Submits Decommissioning Rept,Per 10CFR50.75(d),including Cost Estimate & Description of Cost Estimate Adjustments
ML20055H512
Person / Time
Site: 05000157, 05000097
Issue date: 07/25/1990
From: Scott N
CORNELL UNIV., ITHACA, NY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9007260307
Download: ML20055H512 (3)


Text

.

O L

.C RNEL E

e 3,f,

v

,N I~V E RS I T Y s.i Office for Research and Advanced Studies Norman K. Scott Telephone: 6W 255-7200 vice Preendent Facsimlic: 607 255-5058 a

'[

314 Dey 11:11 Ithaca, New York 14853 2801 i

i 25 July 1990 U. S. Nuclear Regu'atory Commission

~ Att: Document Control Desk u

. Washington, D.C. 20555 n

Subject:

Submission of Decommissioning Report,10 CFR 50.75(d)

Cornell Triga Reactor, Facility License R-80 Cornell Zero Power Reactor, Facility License R-89 Gentlemen:

-l Cornell University submits th'e enclosed Decommissioning Report for. tlie two reactors owned and operated by Cornell, providing the information required by 10 CFR 50.75(d) in response to-I-

i a) a cost estimate for decommissioning the facility, b) assurance in the form of a ' certification that decommissioning funds will be available, and l

l c) a description of the means of adjusting the cost estimate periodically over the life of the facility.

With regr.rd to item (b) above and pursuant to 10 CFR 50.12, Cornell requests i

an exemption from the list of acceptable methods provided in 10 CFR 50.75(e)(2). In the report we request that Cornell University be exempted from the specific y.

f

' requirements of 10CFR50.75(e) (2) for reasons stated in the report which we believe K

fall within the scope of 10CFR50.12(a) (2) subsections (ii) and (iii).

t 9

1 M

l

?

9007260307 900725 PDR ADOCK 0500o097 l

I PDC

$M u.s. O c

4

g.Gg,yv 7:

A

'-in.,q; t

u;j:

,,~grA-.

--3; r cm.;..

g 1 :,, -

- Page Two.-

~

u t1 We believe the Report fulfills the requirement of 10 CFR 50.75 as applicable to,

t

' the ~ Cornell reactors.

If there are any questions concerning this Report, please;

' contact: Professor David' Clark,- Director of. the Ward Laboratory _of; Nuclear Engineering,10$ Ward Laboratory, Cornell University, Ithaca, New York 14853 (607-i F

s 255-5224h E

, Sincerely, x

J 7

N. R. Scott o.

- Vice President fer Research-i and Advanced Studies -

7 f

xc:1 Professor David ClarE Encs: Decommissioning: Report p.

.y l

7 I

I I'.

1

,9 t-w Ii i,

I 1

r l T L

(,

u

<n,.

n lL ej -4

[jg w t

/.

u;>

6 _ ' ('J.

,l i

1i t1 4

t l

M lt (

a J Pi s

L:N(!j Yik.

O!'

cip 3 7.f i.'

y, u

m I

.Docksts;50-97-cnd 50-157-q., g 1

~

1 4 u;.

DECOMMISSIONING REPORT-H pursuant to 10CFR50.33 (k) (2) and; 50.,75 (d)

_for the Cornell University.TRIGA (bicense R-80) 4

'and Zeir Power (License R-89) - Reactors -

h TheLrequired information consists of a1 cost' estimate'for decommissioning each. facility, a statement of the method by-

.which7 reasonable assurance will be provided that funds lor.

decommissioning will be available when decommissioning occurs, and'a description of the means.for periodically.

[

updating the cost estimate and the required assurance _of availability of funds.

< COST: ESTIMATES.

In renewal application material submitted in September 1980-for Loth reactors estimates were e

-provided for decommissionino costs in-1980. dollars.

The o

estimates were $420,000 for the TRIGA and $147,000 for the c'

.Zero. Power Reactor.

Based on those figures, and allowing for inflation and for increased demolition and removal: costs

-1

-using currently acceptable methods and requirements, we estimate current costs under the DECON method to be

$1,300,000 and-$450,000 respectively.

The DECON method entails removal or decontamination of iocility components and structures to'a level that permits unrestricted use.,

. FINANCIAL ASSURANCE.

Cornell University requests exemption under 10CFR50.12 (a) (2) (ii) and (iii), from the requirements of providing assurance of availability of

' decommissioning funds by any of the three methods of 10CFR50. 75 (e)' (2) ;

i.e.,

pre-payment, an external sinking fund, or.a' guarantee method.

The basis for requesting i

exemption under 10CFR50.12 (a) (2) (ii)- is that Cornell University is a non-profit educational institution chartered in '1855 with 'a,large endowment and a long history of

. financial responsibility, and it is therefore not necessary; to require any of the named methods to achieve the underlying purpose of the rule.

The basis for. requesting

^

exemption under 10CFR50.12 (a) (2) (iii) is that nearly'all of i

the licensees for non-power research reactors similar to Cornell's that are required to submit a report under 10CFR50. 33 (k) (2) are Federal or State. government licensees who by the terms'of 10CFR50.75 (e) (2) (iv) are.not required-to 4

provide assurance by one of the three named methods but may use instead a statement of' intent indicating that funds for decommisc.sning will be obtaineo when necessary.. To require Cornell University to follow one of the three methods would impose costs sigaificantly in excess of those incurred by the L

governmental licensees.

They operate similar facilities in a similar manner for similar purposes.

ADJUSTMENTS OF CORT ESTIHATES AND FUNDING ASSURANCE.

n Cornell University c:ons not foresee decommissioning either reactor before the expiration of the current licenses in 2003.

The University will review the decommissioning plans and' cost estimates at intervals of not more than five years

- (e. g., 1995 and 2000) and will report at those times the

-adjusted estimates and eith4r comply with, or request exemption from, financial assurance requirements current rt the time of reporting.

b --