ML20140J265
| ML20140J265 | |
| Person / Time | |
|---|---|
| Site: | 05000157, 05000097 |
| Issue date: | 03/27/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Streett D CORNELL UNIV., ITHACA, NY |
| References | |
| NUDOCS 8604040292 | |
| Download: ML20140J265 (2) | |
Text
I,t Docket Nos.
50-157 50-97 Cornell University
. ATTN:
Dean W. B. Streett College of Engineering 241 Carpenter Hall Ithaca, New York 14853 Gentlemen:
Subject:
Projects Realignment in Region I The purpose of this letter is to. inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace Mr. Ebe C. McCabe as the cognizant Section Chief for your facility.
Mr. Elsasser can be reached on 215-337-5378.
I will retain responsibility as the cognizant Branch Chief.
This realignment will become effective on March 31, 1986.
Sincerely, yW Signed 8E4.
Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:
Dr. D. D. Clark, Director, Ward Laboratory of Nuclear Engineering H. Aderhold, Reactor Supervisor, Ward Laboratory Dr. W. Kiker, Director of Environmental Health Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of New York 8604040292 860 PDR ADOCK O 7
pg P
I 0
1W01
F.
o-7,.
i Cornell University 2
MAR 2 7 W bec:
Region-I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Grant H. Berkow, NRR rid P/
L RI:DRP R
R: RP as Grlint/meo Elrap ef_
We zinger St ro ecki 3/ll/86 3 g7 V
0FFICIAL RECORD COPY