ML20135D221
| ML20135D221 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/31/1996 |
| From: | Mccollum W DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9703050135 | |
| Download: ML20135D221 (3) | |
Text
-.....
.. ~.. - ~
- ll l-1 p.
Dakeltntn Company Wtulw R. McCOLwM, fit Catawba h'udear Generation &partment l' ice President
'43% ConcordRoad (SW)DIJ2!M Office hk, SC29745 (SWJUl4126 Fax DUKEPOWER February 24, 1997 Q U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk l
Washington, DC 20555
Subject:
Catawba Nuclear Station-Docket Nos. 50-413 and 50-414 1996 Annual Report In accordance with Catawba Nuclear Station Technical Specification (TS) 6.9.1.5(a),
find attached the 1996 Catawba Nuclear Station Personnel Monitoring Report.
This attachment provides a tabulation of the number of station, utility, and other personnel, including contractors receiving exposure greater that-100 mrem / year, followed by the-total dose for each respective worker classification and job ' function during. the 1996 calendar year.
j Pursuant TS-6.9.1.5(b) the results of specific activity analysis in which the reactor coolant exceeds the limits as defined in TS 3.4.8 shall be included in the Annual Report.
Catawba did not exceed the specific activity limit during the i
1996 calendar year.
I Sincerely, l
W. R. McCollum, l
KEN /ANNUALRP.96 I
k j
Attachment g
j xc : L. A. Reyes, Regional Administrator i
P. S. Tam, ONRR R. J. Freudenberger, SRI J
j r
9703050135 961231 PDR ADOCK 05000413 R
PDR g
o s
a
/
U. S. Nuclear Regulatory Commission February 24, 1997 Page 2 i
bxc : K. E. Nicholson ELL
- EC050 S. A. Coy
- CNO3RP R. M.
Propst
- CNO3CH L.
E. Loucks
- EC07D J.
R.
Fox
- EC07D Group File:
801.01 Master File: 801.01 I
J i
i l
i i
h i
4 i
a i
n h
m m
.g DUKE PWER CmPANY - CATAMA NUCLEAR STATION TA8ULATION OF NLABER OF PERSEDe4EL AND PER$m-REM SY NORK ANO JOB g
FLNCTItN FOR 1996 e
DATE: 02/04/97 PaJPsER OF PERSONELt >100 MREM)
TtFTAL PERSON-REMt >100 MREM)
NORK AND JOB FUNCTION STATION UTILITY CONTRACT NORKERS STATIN UTILITY CCHTRACT NORKERS EMPLOYEES EMPLOYEES AND OTHERS EMPLOYEES EMPLOYEES AND STPERS
- IN-SERVICE INSPECTION ENGINEERING 0
0 0
0.000 0.000 0.000 HEALTH PHYSICS S
0 11 0.001 0.000 0.052 MAINTENANCE 76 104 55 2.488 5.684 1.723 OPERATING 23 1
3 0.302 0.003 0.222 SUPERVISION O
1 2
0.000 C.162 0.008
- REACTOR OPERS. 8 SURVEILLANCE EM31NEERING 3
6 62 0.013 0.065 1.686 HEALTH PHYSICS 19 1
62 1.845 0.000 3.042 MAINTENANCE 113 341 150 3.690 2.049 6.114 CPERATING 74 1
40 10.8M 0.085 2.355 SUPERVISION 3
2 2
0.099 0.015 0.000
- REFUELING ENGINEERING 1
1 0
0.067 0.000 0.000 HEALTH PNYSICS 2
0 18 0.012 0.000 0.167 MAINTENANCE 32 64 33 0.3S7 1.728 0.074 CPERATING 17 1
20 0.372 0.029 0.449 SUPERVISION 1
0 0
0.000 0.000 0.000
- ROUTINE MAINTENANCE ENGINEERING 3
6 62 0.514 2.43L 43.619 HEALTH PHY'ICS 18 1
62 1.502 0.370 12.245 MAINTENANCE 113 338 ISO 16.632 73.M7 34.301 OPERATING 58 1
45 0.488 0.001 7.782 SUPERVISION 3
2 0
0.187 0.794 0.000
- SPECIAL MAINTENANCE ENGINEERING 3
5 20 0.334 0.307 0.277 i
HEALTH PHYSICS 13 1
49 0.480 0.013 0.642
~
MAINTENANCE 102 292 131 3.062 16.125 2.350 UPERATING 68 1
40 1.265 0.000 1.021 SUPERVISION 3
1 0
0.109 0.000 0.000
- NASTE PROCESSING ENGINEERING O
O 3
0.000 0.000 0.000 HEALTH PHYSICS 12 1
24 0.781 0.000 1.874 MAINTENANCE 8
18 9
0.000 0.000 0.012 CPERATING 7
0 31 0.245 0.000 0.077 SUPERVISION O
O O
0.000 0.000 0.000
- TUTAL ENGINEERING 3
6 62 0.928 2.803 45.582 HEALTH PHYSICS 19 1
62 4.621 0.385 18.022 MAINTENANCE 113 341 150 26.229 99.333 44.574 CPERATING 74 1
45 13.546 0.118 11.906 SUPERVISIm 3
2 2
0.395 0.971 0.008 GRAND TUTAL 212 351 321 45.719 103.610 120.092 i
NOTE: Station Total Dose for 1996 was 302 Person-Rcsn (TLD)