ML20148B967

From kanterella
Revision as of 07:36, 24 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Negative Declaration Re Proposed Amend 1 to CPPR-117
ML20148B967
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/19/1978
From: Norris J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20148B935 List:
References
NUDOCS 7811010058
Download: ML20148B967 (2)


Text

i O

UNITED STATES NUCLEAR REGULATORY COMMISSION NEGATIVE DECLARATION l REGARDING PROPOSED AMEN 0 MENT TO THE CONSTRUCTION PERMIT FOR CATAWBA NUCLEAR STATION, UNIT 2 e DOCKET NO. 50-414

, c I

The U. S. Nuclear Regulatory Commission (the Comission) is '

s considering the issuance of an amendment to Construction Permit No.

CPPR-il7 issued to Duke Power Company for the Catawba Nuclear Station, >

Unit 2, located in York County, South Carolina. l i

f The amendment would authorize the addition of North Carolina Municipal l Power Agency Number 1 as co-owner of the station with Duke Power Company. i l

TheCommission'sDivisionofSiteSafetyandEnhironmentalAnalysis has prepared an environmental impact appraisal for the proposed amendment and has concluded that an environmental impact statement for this j j \

particular action is not warranted because there will be no environmental impact attributable to the proposed action, h

The environmental impact appraisal is available for public

inspection at the Commission's Public Document Room, 1717 H Street, t

N. W., Washington, D. C., and at the York County Library, 325 South i Oakland Avenue, Rockiiill, South Carolina. A copy may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director,OihisionofSiteSafetyandEnviron-l l ' mental Analysis.

t 1 1 1 781101 cost

2-t 1

Dated at Bethesda, Maryland, this \% day of Oc.h. oh NTon%.

FOR 'THE NUCLEAR REGULATORY COM4ISSI0tl -

\ . b

\

j t

^g Jan A. Norris, Acting Chief

. Environmental Projects Branch 2 2

Division of Site Safety and l Environmental Analysis

.r J

i l

f i

i A

i 3

f i

I o

4 e ed a 'me -

N y 4 -, --- , , .m--,, __ -, _ . _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _