Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie1998-11-16016 November 1998 PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie PNO-I-93-062, on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan1993-11-12012 November 1993 PNO-I-93-062:on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan PNO-I-88-115, on 881101,reactor Scrammed from Full Power Due to Main Turbine Trip.Caused by Loss of Electrical Field on Main Generator.Reactor Stabilized in Shutdown Condition & Entered Into 5-day Outage,Including Deinerting of Drywell1988-11-0202 November 1988 PNO-I-88-115:on 881101,reactor Scrammed from Full Power Due to Main Turbine Trip.Caused by Loss of Electrical Field on Main Generator.Reactor Stabilized in Shutdown Condition & Entered Into 5-day Outage,Including Deinerting of Drywell PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom1988-02-16016 February 1988 PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom PNO-I-87-094, on 871013,explosion & Fire Occurred in Main Transformer Phase a Causing Turbine Generator Trip.Cause of Fire Unknown.Licensee Fire Dept Responded & Automatic Water Deluge Sys initiated.One-wk Outage Anticipated1987-10-13013 October 1987 PNO-I-87-094:on 871013,explosion & Fire Occurred in Main Transformer Phase a Causing Turbine Generator Trip.Cause of Fire Unknown.Licensee Fire Dept Responded & Automatic Water Deluge Sys initiated.One-wk Outage Anticipated PNO-I-87-072, on 870730,reactor Scrammed Due to Low Reactor Vessel Water Level After Power Lost to Reactor Feedwater Control Circuit.Caused by Failed Transfer Circuit to Instrumentation Inverter.Investigation Continuing1987-07-30030 July 1987 PNO-I-87-072:on 870730,reactor Scrammed Due to Low Reactor Vessel Water Level After Power Lost to Reactor Feedwater Control Circuit.Caused by Failed Transfer Circuit to Instrumentation Inverter.Investigation Continuing ML20213G7341986-11-12012 November 1986 PNO-I-DRILL86-1:during Fuel Handling in Spent Fuel Pool to Inspect Fuel Suspected to Contain Failed Fuel,Handling Machine Became Stuck in Upright Position W/Fuel in Machine. Fuel Remained Submerged in Pool PNO-I-86-078, on 860911 & 19,during Loss of Offsite Power (LOP) Testing,Numerous Equipment Failures Identified.Cause Unknown.Licensee to Seek NRC Concurrence Prior to Initiating LOP Testing & Reactor Restart1986-09-24024 September 1986 PNO-I-86-078:on 860911 & 19,during Loss of Offsite Power (LOP) Testing,Numerous Equipment Failures Identified.Cause Unknown.Licensee to Seek NRC Concurrence Prior to Initiating LOP Testing & Reactor Restart PNO-I-86-063, on 860808,licensee Identified Deficiency That Would Prevent Torus Reactor Bldg Vacuum Relief Valves from Fulfilling Safety Function.Control Logic Reversed for Valves Causing Valves to Isolate on Negative Pressure Condition1986-08-0808 August 1986 PNO-I-86-063:on 860808,licensee Identified Deficiency That Would Prevent Torus Reactor Bldg Vacuum Relief Valves from Fulfilling Safety Function.Control Logic Reversed for Valves Causing Valves to Isolate on Negative Pressure Condition PNO-I-86-047, on 860706,alert Declared When Sabotage Suspected as Possible Cause for Initiation of Diesel Generator Bldg Fire Suppression Sys When Water Deluge Valve Opened.Caused by Failed Heat Sensor.Alert Terminated1986-07-0707 July 1986 PNO-I-86-047:on 860706,alert Declared When Sabotage Suspected as Possible Cause for Initiation of Diesel Generator Bldg Fire Suppression Sys When Water Deluge Valve Opened.Caused by Failed Heat Sensor.Alert Terminated PNO-I-86-045, on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage Provided1986-06-30030 June 1986 PNO-I-86-045:on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage Provided ML20198R6161986-06-0505 June 1986 PNS-I-86-007:on 860605,two 35-mm Photographic Film Containers Found in Contractor Employee Lunch Box During Routine Search of Vehicle.One Container Contained Marijuana. Unknown Substance in Pill Form Found in Second Container PNO-I-86-036, on 860502,facility Lost Offsite Power to Vital Buses While Two of Four Emergency Diesel Generators Out of Svc.Caused by Technician