ML20140J265

From kanterella
Revision as of 10:29, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Due to Region 1 Project Realignment,Tc Elsasser New Facility Section Chief & EC Wenzinger Will Remain Branch Chief,Effective on 860331
ML20140J265
Person / Time
Site: 05000157, 05000097
Issue date: 03/27/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Streett D
CORNELL UNIV., ITHACA, NY
References
NUDOCS 8604040292
Download: ML20140J265 (2)


Text

I

,t .

Docket Nos. 50-157 50-97 Cornell University

. ATTN: Dean W. B. Streett College of Engineering 241 Carpenter Hall Ithaca, New York 14853 Gentlemen:

Subject:

Projects Realignment in Region I The purpose of this letter is to. inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace Mr. Ebe C. McCabe as the cognizant Section Chief for your facility. Mr. Elsasser can be reached on 215-337-5378. I will retain responsibility as the cognizant Branch Chief. This realignment will become effective on March 31, 1986.

Sincerely, yW Signed 8E4.

Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:

Dr. D. D. Clark, Director, Ward Laboratory of Nuclear Engineering H. Aderhold, Reactor Supervisor, Ward Laboratory Dr. W. Kiker, Director of Environmental Health Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New York 8604040292 860 7 PDR ADOCK O pg P

I 0 1W01

F. - "

o- 7,.

i Cornell University 2 MAR 2 7 W bec:

Region-I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Grant H. Berkow, NRR RI:DRP rid R R: RP as Grlint/meo LP/

Elrap ef_ We zinger St ro ecki 3/ll/86 3 g7 V -

0FFICIAL RECORD COPY