|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20211D4131999-08-0606 August 1999 Confirms Arrangements for Administration of OL Exam at Cornell Univ Triga Reactor.Forwards Ref Matl for Reactor, SRO Licensing Exam & Administration of Written Exam ML20210L0561999-08-0404 August 1999 Forwards Insp Repts 50-097/99-201 & 50-157/99-201 on 990426-30.No Violations Noted ML20206G5631999-04-28028 April 1999 Forwards Amend 6 to License R-89 & Se.Amend Modifies Some ACs in Section 6 of TSs in Response to ML20206G4631999-04-28028 April 1999 Forwards Amend 12 to License R-80 & Safety Evaluation.Amend Modifies Some of Administrative Controls in Section 6 of TSs in Response to Ltr of 990308 ML20205C0211999-03-23023 March 1999 Forwards Request for Amend to Cornell Univ Triga Reactor, License R-80 & Zpr Reactor,License R-89,TS Section 6, Administrative Controls ML20197C5571998-09-0808 September 1998 Informs of Listed Personnel Changes within Ward Ctr for Nuclear Sciences Administrative & Staffing Structure.Updated List of Telephone Numbers Encl ML20151U9021998-09-0808 September 1998 Informs That NRC Reviewed Info Provided in Ltr Dtd 980813. Univ Meets Criteria in 10CFR30,App E for self-guaranteeing Decommissioning Costs of Cornell Triga & Sero-Power Reactors ML20237B4001998-08-13013 August 1998 Requests Consideration for self-guarantee Financial Assurance Method for Decommissioning of Triga Reactor & Zero-Power Reactor,Per 10CFR50.33(k)(2) & 50.75(d). Decommissioning rept,FY96-97 Financial Rept,Included ML20236W4011998-07-28028 July 1998 Forwards Annual Rept Covering Activities of Cornell Triga Reactor & Cornell Zero Power Reactor During 12-month Period Ending 980630 ML20236S9391998-07-22022 July 1998 Forwards Copy of Recently Approved Regulation in Fr 63FR29535,dtd 980601,which Permits Colleges & Univ to self- Guarantee Decommissioning Costs of Certain Criteria Met ML20212D3031997-10-28028 October 1997 Forwards Transmittal of Annual Rept Covering Activities of Cornell Triga Reactor & Cornell Zero Power Reactor During 12 Month Period Ending 970630 ML20212D3101997-10-28028 October 1997 Submits Annual Rept Covering Activities of Cornell Triga Reactor & Cornell Zero Power Reactor,To Satisfy Reporting Requirements of 10CFR50.59,in Respect to Activities During Period 960701-970630 ML20217H9361997-08-0606 August 1997 Responds to Correspondence of 970515 Re Changes to Ward Lab, Cornell Univ Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Plan,withheld,per 10CFR2.790.No NRC Approval Required ML20198F0071997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20149H1561997-07-22022 July 1997 Ack Receipt of 970203 Rev 3 to Ward Lab for Nuclear Sciences Emergency Plan Submitted Under Provisions of 10CFR50.54(q).Implementation of Changes Will Be Subj to Insp to Confirm That They Did Not Decrease Effectiveness of Plan ML20141K5611997-05-23023 May 1997 Forwards Amend 5 to License R-89 & Se.Amend Modifies Line Organization Which Directs Zero Power Reactor,In Response to ML20141K3881997-05-23023 May 1997 Forwards Amend 11 to License R-80 & Safety Evaluation.Amend Modifies Line Organization Which Directs Triga Reactor,In Response to ML20141F6761997-05-15015 May 1997 Forwards Codified Ward Lab Physical Security Plan Per 10CFR50.4 & 50.34.Encl Withheld ML20148C1941997-05-0505 May 1997 Forwards Insp Repts 50-097/97-01 & 50-157/97-01 on 970410. No Violations Noted ML20138D7361997-04-24024 April 1997 Forwards Amended Cover Ltr & Rept Cover Sheet for Convenience in Posting Correction to Insp Rept 50-157/97-01, Issued on 970414 as Insp Rept 50-197/97-01 ML20134K7741997-02-12012 February 1997 Forwards Amend 4 to License R-89 & Safety Evaluation.Amend Removes Authority from License to Operate Reactor,Authorizes possession-only of Reactor & Changes TS to Remove Operational Requirements Not Needed ML20134G5681997-02-0505 February 1997 Forwards Amend 10 to License R-80 & Safety Evaluation. Amend Transfers Possession of 16.0 Gram Pu-Be Neutron Source from Zero Power Reactor to Triga Reactor License ML20132E6721996-12-16016 December 1996 Forwards Application for Amend to Facility License R-89.W/o Encl ML20133E3461996-12-11011 December 1996 Responds to RAI in Consideration of Telcon on 961205.Amended License Condition B.2 Deleting 16.0 Gram Pu-Be Startup Source & Amended License Condition C.1 Reflecting possession-only Status of License,Encl ML20135B8531996-11-27027 November 1996 Responds to RAI in Consideration of Telcon of 961121 & Fax Received on 961122 for License Amend to Withdraw Authorization to Operate Cornell Univ Zero Power Reactor ML20149L8491996-11-12012 November 1996 Forwards Certificate to Lassell for Completion of Senior Operator Courses ML20134G1601996-11-0101 November 1996 Forwards Request for Amend to Cornell Univ Zero Power Reactor,License R-89 as Renewed on 831104 ML20128L5881996-10-10010 October 1996 Forwards Copy of Results of Operator Initial Exam Conducted on 960926.W/o Encl ML20128N3651996-10-10010 October 1996 Forwards Results of Exam Rept 50-157/OL-96-01 Conducted During Wk of 960923 ML20059A6051993-12-23023 December 1993 Forwards Certificate Suitable for Framing to Be Issued to Each Listed Newly Licensed Operator.W/O Encl ML20059C3951993-12-23023 December 1993 Forwards Requalification Exam Repts 50-097/OL-93-02 & 50-157/OL-93-02 Administered During Wk of 931004.W/o Encl ML20059C3981993-12-23023 December 1993 Forwards Requalification Exam Repts 50-097/OL-93-02 & 50-157/OL-93-02 Administered During Wk of 931004 ML20058N6101993-12-15015 December 1993 Forwards Results for Operator Requalification Exam Conducted at Cornell Univ on 931004-07.W/o Encl ML20058E4961993-12-0101 December 1993 Forwards Insp Rept 50-157/93-02 on 931108-10.No Safety Concerns or Violations Noted ML20059L7681993-11-12012 November 1993 Forwards Initial Exam Repts 50-097/OL-93-01 & 50-157/OL-93-01 During Wk of 931004.Facility Comments & NRC Resolution of Comments & Exam & Answer Key Also Encl.W/O Encl ML20059L7371993-11-12012 November 1993 Forwards Results for Operator Initial Exam Conducted at Cornell Univ on 931005-06.W/o Encl ML20062G8371990-11-21021 November 1990 Forwards Exam Rept 50-157/90-03OL of Exam Administered on 901023-24 ML20059L6811990-09-10010 September 1990 Notifies That NRC Region I Has Realigned Responsibility for Research & Test Reactor Insp Program Activities for Nonpower Reactor Projects ML20055H5121990-07-25025 July 1990 Submits Decommissioning Rept,Per 10CFR50.75(d),including Cost Estimate & Description of Cost Estimate Adjustments IR 05000097/19890011989-05-12012 May 1989 Forwards Safety Insp Repts 50-097/89-01 & 50-157/89-01 on 890425-26.Weakness Identified in Area of Documentation ML20246N8121989-03-22022 March 1989 Submits Update on Status of Research & Test Reactor Seminar Planned by Region 1 & Initially Proposed in . Seminar Agenda & Map of Local Area Encl ML20154D7901988-05-13013 May 1988 Forwards Amend 9 to License R-80 & Safety Evaluation. Amend Consists of Additions to Tech Specs to Include Restricted Mode of Operation When aluminum-clad low-hydride Fuel Element,Containing Thermocouple,In Core ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20236H5031987-10-29029 October 1987 Forwards Safety Insp Repts 50-157/87-01 & 50-097/87-01 on 870923-24.Required Annual Exam of Licensed Operators Not Performed for One Operator.Licensee Should Review Available Administrative Sys Outside Ward Lab ML20214R8361987-05-27027 May 1987 Informs of Realignment within NRC Region I Div of Reactor Projects Affecting Responsibility for Insp of Research & Test Reactors.New NRC Contacts Listed.Final Rules 10CFR50 & 51, Communications Procedures Amends, Encl ML20215C6641986-12-0808 December 1986 Forwards Exam Rept 50-157/86-01 of Exam Administered on 861014 ML20199G4491986-06-18018 June 1986 Notifies