Error.Offsite Power Restored & Alert Terminated1986-05-0505 May 1986 PNO-I-86-036:on 860502,facility Lost Offsite Power to Vital Buses While Two of Four Emergency Diesel Generators Out of Svc.Caused by Technician Error.Offsite Power Restored & Alert Terminated PNO-I-86-027, on 860411,NRC Issued License NPF-50,authorizing Operation of Reactor at Max 3,293 Mwt.Fuel Loading Planned for 860412 Delayed Due to Problems W/Two of Four Source Range Monitors.Loading Planned for 8604141986-04-14014 April 1986 PNO-I-86-027:on 860411,NRC Issued License NPF-50,authorizing Operation of Reactor at Max 3,293 Mwt.Fuel Loading Planned for 860412 Delayed Due to Problems W/Two of Four Source Range Monitors.Loading Planned for 860414 ML20136E9191986-01-0202 January 1986 PNS-I-86-001:on 860102,contract Const Security Force Received Bomb Threat from Unidentified Caller.Contingency Plan Implemented.Drywell & Reactor Bldg Searched W/Negative Results.Security Increased Due to Lay Offs of Craft Workers PNO-I-85-064A, on 850904,gas Discharged Into Diesel Generator Through Fire Suppression Sys Nozzles & Drifted to Access Bay for Four Fuel Tank Rooms & Adjacent Areas.Cause Unknown. Investigation Underway1985-09-0505 September 1985 PNO-I-85-064A:on 850904,gas Discharged Into Diesel Generator Through Fire Suppression Sys Nozzles & Drifted to Access Bay for Four Fuel Tank Rooms & Adjacent Areas.Cause Unknown. Investigation Underway PNO-I-85-064, on 850904,carbon Dioxide Fire Protection Sys Initiation Occurred,Causing Discharge of 17 Tons of Liquid Cardox Into Fuel Storage Area.Plant Evacuated & Search & Rescue Stations Established1985-09-0404 September 1985 PNO-I-85-064:on 850904,carbon Dioxide Fire Protection Sys Initiation Occurred,Causing Discharge of 17 Tons of Liquid Cardox Into Fuel Storage Area.Plant Evacuated & Search & Rescue Stations Established PNO-I-85-039, on 850522,several Fires Identified & Extinguished Outside Facility Structure & Inside Industrial Security Area.Caused by Apparent Arson.Investigation Initiated & Security Measures Increased1985-05-23023 May 1985 PNO-I-85-039:on 850522,several Fires Identified & Extinguished Outside Facility Structure & Inside Industrial Security Area.Caused by Apparent Arson.Investigation Initiated & Security Measures Increased ML20207G5361977-12-30030 December 1977 PNO-77-227:on 771230,crane Operator Employed at Hope Creek Construction Site Killed While Assisting in Unloading of Gravel from Barges.Worker Apparently Fell from Pier Into Water.No Witnesses to Accident.Body Recovered from Water 1999-09-16
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000354/19983021999-10-13013 October 1999 Suppl NRC Operator Licensing Exam Rept 50-354/98-302 on 991025-29 (NRC Onsite Review),Mgt Meeting on 990322, in-office Reviews on 990429-30 & 0617-18 & Telephone Call on Appeal Results on 990720 IR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20196D0911998-11-23023 November 1998 Notice of Violation from Insp on 980920-1031.Violation Noted:On 981001,electricians Placed Single Degraded Cell Associated with Operable 1E Battery Bank on Single Cell Charge IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie1998-11-16016 November 1998 PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie ML20154Q7381998-10-16016 October 1998 Second Suppl to NRC Exam Rept 50-354/98-03OL for Tests Administered on 980304-12,0519-21,22-28 & 0629.Five of Five Reactor Operator Applicants & Four of Five Senior Reactor Applicants Passed Exams ML20154J8611998-10-0909 October 1998 Notice of Violation from Insp on 980809-0919.Violation Noted:On 980831,licensee Did Not Promptly Correct Condition Adverse to Quality in That 'C' Residual Heat Removal Pump Rendered Inoperable IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19983011998-09-0404 September 1998 Exam Rept 50-354/98-301OL Conducted on 980810-12.Exam Results:Four SRO Candidates Performed Well on Both Written & Operating Portions of Exam.All Four Were Issued Licenses ML20237E4981998-08-25025 August 1998 Notice of Violation from Insp on 980628-0808.Violation Noted:As of 980810,util Had Not