MONTHYEARML20217N4261999-10-25025 October 1999 Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0049, Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included ML20209C1081999-06-29029 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 30 NRC-99-0050, Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included1999-06-24024 June 1999 Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included NRC-99-0075, Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld1999-06-22022 June 1999 Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld ML20212J3861999-06-18018 June 1999 Forwards Rev 29 to Approved UFSAR LCR That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0047, Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl1999-06-0909 June 1999 Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl ML20195G2001999-06-0808 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 28 ML20195E7391999-06-0303 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 27 NRC-99-0046, Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 11999-06-0202 June 1999 Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 1 ML20207D9631999-05-26026 May 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) ML20195B3381999-05-19019 May 1999 Forwards Rev 25 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) NRC-99-0040, Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative1999-05-14014 May 1999 Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative NRC-99-0039, Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl NRC-99-0041, Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl NRC-99-0038, Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii)1999-05-14014 May 1999 Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii) NRC-99-0045, Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl1999-05-0707 May 1999 Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl NRC-99-0044, Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses1999-04-30030 April 1999 Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses NRC-99-0059, Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate1999-04-29029 April 1999 Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate ML20206E2941999-04-28028 April 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 24 NRC-99-0037, Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl1999-04-26026 April 1999 Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl 1999-09-08
[Table view] |
Text
{ N
. i Douglas R. Gipson Senwir Vice Presnient Nuclear Generanon Detroit r., m 6400 North Dune Highway Newport, Michigan 48166 September 13,1996 NRC-96-0109 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) NRC Letter dated December 7,1995, Fermi 2 Control Center Heating, Ventilation and Air Conditioning System (including Safety Evaluation on the same subject)
- 3) NRC Letter dated February 21,1996, Control Center Heating, Ventilation and Air Conditioning (CCHVAC) Concern Resolution
- 4) Detroit Edison Letter NRC-96-0042 dated April 3,1996, NRC March 1,1996 Meeting to Discuss Fermi 2 CCHVAC Duct and Duct Support Structural Qualification Approach
- 5) Fermi Design Criteria Document FERMI-DC-76230-1, Revision A dated June 27,1996, CCHVAC Duct and Duct Support
, Qualification .
1
Subject:
Summary Status Report for Fermi 2 CCHVAC Duct and Duct Suonort Structural Oualification Activities Detroit Edison has completed the evaluations related to the Control Center Heating, Ventilation, and Air Cor.ditioning (CCHVAC) System duct and duct support structural qualification in response to the Reference 2 NRC letter. The purpose of this letter is to summarize the results of the evaluation, and to describe the remaining ) i activities that will be completed prior to restart from the upcoming fifth refueling i outage (RF05). In summary, Detroit Edison is confident that all of the issues and concerns raised by the NRC staffin Reference 2 and subsequent meetings have been properly resolved, and that with the completion of the remaining modifications, the structural adequacy and qualification of the CCHVAC duct and related supports will have been demonstrated.
9609180143 960913 PDR ADOCK 05000341 P PDR
- t. %.
USNRC September 13,1996 NRC-96-0109 Page 2 Hackground In Reference 2, the NRC provided Detroit Edison with a Safety Evaluation regarding the structural qualification of the Control Center Heating, Ventilation and Air Conditioning (CCIIVAC) system for the Fermi 2 plant. The NRC Safety Evaluation noted some denciencies in information previously provided by Detroit Edison, identified several remaining concerns, and requested that Detroit Edison perform further evaluations of the structural adequacy of the CCHVAC ductwork and supports, with proper consideration of the concerns and issues contained in the letter and associated Safety Evaluation. The Reference 2 letter requested that the CCilVAC structural adequacy evaluation and any necessary changes to demonstrate compliance with the committed requirements be completed prior to restart following the 6fth refueling outage, scheduled to begin September 27,1996.
The following discussion summarizes the actions taken by Detroit Edison in response to the Reference 2 NRC letter.
Actions Taken to Resolve CCl!VAC Issues Upon initial review of the Reference 2 NRC letter, Detroit Edison developed an integrated action plan for the resolution of all concerns identified by the NRC.
Detroit Edison retained the services of Raytheon, who was not previously involved with the CCliVAC duct and duct support design or evaluation efforts, to assist in developing and executing the action plan.
The NRC concerns and Detroit Edison's integrated action plan for resolving them were discussed in a meeting at NRC 11eadquarters on February 7,1996 as documented in the Reference 3 NRC letter, with the NRC staff generally concluding that the plan was responsive to the concerns. As stated in the Reference 3 letter.