That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for 861014-15.Ref Matls Listed on Encl Needed by 860815 ML20210H8711986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20140J2651986-03-27027 March 1986 Informs That Due to Region 1 Project Realignment,Tc Elsasser New Facility Section Chief & EC Wenzinger Will Remain Branch Chief,Effective on 860331 ML20199F4261986-03-20020 March 1986 Notifies That Approved QA Program for Radiation Matl Packages Expired on 851231 W/No Renewal Requested.Shipment of Spent Fuel Made on 860127 W/O Proper License.Licensee Must Request Renewal Prior to Expiration 1999-08-06
[Table view] Category:NRC TO EDUCATIONAL INSTITUTION
MONTHYEARML20059L6811990-09-10010 September 1990 Notifies That NRC Region I Has Realigned Responsibility for Research & Test Reactor Insp Program Activities for Nonpower Reactor Projects IR 05000097/19890011989-05-12012 May 1989 Forwards Safety Insp Repts 50-097/89-01 & 50-157/89-01 on 890425-26.Weakness Identified in Area of Documentation ML20246N8121989-03-22022 March 1989 Submits Update on Status of Research & Test Reactor Seminar Planned by Region 1 & Initially Proposed in . Seminar Agenda & Map of Local Area Encl ML20154D7901988-05-13013 May 1988 Forwards Amend 9 to License R-80 & Safety Evaluation. Amend Consists of Additions to Tech Specs to Include Restricted Mode of Operation When aluminum-clad low-hydride Fuel Element,Containing Thermocouple,In Core ML20236H5031987-10-29029 October 1987 Forwards Safety Insp Repts 50-157/87-01 & 50-097/87-01 on 870923-24.Required Annual Exam of Licensed Operators Not Performed for One Operator.Licensee Should Review Available Administrative Sys Outside Ward Lab ML20214R8361987-05-27027 May 1987 Informs of Realignment within NRC Region I Div of Reactor Projects Affecting Responsibility for Insp of Research & Test Reactors.New NRC Contacts Listed.Final Rules 10CFR50 & 51, Communications Procedures Amends, Encl ML20215C6641986-12-0808 December 1986 Forwards Exam Rept 50-157/86-01 of Exam Administered on 861014 ML20199G4491986-06-18018 June 1986 Notifies That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for 861014-15.Ref Matls Listed on Encl Needed by 860815 ML20140J2651986-03-27027 March 1986 Informs That Due to Region 1 Project Realignment,Tc Elsasser New Facility Section Chief & EC Wenzinger Will Remain Branch Chief,Effective on 860331 ML20210H8711986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20199F4261986-03-20020 March 1986 Notifies That Approved QA Program for Radiation Matl Packages Expired on 851231 W/No Renewal Requested.Shipment of Spent Fuel Made on 860127 W/O Proper License.Licensee Must Request Renewal Prior to Expiration ML20138D1311985-09-18018 September 1985 Forwards Safety Insp Repts 50-097/85-01 & 50-157/85-01 on 850422-24 & Notice of Violation.Response to Violation Should Also Address Corrective Actions Associated W/Emergency Drill & Operations Audit ML20127N0761985-06-25025 June 1985 Forwards Safety Insp Repts 50-097/85-02 & 50-157/85-02 on 850520-23.No Violation Noted ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1990-09-10
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20211D4131999-08-0606 August 1999 Confirms Arrangements for Administration of OL Exam at Cornell Univ Triga Reactor.Forwards Ref Matl for Reactor, SRO Licensing Exam & Administration of Written Exam ML20210L0561999-08-0404 August 1999 Forwards Insp Repts 50-097/99-201 & 50-157/99-201 on 990426-30.No Violations Noted ML20206G5631999-04-28028 April 1999 Forwards Amend 6 to License R-89 & Se.Amend Modifies Some ACs in Section 6 of TSs in Response to ML20206G4631999-04-28028 April 1999 Forwards Amend 12 to License R-80 & Safety Evaluation.Amend Modifies Some of Administrative Controls in Section 6 of TSs in Response to Ltr of 990308 ML20151U9021998-09-0808 September 1998 Informs That NRC Reviewed Info Provided in Ltr