Corrected Known Deficiency in Verifying MSIV Full Closed During Springs Only Full Stroke Closing Tests IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236T1601998-07-21021 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:As of Oct 1997,chemistry Technicians Did Not Sample & Analyze Diesel Fuel Oil Deliveries for Particulates & Did Not Report Results by Written Notification within 14 Days IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980031998-06-16016 June 1998 Suppl to NRC Licensing Exam Rept 50-354/98-03OL (Including Completed & Graded Tests) for Tests Administered on 980223- 0304 IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering ML20249A2031998-06-10010 June 1998 Notice of Violation from Insp on 980223-0319 & 0427-30. Violation Noted:Conditions Adverse to Quality Were Not Promptly Identified & Corrected IR 05000354/19980991998-06-0808 June 1998 SALP Rept 50-354/98-99 for Period of 961110-980516 ML20249A1071998-06-0404 June 1998 Notice of Violation from Insp on 980405-0516.Violation Noted:During Refueling Outage RF03 in Dec 1990 Licensee Did Not Maintain RHR Sys in Operation IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M0491998-04-28028 April 1998 NRC Operator Licensing Exam Rept 50-354/98-03OL,(including Completed & Graded Tests) for Tests Administered on 980223-0304 ML20217N6221998-04-24024 April 1998 Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program ML20217H8051998-04-23023 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Three Examples of Inadequate Accomplishment of Procedure Control Associated W/Temporary Equipment Installed in Plant Svc Water Intake Structure ML20217C6711998-03-20020 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 971112,while Reactor Was in Cold Shutdown W/Rv Head Removed,Operators Did Not Verify That CR Position Did Not Change During Withdrawal ML20217D8291998-03-17017 March 1998 EN-98-013:informs That NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 Will Be Issued on or About 980330 to Pse&G.Civil Penalty Based on Violation Involving Failure by Operating Crew to Follow Procedures IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L4791998-02-0303 February 1998 Notice of Violation from Insp on 971126-980103.Violation Noted:On 971124,maint Technicians Failed to Follow HC.IC-DC.ZZ-0140(Q),Rev 3, Device/Equipment Calibration Masonleilan Pressure & Temperature Controllers ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20199D3171997-11-12012 November 1997 Notice of Violation from Insp on 970824-1004.Violation Noted:On 970914,electric motor-driven Fire Pump Supply Breaker Opened During Electrical Bus Swap Which Rendered Pump Inoperable ML20196J6531997-10-20020 October 1997 Notice of Violation from Insp on 970202 & 0317.Violation Noted:In Apr 1994,licensee Made Changes to Facility That Involved USQ Without Prior Commission Approval ML20198L9531997-10-15015 October 1997 NRC Operator Licensing Exam Rept 50-354/97-08OL for Tests Administered on 970929-1002.Exam Results:Four Candidates Passed All Portions of License Exam.One Candidate Failed Written Exam IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9061997-08-11011 August 1997 Notice of Violation from Insp on 970601-0712.Violation Noted:Inoperable HPCI Sys Injection Valve Was Not Promptly Identified ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20217E7851997-07-25025 July 1997 Investigation Rept 1-96-024 on 970725.No Noncompliance Noted.Major Areas Investigated:Allegations Re Failure to Make 10CFR73.71 Notification by Station Security Dept ML20140J3811997-06-12012 June 1997 Notice of Violation from Insp on 970429-0531.Violation Noted:Failing to Adhere to Established Procedural Guidance for safety-related Activities Were Identified,Significant Condition Adverse to Quality ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20148D2011997-05-23023 May 1997 Notice of Violation from Insp on 970318-0428.Violation Noted:On 970423,operators Failed to Shut Six of Twelve Cylinder Indicator Test Cocks Following Completion of C Emergency Diesel Generator pre-start Checks 1999-09-16
[Table view] |