Detroit Edison and the NRC staff agreed to hold additional working level status meetings as necessary to assure that the analyses and other activities planned by Detroit Edison, when completed, would resolve all of the NRC concerns.
A follow-up meeting was held at the NRC on March 1,1996. A draft Design Criteria Document, which contained individual and specific resolutions to the concerns, was developed prior to that meeting, and was used to structure the technical discussion on duct and duct support structural qualification at that meeting. A markup copy of the document was submitted with the Reference 4 Detroit Edison letter as a means of documenting changes and agreements discussed at the March 1,1996 meeting. The Reference 4 letter also provided additional information regarding the approach for structural qualification of the CCliVAC ducts and hangers that was discussed but not addressed in the design criteria document. The Reference 5 document, provided as
USNRC September 13,1996 NRC-96-0109 Page 3 Enclosure 2, was issued subsequent to the meeting to address all comments, clarifications, and responses to the additional comments, in full compliance with the NRC requirements.
The following discussion summarizes the key activities to implement the integrated action plan. I Integrated Action Plan Description implementation of the action plan to demonstrate qualification of the Fermi 2 CCHVAC system to the requirements of ANSI /ASME-N509-1980 is an integrated effort involving both HVAC systems and civil / structural engineering disciplines. In general terms, the qualification involves both analysis and evaluation of testing regt . ments, with HVAC system calculations for normal and maximum CCHVAC internal duct pressures providing input to both the testing required by the N509 standard c.ad to the duct and hanger structural analysis.
It was recognized prior to updating the CCHVAC system pressure analysis that a plant modification to reduce the recirculation fan speed would be of value to plant ,
operations as well as to the limiting calculated internal duct pressures. This :
modification, to be implemented prior to startup from RFO5 by EDP-28160, has been credited in CCHVAC normal operating and maximum internal duct pressure calculations. Design calculations associated with this EDP indicated that the maximum pressures will be equal to or less than 14 inches of W.G. for recirculation line ductwork, and equal to or less than 6.5 inches of W.G. for the remaining l CCHVAC ductwork. This represents a decrease from the original analysis, which conservatively calculated a recirculation duct maximum pressure of 22 inches of W.G. )
and equal to or less than 11 inches of W.G. for the remaining CCHVAC ductwork. j The revised results are used as input to the ANSI /ASME-N509 qualification testing l evaluation and structural engineering calculations for the CCHVAC ducts and duct supports as summarized in the following paragraphs. ,
1 An evaluation was performed to demonstrate that the CCHVAC meets the qualification testing requirements of ANSI /ASME-N509-1980. The evaluation identifies the portions of the CCHVAC system to which the qualification testing requirements apply, defines the design pressure and allowable leakage for each applicable duct segment based on pressure calculations in accordance with the standard, lists the existing pressure and leakage test results for each applicable duct segment, and documents the qualification conclusion. The evaluation, documented in a design calculation, concluded that given the revised system pressures as a result of EDP-28160, the existing testing demonstrates qualification of the CCHVAC system
' f, 4 USNRC September 13,1996 NRC-96-0109 Page 4 to the requirements of ANSI /ASME-N509-1980, and no additional testing is
. required.
For the purpose of the civil / structural analysis modeling, the CCHVAC system ducts, duct supports, and anchorages were broken down into 22 non-rigid systems and 37 rigid systems. Three-dimensional finite element model, large displacement analyses were performed on select straight rectangular duct segments and transition segments, (i.e., Tees and Wyes), to define the state of stress under the effects of duct internal pressures. The following categories of calculations have been prepared to document the civil / structural analysis methodology, approach, and results:
- Generic Evaluations for String Analysis & Duct Supports
- Duct String Analysis & Support Evaluation (various systems)
- Duct Skin Stress Evaluation Under Internal Pressure
- Duct Evaluation (various systems)
- Duct & Support Evaluation of Rigid Systems All analyses and evaluations were performed in accordance with the requirements of the Reference 5 Design Criteria Document. The conservative allowable stress limits for the duct and supports were based on the ANSl/ASME-N509-1980 and AISC limits.
Conditions where the calculated stress exceeded code qualification allowables were identified for some supports, anchorages, duct segments, and one Wye duct section.