Dtd 980813. Univ Meets Criteria in 10CFR30,App E for self-guaranteeing Decommissioning Costs of Cornell Triga & Sero-Power Reactors ML20236S9391998-07-22022 July 1998 Forwards Copy of Recently Approved Regulation in Fr 63FR29535,dtd 980601,which Permits Colleges & Univ to self- Guarantee Decommissioning Costs of Certain Criteria Met ML20217H9361997-08-0606 August 1997 Responds to Correspondence of 970515 Re Changes to Ward Lab, Cornell Univ Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Plan,withheld,per 10CFR2.790.No NRC Approval Required ML20198F0071997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20149H1561997-07-22022 July 1997 Ack Receipt of 970203 Rev 3 to Ward Lab for Nuclear Sciences Emergency Plan Submitted Under Provisions of 10CFR50.54(q).Implementation of Changes Will Be Subj to Insp to Confirm That They Did Not Decrease Effectiveness of Plan ML20141K5611997-05-23023 May 1997 Forwards Amend 5 to License R-89 & Se.Amend Modifies Line Organization Which Directs Zero Power Reactor,In Response to ML20141K3881997-05-23023 May 1997 Forwards Amend 11 to License R-80 & Safety Evaluation.Amend Modifies Line Organization Which Directs Triga Reactor,In Response to ML20148C1941997-05-0505 May 1997 Forwards Insp Repts 50-097/97-01 & 50-157/97-01 on 970410. No Violations Noted ML20138D7361997-04-24024 April 1997 Forwards Amended Cover Ltr & Rept Cover Sheet for Convenience in Posting Correction to Insp Rept 50-157/97-01, Issued on 970414 as Insp Rept 50-197/97-01 ML20134K7741997-02-12012 February 1997 Forwards Amend 4 to License R-89 & Safety Evaluation.Amend Removes Authority from License to Operate Reactor,Authorizes possession-only of Reactor & Changes TS to Remove Operational Requirements Not Needed ML20134G5681997-02-0505 February 1997 Forwards Amend 10 to License R-80 & Safety Evaluation. Amend Transfers Possession of 16.0 Gram Pu-Be Neutron Source from Zero Power Reactor to Triga Reactor License ML20149L8491996-11-12012 November 1996 Forwards Certificate to Lassell for Completion of Senior Operator Courses ML20128N3651996-10-10010 October 1996 Forwards Results of Exam Rept 50-157/OL-96-01 Conducted During Wk of 960923 ML20128L5881996-10-10010 October 1996 Forwards Copy of Results of Operator Initial Exam Conducted on 960926.W/o Encl ML20059A6051993-12-23023 December 1993 Forwards Certificate Suitable for Framing to Be Issued to Each Listed Newly Licensed Operator.W/O Encl ML20059C3951993-12-23023 December 1993 Forwards Requalification Exam Repts 50-097/OL-93-02 & 50-157/OL-93-02 Administered During Wk of 931004.W/o Encl ML20059C3981993-12-23023 December 1993 Forwards Requalification Exam Repts 50-097/OL-93-02 & 50-157/OL-93-02 Administered During Wk of 931004 ML20058N6101993-12-15015 December 1993 Forwards Results for Operator Requalification Exam Conducted at Cornell Univ on 931004-07.W/o Encl ML20058E4961993-12-0101 December 1993 Forwards Insp Rept 50-157/93-02 on 931108-10.No Safety Concerns or Violations Noted ML20059L7681993-11-12012 November 1993 Forwards Initial Exam Repts 50-097/OL-93-01 & 50-157/OL-93-01 During Wk of 931004.Facility Comments & NRC Resolution of Comments & Exam & Answer Key Also Encl.W/O Encl ML20059L7371993-11-12012 November 1993 Forwards Results for Operator Initial Exam Conducted at Cornell Univ on 931005-06.W/o Encl ML20062G8371990-11-21021 November 1990 Forwards Exam Rept 50-157/90-03OL of Exam Administered on 901023-24 ML20059L6811990-09-10010 September 1990 Notifies That NRC Region I Has Realigned Responsibility for Research & Test Reactor Insp Program Activities for Nonpower Reactor Projects IR 05000097/19890011989-05-12012 May 1989 Forwards Safety Insp Repts 50-097/89-01 & 50-157/89-01 on 890425-26.Weakness Identified in Area of Documentation ML20246N8121989-03-22022 March 1989 Submits Update on Status of Research & Test Reactor Seminar Planned by Region 1 & Initially Proposed in . Seminar Agenda & Map of Local Area Encl ML20154D7901988-05-13013 May 1988 Forwards Amend 9 to License R-80 & Safety Evaluation. Amend Consists of Additions to Tech Specs to Include Restricted Mode of Operation When aluminum-clad low-hydride Fuel Element,Containing Thermocouple,In Core ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20236H5031987-10-29029 October 1987 Forwards Safety Insp Repts 50-157/87-01 & 50-097/87-01 on 870923-24.Required Annual Exam of Licensed Operators Not Performed for One Operator.Licensee Should Review Available Administrative Sys Outside Ward Lab ML20214R8361987-05-27027 May 1987 Informs of Realignment within NRC Region I Div of Reactor Projects Affecting Responsibility for Insp of Research & Test Reactors.New NRC Contacts Listed.Final Rules 10CFR50 & 51, Communications Procedures Amends, Encl ML20215C6641986-12-0808 December 1986 Forwards Exam Rept 50-157/86-01 of Exam Administered on 861014 ML20199G4491986-06-18018 June 1986 Notifies That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for 861014-15.Ref Matls Listed on Encl Needed by 860815 ML20210H8711986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20140J2651986-03-27027 March 1986 Informs That Due to Region 1 Project Realignment,Tc Elsasser New Facility Section Chief & EC Wenzinger Will Remain Branch Chief,Effective on 860331 ML20199F4261986-03-20020 March 1986 Notifies That Approved QA Program for Radiation Matl Packages Expired on 851231 W/No Renewal Requested.Shipment of Spent Fuel Made on 860127 W/O Proper License.Licensee Must Request Renewal Prior to Expiration ML20138D1311985-09-18018 September 1985 Forwards Safety Insp Repts 50-097/85-01 & 50-157/85-01 on 850422-24 & Notice of Violation.Response to Violation Should Also Address Corrective Actions Associated W/Emergency Drill & Operations Audit ML20127N0761985-06-25025 June 1985 Forwards Safety Insp Repts 50-097/85-02 & 50-157/85-02 on 850520-23.No Violation Noted ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1999-08-06
[Table view] |
Text
_. _
JUN 181986 Docket Nos. 50-97 50-157 Cornell University ATTN: Dean W. B. Streett College of Engineering 241 Carpenter Hall Ithaca, New York 14853 3
SUBJECT:
REACTOR OPERATOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. H. Aderhold, training coordinator and Mr. D. Coe, Examiner, arrangements were made for the administration of the examinations at Cornell University.
The examinations are scheduled for October 14-15, 1986.
In order for us to meet the above schedule, it will be necessary for the facil-ity to furnish the approved reference material listed in Attachment.1, " Refer-ence Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations," by August 15, 1986. Any delay in receiving properly bound and indexed reference material will result in a delay in administering the examina-tions. Our examinations are scheduled far in advance with considerable plan-ning to utilize our present limited examiner manpower and to meet the examina-tion dates requested by the various facilities. Therefore, missing the August 15, 1986 deadline, even by a few days, likely will result in a long delay because it may not be possible to reschedule examinations at other facilities. Mr. H. Aderhold has been advised of our reference material sets that are required, and the examiner's names and addresses where each set is to be mailed. Region 1 should also receive a reference set.
Please disregard those times on Attachment I which do not apply to your facil-ity (e.g. simulator Reference Material).
The facility management is responsible for providing adequate space and facili-ties in order to properly conduct the written examinations. Attachment 2, "Ad-mini stration of Reactor / Senior Reactor Operator Licensing Written Examinations,"
describes our requirements for conducting these examinations. Mr. H. Aderhold has also been informed of these requirements.
