ML20136G548
From kanterella
ML20136G548 | |
Person / Time | |
---|---|
Site: | Palisades, Big Rock Point, 05000000 |
Issue date: | 08/02/1985 |
From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
Shared Package | |
ML20136G544 | List: |
References | |
PROC-850802, NUDOCS 8508190547 | |
Download: ML20136G548 (128) | |
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18066A6641999-09-30030 September 1999
[Table view]Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML20195D0451999-06-0303 June 1999 Proposed Tech Specs,Revised to Agree with Current Facility Defueled TS Format ML20206N2751999-05-11011 May 1999 Proposed Tech Specs Deleting Figure 5.1-1 Brp Site Map from Defueld TS Subsection 1.16,changing Definition of Site & Other Associated Editorial Changes ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154M5431998-10-14014 October 1998 Proposed Defueled Tech Specs & Bases for Big Rock Plant ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML20238E8141998-08-31031 August 1998 Revised Big Rock Point Defueled Emergency Plan ML20236T6681998-07-21021 July 1998 Proposed Defueled Tech Specs for Big Rock Nuclear Plant ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18066A1841998-06-10010 June 1998 Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. ML20248L5511998-06-0505 June 1998 Draft Proposed Tech Specs Rev,Incorporating Changes Responsive to 980416 RAI ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML20217C3101998-03-24024 March 1998 Palisades,Review of Actual Fluence Determination ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML20217P3811998-02-28028 February 1998 Revised Defueled Emergency Plan ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML20138G2021997-04-30030 April 1997 Proposed Tech Specs,Illustrating Change to Current Facility License DPR-6 ML20138A9131997-04-22022 April 1997 Proposed Tech Specs,Withdrawing Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML20216A9611997-01-0101 January 1997 Rev 13 to Big Rock Point Radiological Effluent T/S Required Documents,Offsite Dose Calculations & Process Control Program ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20134H6411996-11-0707 November 1996 Proposed Tech Specs Re New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 1999-09-30 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20238E8141998-08-31031 August 1998
[Table view]Revised Big Rock Point Defueled Emergency Plan ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML20217P3811998-02-28028 February 1998 Revised Defueled Emergency Plan ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML20216A9611997-01-0101 January 1997 Rev 13 to Big Rock Point Radiological Effluent T/S Required Documents,Offsite Dose Calculations & Process Control Program ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 ML18065A7661996-06-10010 June 1996 Expired Temporary Change O-96-044 to Rev 17 to SOP-17A, Clean Radwaste Sys. ML18065A7651996-06-10010 June 1996 Cancelled Tcn O-96-045 to Rev 17 to SOP-17B, Dirty Radwaste Sys. ML18065A8021996-02-21021 February 1996 Rev 2 to EM-09-13, ISI Pressure Testing Program. ML20137G3631996-02-16016 February 1996 Rev 10 to Offsite Dose Calculation Manual ML20137G3581996-02-15015 February 1996 Rev 6 to CPC Pnp Process Control Program ML20199J7411995-10-0303 October 1995 Rev 6 to Users Guide for Vectora CL-200 Polyethylene High Integrity Containers ML18064A8141995-06-29029 June 1995 Procedure EOF App B, INPO Emergency Response Assistance Agreement, Dtd 950426 ML20100H2621995-06-18018 June 1995 Rev 2 to Reactor Vessel Exam Program Plan Interval 2,Period 3 & Interval 3,Period 1 ML18064A8881995-03-16016 March 1995 Rev 0 to Palisades Nuclear Power Plant Third Interval ISI Program for Class 1,2 & 3 Components & Supports, Vols I & II ML18064A6301995-03-0303 March 1995 Rev 7 to App H, Emergency Planning EOF Training Matrix. ML18064A6341995-02-27027 February 1995 Project Plan,Alloy 600,Palisades Nuclear Plant, Rev 1,dtd 950227 ML20072K7741994-07-15015 July 1994 Rev 0 to Palisades Performance Enhancement Plan ML20072K7641994-07-0606 July 1994 Rev 1 to Palisades Plant Restart Plan from 1994 Forced Outage ML18059B0481994-06-0303 June 1994 Attachment 4 to Procedure EM-09-13,Rev 1, ISI Pressure Testing Program Procedure. ML20069D3081994-05-24024 May 1994 Suitability,Training & Qualification Plan ML20069G2391994-05-20020 May 1994 Rev 30 to Procedure MO-7A-1, Emergency Diesel Generator 1-1 (K-6A) ML20069G2511994-05-20020 May 1994 Rev 30 to Procedure MO-7A-2, Emergency Diesel Generator 1-2 (K-6B) ML20064E4831994-03-0606 March 1994 ASME Section XI Repair Program, 0054-00101-001-100,rev 0 ML20064E5011994-03-0404 March 1994 Procedure for Application & Exam of Weld Overlay Repairs to Austenitic Stainless Steel Piping Systems, 0054-00101-001-101,rev 0 ML18059A6981994-02-23023 February 1994 Reactor Vessel Integrity Project Plan. ML18059A6881994-02-15015 February 1994 Editorial Changes to Rev 6 to Emergency Implementing Procedure EI-6.13, Protective Action Recommendations for Offsite Populations. ML18059B0201993-12-31031 December 1993 Methods of Alleviating Adverse Consequences of Fluctuating Water Levels in Great Lakes - St Lawrence River Basin, Rept to Govts of Canada & Us,Dtd 931231 ML18059A5541993-11-19019 November 1993 Rev 4 to Attachment 3 to Procedure REC-1, Recovery Plan Format. ML18059A4781993-10-27027 October 1993 Rev 5 to Administrative Procedure 9.11, Engineering Analysis. ML20058N6421993-10-11011 October 1993 Rev 16 to Vol of Administrative Procedures,Procedure 3.2.1, Maint Order Processing, Pages 21 & 22 ML18059A4231993-10-0707 October 1993 Rev 0 to Palisades Plant Pressurizer Safe End Crack Repair Action Plan. ML20059A5181993-09-30030 September 1993 Public Version of Rev 36 to General Ofc Emergency Planning Procedure,App G, Emergency Telephone Numbers. W/931019 Release Memo ML20058N6401993-07-15015 July 1993 Rev 20 to Procedure T7-28, Emergency Diesel Generator Auto Test Start ML20058N6331993-07-15015 July 1993 Rev 142 to Vol 3 of Operating Procedure - Sys SOP-14, Substation ML20127N4321993-01-11011 January 1993 Third Interval ISI Program ML18058B7871992-12-15015 December 1992 Rev 3 to HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18058B0341992-05-11011 May 1992 Rev 6 to Odcm. ML18058A4331992-05-0707 May 1992 Rev 5 to General Ofc Emergency Planning Procedure EOF-4, Communication Support Team, Page 3,reflecting Editorial Changes ML20141M5531992-03-10010 March 1992 Rev 8 to Vol 25 to Procedure Big Rock Point Radiological Effluent TS Required Documents,Offsite Dose Calculations & Process Control Program ML20090A3401992-02-27027 February 1992 Rev 5 to ODCM ML18058A1461992-01-27027 January 1992 Rev 45 to General Office Emergency Planning Gort/Eof Procedures Index 1998-08-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20136G548&oldid=2837139"