Plant modifications were identified for these cases, and the modified configurations were evaluated for adequacy. The extent and nature of the duct, support, and anchorage modifications are generally characterized as follows:
- New supports required due to duct overstress - 4 (in 3 systems)
- Supports requiring additional bracing or member - 16 (in 7 systems)
- Support connection to duct to provide positive axial connection - 1 Structural modifications required to meet the criteria of the CCHVAC structural qualification evaluations will be completed by EDP-28147 prior to startup from RF05.
Individual NRC Staff Concerns Identified in the Reference 2 NRC Letter All NRC staff concerns identified in the Reference 2
- m have been specifically and individually considered and resolved, as summariz u + 1 alar form in Enclosure 1.
The table provides a cross reference to the applica M suon of the Design Criteria
t USNRC September 13,1996 )
NRC-96-0109 i Page 5 Document that addresses the NRC concern. It should be noted that the Enclosure 1 table does not address concerns 1,6,7,8,10, and 11. This is because concerns 1,6, ,
7, and 8 were closed by the Reference 2 letter, and because concerns 10 and 11 are i included in the technical issues of concems 3 and 13, which are addressed by the table :
in Enclosure 1.
Summary and Conclusion ;
Detroit Edison has completed the evaluations related to the Control Center Heating, Ventilation, and Air Conditioning (CCHVAC) System duct and duct support structural qualification in response to the Reference 2 NRC letter. Detroit Edison is confident that all of the issues and concerns raised by the NRC staff have been properly resolved, and that the structural adequacy and qualification of the CCHVAC -
duct and related supports have been demonstrated, subject to the completion of the remaining modifications during the outage.
Commitments I The following commitments are being made in this letter:
- The CCHVAC recirculation fan speed modification required to meet the criteria of the CCHVAC structural qualification evaluations will be completed prior to startup from RF05.
- Structural modifications required to meet the criteria of the CCHVAC ,
l structural qualification evaluations will be completed prior to startup from RFO5.
\
! If you have any questions on this matter, please contact Mr. Robert Newkirk at I
(313) 586-4211.
i
! Sincerely, ,,
Enclosures cc: A. B. Beach i M. J. Jordan A. J. Kugler A. Vegel '
i I
Enclosure I to -
NRC-96-0109 Page1 CCHVAC Concern Resolution Approach and Implementation Summary 12n/95 RESOLUTION APPROACH IMPLEMENTING NRC SECTION NO.
LETTER OF DESIGN CRITERIA CONCERN FERMI-DC-76230-1 NO.
1, 6, 7, 8 Closed in 12R/95 NRC letter -
10,1I Included in technical concerns 3 and 13, which are -
addressed below i
3,15,18 In calculating duct properties, bare (0.0478") metal 3.3 thickness is used.
3,32,13. Acceptance criteria is based en the minimum 3.2 15,18,19 published yield and ultimate strengths of materials used. For duct work components, these are:
Sheet Metal: ASTM A-526/527 Fy=33ksi Stiffeners: ASTM A-575 Fy=32ksi l Welds: Based on ASTM A-527 Fu=45ksi 2, 3 in calculating seismic responses and internal and 3.4.1, 3.4.2 support reaction loads," Effective Sections" are determined and used. The approach used for the
" Effective Section" calculations is based on guidance provided in the AISI manual and various industry references. j 3,4,14,15, Seismic response loads resulting from the 3.5.1 18 simultaneous application of the three directional SSE seismic effects is considered in the evaluations of duct-duct supports.
18 Damping values do not exceed 7% and 4% in the 3.5.3.1 analysis of duct-duct support systems with rectangular and circular ducts respectively, under the SSE effects.
4 4 4
I i'
Enclosure 1 to NRC-96-0109 *
! Page 2 12/7/95 RESOLUTION APPROACH IMPLEMENTING i NRC SECTION NO.
- LETTER OF DESIGN CRITERIA j CONCERN FERMI-DC-76230-1 NO.
3,13,15 For calculation of stresses in rectangular duct due to 3.3 internal pressure loading, a finite element model of a bounding duct segment (s) (stiff. to stiff.) is prepared and analyzed. The results, together with guidance provided in indt..ary references, are used for the evaluation of other duct panels.
5 The duct work & supports of the Fermi 2 CCHVAC 3.3 were fabricated and installed in accordance with the
- requirements of SMACNA standards. The need for i proper stiffening of" Tee & Wye" pieces and other !
discontinuities is recognized by SMACNA. In addition, support requirements in the proximity of i such fittings are also specified, to reduce the loading.
Such " Fittings" were selected & analyzed in detail, on duct runs subject to high (14 inch WG) pressure, l to show adequacy. Modifications are identified and issued as required.