This letter replaces and supersedes our previous operator Licensing Letter to you dated April 28, 1986.
OFFICIAL RECORD COPY OL 90 CORNELL U - 0001.0.0 1 06/17/86 IECI ,
bN 7 ' I 1
V
Cornell University 2 1 Attachment 2, also contains the Rules and Guidance that will be in effect dur-ing the administration of the written examination. The facility management is responsible for ensuring that all candidates are aware of these Rules.
All reactor operator and senior reactor operator license applications should 1
normally be submitted at least 60 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments af-ter candidate eligibility has been determined. If the applications are not received at least 30 days before the examination dates, it is likely that a postponement will be necessary.
4 i
This request for information was approved by the Office of Management and Budg-et under Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C.
20503.
Thank you for your consideration in this matter. If your have any questions regarding the examination procedures and requirements, please contact Mr. Rob-ert Keller, Chief, Reactor Projects Section 1C, at (215) 337-5211.
Sincerely, Origina1 Signed 37 ;
Thomas C. Elsasser, Chief Projects Branch, No. 3C Division of Reactor Projects Attachments:
- 1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
- 2. Requirements for Administration of Written Examinations cc w/ enclosures:
H. Aderhold, Reactor Supervisor 1
bec w/ enclosures:
DRP Section Chief Chief Examiner i D. Silk I Heuenfeld, PNL k,
01 File le
/
RI:DR *gtse RI:
/L0 Rt ORP Coe/fi Kel Isasser 0648/86 06/ /86 06/15/86 0FFICIAL RECO D COPY OL 90 CORNELL U - 0002.0.0 06/17/86 1
ATTACHMENT 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1. Existing learning objectives and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermo-dynamics,etc.)
Training materials should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing. The written material should be inclusive of learning objectives and the details presented during lecture, rather than outlines. Training materials should be identified by plant and unit, bound, and indexed. Failure to provide complete properly bound and indexed plant reference material will result in canceling and rescheduling of the examinations. Training materials which include the following should be provided:
System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation.
System training material should draw parallels to the actual procedures used for operating the applicable system.
Complete and operationally useful descriptions of all safety-system interactions and, where available, BOP system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
Training material used to clarify and strengthen understanding of emergency operating procedures.
Comprehensive theory material that includes fundamentals in the area of theory of reactor operation, thermodynamics, heat transfer and fluid flow, as well as specific application to actual in plant com-ponents. For example, mechanical theory material on pumps should include pump theory as well as descriptions of how these principles actually apply to major plant pumps and the systems in which they are installed (i.e., Reactor Coolant Pumps, all ECCS pumps, Recir-culation pumps, Feedwater pumps and Emergency Feedwater pumps).
Reactor Theory material should include descriptions that draw explicit ties between the fundamentals and the actual operating limits followed in the plant (i.e., reactor theory material should contain explanations how principles relate to the actual curves used by operators to verify shutdown margin or calculate an ECP).
l 0FFICIAL RECORD COPY OL 90 CORNELL U - 0004.0.0 1 06/17/86
2 Attachment 1
- 2. Procedure Index (alphabetical by subject)
- 3. All administrative procedures (as applicable to reactor operation or safety)
- 4. All integrated plant procedures (normal or general operating procedures)
- 5. Emergency procedures (emergency instructions, abnormal or special procedures)
- 6. Standing orders (important orders that are safety related and may supersede the regular procedures)
- 7. Fuel-handling and core-loading procedures, (initial core-loading procedure, when appropriate)
- 8. Annunciator procedures (alarm procedures, including set points)
- 9. Radiation protection manual (radiation control manual or procedures)
- 10. Emergency plan implementing procedures
- 11. Technical Specifications
- 12. System operating procedures
- 13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 14. Technical Data Book, and/or Plant curve information as used by operators and facility precautions, limitations, and set points (PLS) for the facility,
- 15. Questions and answers that licensee has prepared (voluntary by licensee)
- 16. The following on the plant reference simulator
- a. List of all readily available initialization points.
- b. List of all preset malfunctions with a clear identification number.
The list should include cause and effect information. Specifically, for each malfunction a concise description of the expected result, or range of results, that will occur upon implementation should be provided. Additionally, an indication of which annunciators are to be initially expected should be given.
