891994-08-0808 August 1994 Structural Walkdown Final Rept ML20093N4781994-03-0303 March 1994 Gamma Spectroscopy Analysis Rept ML20093N4901994-03-0303 March 1994 Gamma Spectroscopy Analysis Rept ML20064L9841994-02-0404 February 1994 Turbine Failure,Post-Event Earthquake Instrumentation Data Evaluation ML20126J1141992-12-30030 December 1992 Nuclear Training Simulator Certification ML20099B9921992-07-10010 July 1992 Rev 0 to Updated NUREG-0619 Feedwater Nozzle Fatigue Crack Growth Analysis,Fermi Nuclear Power Plant Unit 2 ML20086P2551991-12-31031 December 1991 Nuclear Training Simulator Certification NRC-91-0039, Safety Evaluation Summary Rept 19901991-03-18018 March 1991 Safety Evaluation Summary Rept 1990 NRC-90-0041, Safety Evaluation Re as-built Notices1989-12-31031 December 1989 Safety Evaluation Re as-built Notices NRC-90-0104, Rev 1 to Decommissioning Cost Study of Enrico Fermi Atomic Power Plant Unit 11989-11-0808 November 1989 Rev 1 to Decommissioning Cost Study of Enrico Fermi Atomic Power Plant Unit 1 ML19354D4801989-10-20020 October 1989 Rev 1 to Safety Evaluation. ML19324B7551989-09-30030 September 1989 Radioiodine & Particle Transmission Through Sampling Lines for Standby Gas Treatment Sys Effluents at Fermi 2, Final Rept ML20248E7021989-09-30030 September 1989 Control Sys Common Power Source Failure Analysis Evaluation Rept for Enrico Fermi Atomic Power Plant Unit 2 ML20247H8991989-08-31031 August 1989 Control Sys Common Sensor Line Failure Analysis Evaluation Rept for Enrico Fermi Atomic Power Plant Unit 2 ML20245B3851989-06-13013 June 1989 ATWS Alternate Rod Insertion & Recirculation Pump Trip Response to NRC Rule 10CFR50.62 ML20235J4271987-09-30030 September 1987 Supplemental Environ Info Enrico Fermi Atomic Power Plant, Unit 1 ML20235G3041987-09-29029 September 1987 Partially Withheld, Preliminary Investigation of Enrico Fermi II Nuclear Power Plant ML20237K6061987-07-31031 July 1987 Suppl 1 to Dcrdr ML20236C8291987-06-29029 June 1987 Preimplementation Audit Rept for Dcrdr for Fermi-2 ML20234C9821987-05-21021 May 1987 Insp Followup of Failure of South Reactor Feed Pump Turbine,Fermi Unit 2 Nuclear Power Plant, Technical Review Rept ML20236C8601987-05-11011 May 1987 Post-Implementation Audit Rept for Fermi-2,SPDS ML20204F1701987-01-31031 January 1987 Maint,Mod & Outage Mgt Monthly Rept. Maint/Mods for Period Ending 870222, Manpower Tracking - Labor Distribution & Period Ending 870125, Hours by Craft Rept, Also Encl ML20209B8231987-01-30030 January 1987 Rev a to Heavy Loads Handling Review,Control of Heavy Loads Over or in Close Proximity to Irradiated Fuel or Critical Safety Sys Components ML20214Q4521986-11-30030 November 1986 Dcrdr Summary Rept,Fermi 2 ML20211D4211986-10-0303 October 1986 Preliminary Steam Bypass Line Structural Evaluation ML20211D3961986-10-0303 October 1986 Preliminary Rept on Main Steam Bypass Piping Fatigue Analysis & Life Expectancy ML20214J8391986-08-31031 August 1986 Final Rept on Metallurgical Investigation of Various Defects on Surfaces of Diesel Engine Aluminum-Tin Bearings ML20209E7591986-07-0202 July 1986 Response to Independent Overview Committee ML20213A5901986-06-30030 June 1986 Investigation of Surface Scoring of Main Bearings:Fairbanks Morse 38TD8-1/8 Diesels at Fermi II Power Plant ML20209E7791986-06-26026 June 1986 Program to Evaluate & Resolve Engineering Issues ML20141M9441986-01-30030 January 1986 Evaluation of Detroit Edison Mgt at Fermi 2 ML20237J4711985-08-31031 August 1985 Rev 1 to Enrico Fermi Atomic Power Plant Unit 2 Primary Containment Negative Pressure Analysis ML20128B7251985-06-30030 June 1985 Rev 4 to Evaluation of Containment Coatings A10089, Investigation of Engine Bearing Distress in Fairbanks-Morse Emergency Diesel Generators at Fermi-II Power Plant, Phase 1:Insp & Preliminary Conclusions1985-02-28028 February 1985 Investigation of Engine Bearing Distress in Fairbanks-Morse Emergency Diesel Generators at Fermi-II Power Plant, Phase 1:Insp & Preliminary Conclusions ML20115F3901985-02-28028 February 1985 Transfix Sys Description. W/Four Proprietary Drawings 8911-M-2000,2001,2006 & 9402-M-2100 Re Transfix Sys P&Id. Drawings Withheld (Ref 10CFR2.790) ML20115F4381985-02-28028 February 1985 Comparison of NUS Process Svcs Corp Mobile Radwaste Processing Sys W/Guidelines of Us NRC Reg Guide 1.143 ML20117D5201985-01-31031 January 1985 Rev 0 to Mark I Wetwell to Drywell Differential Pressure Load & Vacuum Breaker Response for Fermi Atomic Power Plant Unit 2 ML20106G1221985-01-31031 January 1985 Evaluation of Fire Detection Placement at Fermi 2 1998-08-31 Category:TEXT-SAFETY REPORT MONTHYEARML20217N4381999-10-25025 October 1999
[Table view]Safety Evaluation Supporting Amend 17 to License DPR-9 ML20217P3551999-10-22022 October 1999 LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was Provided NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fermi 2.With NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fermi 2.With NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fermi 2.With NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with1999-06-30030 June 1999 Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with NRC-99-0064, Monthly Operating Rept for June 1999 for Fermi 2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fermi 2.With NRC-99-0062, Monthly Operating Rept for May 1999 for Fermi 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fermi 2.With ML20206J9301999-05-10010 May 1999 SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate Valves ML20206G5081999-05-0505 May 1999 Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of Safety NRC-99-0022, Monthly Operating Rept for Apr 1999 for Fermi 2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fermi 2.With ML20205Q7141999-04-15015 April 1999 Safety Evaluation Supporting Amend 16 to License DPR-9 ML20205P9721999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fermi 2 ML20204E0371999-03-17017 March 1999 Safety Evaluation Accepting Licensee Request for NRC Approval of Alternative Rv Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Plant,Unit 2 for 40-month Period ML20204D0361999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fermi 2 ML20198S3341999-01-0606 January 1999 Safety Evaluation Supporting Amend 15 to License DPR-9 NRC-99-0005, Monthly Operating Rept for Dec 1998 for Fermi 2.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fermi 2.With ML20207B7491998-12-31031 December 1998 1998 Annual Operating Rept for Fermi 2 ML20205Q9621998-12-31031 December 1998 Revised Monthly Operating Rept for Dec 1998 for Fermi 2 NRC-99-0021, 1998 Annual Financial Rept for Detroit Edison Co. with1998-12-31031 December 1998 1998 Annual Financial Rept for Detroit Edison Co. with NRC-98-0153, Monthly Operating Rept for Nov 1998 for Fermi 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fermi 2.With NRC-98-0160, Monthly Operating Rept for Oct 1998 for Fermi 2.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fermi 2.With ML20154R2331998-10-21021 October 1998 Safety Evaluation Supporting Amend 13 to License DPR-9 ML20154L1031998-10-14014 October 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode NRC-98-0139, Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With ML20154H8161998-09-30030 September 1998 Rev 0 to COLR Cycle 7 for Fermi 2 ML20153B8811998-09-18018 September 1998 Safety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2 ML20151X0651998-09-11011 September 1998 Safety Evaluation Re Inservice Testing Program Relief Request VR-63 for Plant NRC-98-0111, Monthly Operating Rept for Aug 1998 for Fermi 2.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fermi 2.With ML20153B7921998-08-31031 August 1998 Rev 0 to Fermi 1 Sar ML20237E1171998-08-25025 August 1998 Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam Program ML20236X8611998-08-0505 August 1998 SER Related to Revised Feedwater Nozzle Analysis to Facility Operating License NPF-43,Enrico Fermi Nuclear Power Plant, Unit 2 NRC-98-0109, Monthly Operating Rept for July 1998 for Fermi 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fermi 2 ML20236K3261998-07-0101 July 1998 SER Accepting Licensee Response Related to Revised Feedwater Nozzle Analysis to License NPF-43 for Enrico Fermi Nuclear Power Plant,Unit 2 NRC-98-0097, Monthly Operating Rept for June 1998 for Fermi,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fermi,Unit 2 NRC-98-0127, Annual Rept for Period 970701-9806301998-06-30030 June 1998 Annual Rept for Period 970701-980630 NRC-98-0079, Monthly Operating Rept for May 1998 for Fermi 21998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fermi 2 NRC-98-0076, Monthly Operating Rept for Apr 1998 for Fermi 21998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Fermi 2 NRC-98-0072, Monthly Operating Rept for Mar 1998 for Fermi 21998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fermi 2 NRC-98-0050, Monthly Operating Rept for Feb 1998 for Fermi 21998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fermi 2 NRC-98-0019, Monthly Operating Rept for Jan 1998 for Fermi 21998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fermi 2 ML20198L4241998-01-0808 January 1998 Safety Evaluation Accepting Proposed Rev 2 to Relief Request VR-51 Under Fermi 2 Pump & Valve Inservice Testing Program Per 10CFR50.55a(f)(6)(i) for First 10-yr Interval NRC-98-0015, Monthly Operating Rept for Dec 1997 for Fermi 21997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fermi 2 ML20217N3821997-12-31031 December 1997 Annual Operating Rept for 970101-1231 NRC-98-0053, 1997 Annual Financial Rept for Detroit Edison Company1997-12-31031 December 1997 1997 Annual Financial Rept for Detroit Edison Company ML20205Q9601997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Fermi 2 NRC-97-0141, Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility1997-12-23023 December 1997 Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility ML20197A9921997-12-15015 December 1997 Rev 0 to Efp,Unit 1 Fermi 1 Sar NRC-97-0131, Monthly Operating Rept for Nov 1997 for Fermi 21997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fermi 2 ML20248H1151997-10-31031 October 1997 Rev 1 to Colr,Cycle 6 for Fermi 2 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20129A351&oldid=2891029"