9,14 Appropriate vertical seismic response spectra from 3.5.3.1, i the UFSAR are used in the evaluation of seismic Appendix B
! effects. The correctness of the vertical accelerations 2
of these spectra at 50 llz has been clarified at the 3/1/96 NRC/ DECO meeting.
18,19 Duct supports are evaluated for structural adequacy 3.5.4, 3.5.4.2 to safely resist the calculated reaction loads resulting from simultaneous application of dead weight, pressure and SSE response loads. Acceptance criteria of UFS AR Table 3.8-19 for structural steel is used.
i r - - - -
Enclosure 1 to NRC-96-0109 j Page 3 l l
12/7/95 RESOLUTION APPROACH IMPLEMENTING NRC SECTION NO.
LE' ITER OF DESIGN CRITERIA ;
CONCERN FERMI-DC-76230-1 :
NO.
3,16,17,18 Calculated duct maximum stresses resulting from the 3.5.4.1 load combination of dead weight, maximum pressure and three directional SSE response loads remain within 0.9 Fy of the material per ANSI /ASME- ;
I N509-1980.
Hardware modifications are being designed and 3.2, 3.3 l
implemented when the duct or duct support / anchorage allowables are exceeded.
12,13 With the reduced calculated pressures (6.5 inch WG -
& 14 inch WG) and limitation of stresses to elastic limit, the longitudinal joint structural adequacy and leak tightness are further ensured. The tests performed at -20.5 inch W.G. have demonstrated the adequacy of thejoints at higher pressure. In fact, the in-leakages occurred at areas other than joints.
Periodic tests of select duct segments will provide further assurance of adequacy. Based on this, the existing installation longitudinal joints are considered acceptable, and effectively in accordance with ANSI /ASME-N509-1980.
12,19 Appropriate minimum published yield and ultimate 3.2, 3.6.2 strength are used for the structural adequacy 3
evaluation of the duct stiffener material. Although
{ not specifically listed in the ANSI /ASME-N509-i 1980, this material is similar to those listed.
Recognizing the fact that it is not practical for a standard to list multitudes of materials, it is considered that, with the use of appropriate strength values, this material is acceptable to ANSI /ASME-N509-1980.
]
, 1 i !
l i .
1'
]
i
Enclosure 2 to i NRC-96-0109 Page1 Enclosure 2 Fermi Design Chia Document FERMI-DC-76230-1 Revision A dated June 27,1996 CCHVAC Duct and Duct Support Qualification I
i
l ', 4, Enclosure I to I NRC-96-0109 Pagei CCIIVAC Concern Resolution Approach and Implementation Summary 12/7/95 RESOLUTION APPROACH IMPLEMENTING NRC SECTION NO.
LETTER OF DESIGN CRITERIA CONCERN FERMI-DC-76230-1 NO.
4 1,6,7,8 Closed in 12/7/95 NRC letter -
a 10,11 Included in technical concerns 3 and 13, which are -
addressed below 3,15,18 In calculating duct properties, bare (0.0478") metal 3.3 thickness is used.
3,12,13, Acceptac..e criteria is based on the minimum 3.2 15,18,19 published yield and ultimate strengths of materials used. For duct work components, these are:
Sheet Metal: ASTM A-526/527 Fy=33ksi Stiffeners: ASTM A-575 Fy=32ksi Welds: Based on ASTM A-527 Fu=45ksi 2, 3 In calculating seismic responses and internal and 3.4.1, 3.4.2 support reaction loads, " Effective Sections" are determined and used. The approach used for the
" Effective Section" calculations is based on guidance provided in the AISI manual and various industry references.
3,4,14,15, Seismic response loads resulting from the 3.5.1 18 simultaneous application of the three directional SSE seismic effects is considered in the evaluations of duct-duct supports.
18 Damping values do not exceed 7% and 4% in the 3.5.3.1 analysis of duct-duct support systems with rectangular and circular ducts respectively, under the SSE effects.
l 1
2
Enclosure I to NRC-96-0109 Page 2 s 12/7/95 RESOLUTION APPROACII IMPLEMENTING NRC SECTION NO. l LETTER OF DESIGN CRITERI A l CONCERN FERMI-DC-76230-1 f NO. l 3,13,15 For calculation of stresses in rectangular duct due to 3.3 i
internal pressure loading, a finite element model of a bounding duct segment (s)(stiff. to stiff.) is prepared and analyzed. The results, together with guidance provided in industry references, are used for the ;
evaluation of other duct panels.