- c. A description of simulator failure capabilities for valves, breakers, indicators and alarms.
OFFICIAL RECORD COPY OL 90 CORNELL U - 0005.0.0 06/17/86
l 3 Attachment 1 1
- d. Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction should be provided, i.e.,
ability to vary the size of a given LOCA or steam leak, or the ability to cause a slow failure of a component such as a feed pump, turbine generator or major valve (e.g. drifting shut of a main feed-water control valve.
- e. An indication of modeling conditions / problems that may impact the examination.
- f. Identification of significant differences between the simulator and the control room.
- g. Copies of facility generated scenarios that expose candidates to situations of degraded pressure control (PWR), degraded heat removal capability (PWR and BWR) and containment challenges (BWR) may be provided (voluntary by licensee).
- h. Simulator instructions manual (voluntary by licensee).
- i. Description of the scenarios used for the training class (voluntary by licensee).
- 17. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations.
The above reference material should be approved, final issues and should be so marked. If a plant has not finalized some of the material, the chief examiner shall verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. All procedures and reference material should be bound with appropriate indexes or tables of contents so that they can be used efficiently.
OFFICIAL RECORD COPY OL 90 CORNELL U - 0006.0.0 06/17/86
ATTACHMENT 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1. A single room shall be provided for completing the written examination.
The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangement for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.
l
- 2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with a 3-ft space between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
- 3. Suitable arrangement shall be made by the facility if the candidates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the examiner and/or proctor.
- 4. The facility staff shall be provided a copy of the written examination and answer key after the last candidate has completed and handed in his written examination. The facility staff shall then have five working days to provide formal written comments with supporting documentation on ,
the examination and answer key to the chief examiner or to the regional office section chief.
- 5. The licensee shall provide pads of 8-1/2 by 11 in. lined paper in unopened packages for each candidate's use in completing the examination. The examiner shall distribute these pads to the candidates. All reference material needed to complete the examination shall be furnished by the examiner. Candidates can bring pens, pencils, calculators, or slide rules into the examination room, and no other equipment or reference material shall be allowed.
- 6. Only black ink or dark pencil should be used for writing answers to questions.
i 0FFICIAL RECORD COPY OL 90 CORNELL U - 0007.0.0 06/17/86 5
2 Attachment 2 1
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
- 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
- 2. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
- 3. Use black ink or dark pencil only to facilitate legible reproductions.
- 4. Print your name in the blank provided on the cover sheet of the examination.
- 5. Fill in the date on the cover sheet of the examination (if necessary).
- 6. Use only paper provided for answers.
- 7. Print your name in the upper right-hand corner of the first page of each section of the answer sheet. ,
- 8. Consecutively number each answer sheet, write "End of Category __" as appropriate, start each category on a new page, write only one side of the paper, and write "Last Page" on the last answer sheet.
- 9. Number each answer as to category and number, for example,1.4, 6.3.
- 10. Skip at least three lines between each answer.
- 11. Separate answer sheets from pad and place finished answer sheets face down on your desk or table.
- 12. Use abbreviations only if they are commonly used in facility literature.
- 13. The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.
- 14. Show all calculations, methods, or assumptions used to obtain an answer to mathematical problems whether indicated in the question or not.
- 15. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION AND 00 NOT LEAVE ANY ANSWER BLANK.
- 16. If parts of the examination are not clear as to intent, ask questions of the examiner only.
- 17. You must sign the statement.on the cover sheet that indicates that the work is your own and you have not received or been given assistance in completing the examination. This must be done after the examination has been completed.
0FFICIAL RECORD COPY OL 90 CORNELL U - 0008.0.0 06/17/86
3 Attachment 2
- 18. When you complete your examination, you shall:
- a. Assemble your examination as follows:
(1) Exam questions on top.
(2) Exam aides - figures, tables, etc.
(3) Answer pages including figures which are a part of the answer.
- b. Turn in your copy of the examination and all pages used to answer the examination questions.
- c. Turn in all scrap paper and the balance of the paper that you did not use for answering the questions.
- d. Leave the examination area, as defined by the examiner. If after leaving, you are found in this area while the examination is still in progress, your license may be denied or revoked.
OFFICIAL RECORD COPY OL 90 CORNELL U - 0009.0.0 06/17/86 i