5 The duct work & supports of the Fermi 2 CCliVAC 3.3 were fabricated and installed in accordance with the requirements of SMACNA standards. The need for proper stiffening of" Tee & Wye" pieces and other discontinuities is recognized by SMACNA. In :
addition, support requirements in the proximity of such fittings are also specified, to reduce the loading.
Such " Fittings" were selected & analyzed in detail, on duct runs subject to high (14 inch WG) pressure, j to show adequacy. Modifications are identified and issued as required. !
9,14 Appropriate vertical seismic response spectra from 3.5.3.1, ;
the UFSAR are used in the evaluation of seismic Appendix B effects. The correctness of the vertical accelerations of these spectra at 50 liz has been clarified at the l 3/1/96 NRC/ DECO meeting.
18,19 Duct supports are evaluated for structural adequacy 3.5.4, 3.5.4.2 to safely resist the calculated reaction loads resulting from simultaneous application of dead weight, pressure ind SSE response loads. Acceptance criteria of UFSAR Table 3.8-19 for stnictural steel is used.
, t, Enclosure 1 to NRC-96-0109 Page 3 12/7/95 RESOLUTION APPROACil IMPLEMENTING NRC SECTION NO.
LETTER OF DESIGN CRITERIA CONCERN FERMI-DC-76230-1 NO.
3,16,17,18 Calculated duct maximum stresses resulting from the 3.5.4.1 load combination of dead weight, maximum pressure and three directional SSE response loads remain within 0.9 Fy of the material per ANSI /ASME-N509-1980.
liardware modifications are being designed and 3.2, 3.3 ,
implemented when the duct or duct support / anchorage allowables are exceeded.
12,13 With the reduced calculated pressures (6.5 inch WG -
& 14 inch WG) and limitation of stresses to elastic limit, the longitudinaljoint structural adequacy and leak tightness are further ensured. The tests performed at -20.5 inch W.G. have demonstrated the adequacy of thejoints at higher pressure. In fact, the in-leakages occurred at areas other than joints.
Periodic tests of select duct segments will provide 1 further assurance of adequacy. Based on this, the existing installation longitudinaljoints are considered j acceptable, and effectively in accordance with ANSl/ASME-N509-1980.
1 12,19 Appropriate minimum published yield and ultimate 3.2, 3.6.2 l
l strength are used for the structural adequacy
, evaluation of the duct stiffener material. Although '
j not specifically listed in the ANSI /ASME-N509 1980, this material is similar to those listed.
Recognizing the fact that it is not practical for a standard to list multitudes of materials, it is considered that, with the use of appropriate strength values, this materialis acceptable to ANSI /ASME-
! N509-1980.
Enclosure 2 to NRC-96-0109 Pagei Enclosure 2 l
Fermi Design Criteria Document FERMI-DC-76230-1 !
Revision A dated June 27,1996 '
CCIIVAC Duct and Duct Support Qualification l
l
DETROIT EDISON COMPANY ENRICO FERMI POWER PLANT UNIT 2 DE9p m W '
. . < PLANT ENGINEERING
, VENDOR DOCUMEKr APPROVAL ' mLE APPROVED AS NOTED NOT APPROVED
, T'n %% 5*"4b" ?"#'N "'"
os,e&qrto f\0 Ol,032 i eAcc: nev. A pis NO. T4100 '
P.O. 1 b NO: b~
DATE: S b Ob M / VENDOR NAME: Rap - ,, /2/,fd)d 2(dL f
suecastoma toison onAwwo wo. suecascocoev: ##7Ab (4) 20 -06 RC ~ %~ 03 f
DESIGN CRITERIA NO. FERMI-DC-76230-1 CCHVAC DUCT AND DUCT SUPPORT QUALIFICATION
- Rev. A 4 3 ?^+^ i k C A M ;; . A ; . ,':AA' ;= :: ,= 1== m
' N .- , .
> = RSV. k IMc0RPORA Ye*D 7tC DATkBME tu s+PMOtX A ,, l
- RtrPL-At E O P. 3 C' *F' 3 6 ; ADDED PA46$ At - A43 R5VesCD p.2.Sof34.
4 REVISION RO R1 R2 R3 R4 1
DATE 3/15/96 l PREPARED 4.r>so/'h ,
REVIEWED f%JQa,3 APPROVED %hg l
Baytheon Engineers &
Constructors l
l
_ __ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . . _ .