Proposed Tech Specs Re New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys
ML20134H641
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/07/1996
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20134H630 List:
References
NUDOCS 9611140199
Download: ML20134H641 (4)


Text

- -

4 e

(

1 A

T 5

i 4

4 ATTACHNENT 1 CONSUNERS POWER CONPANY BIG ROCK POINT PLANT i

DOCKET 50-155 As Proposed

~

Submitted November 7, 1996 1

i 1j i

i 9611140199 961107 PDR ADOCK 05000155 P

PDR 1 Page

{

4.2.6,(Contd)

^

Containment Sphere Post-Incident Spray System, and Backup Service Water System to the Containment Sphere.

j One electric fire pump and one diesel. fire pump, each rated at

'.1000.gpm, 254-foot head, shall be provided.

{

_4.2.7 Ventilation System l

I l

Ventilation shall be provided through two full-capacity fans, each rated at 30,000 cfm, located in the ventilation stack. Ventilation air i

to and from the containment sphere shall be via equipment located

)

within the ventilating _ room. - This room is located outside the containment

. sphere and shall.contain the isolation valves, air heating equipment, filters and necessary controls. The filters'shall ~ be provided for cleaning inlet air.

Flow of air shall be.from areas of lowest contamination probability toward areas of highest contamination probability, and then out the stack.

~ 4.2.8 Reactor Service Water System i

Cooling of the reactor cooling water system shall be agcomplished by two full size heat.exchangers, each rated at 9 x 10 Btu /h, supplied with service water from Lake Michigan via the service water pumps.

4.2.9 Service and Instrument Air System

/

Service and Instrument air shall be supplied by three, nonlubricated

/

j air compressors, each rated at 70 scfm and one, nonlubricated air

/

compressor rated at 100 scfm. Instrument air shall also pass -

/

through a dryer.

/

4.2.10 Turbine Generator Unit

' The turbine shall be 3600 rpm, tandem-compound, double-flow, condensing unit directly connected to a hydrogen-cooled generator.

The turbine generator unit, including its controls and auxiliaries, shall be designed for operation on saturated steam.

The _ initial rating of the turbine shall be 54,500.kw at 1000 psig, saturated, and 3.5 inches Hg. absolute exhaust pressure. The gen-erator initially shall be rated at 70,588 kva with a 0.85 power factor and 30 psig hydrogen pressure.

The_ turbine shall normally be operated on the initial pressure regulator, which permits the turbine to follow the output of the reactor. During turbine start-up and shutdown, and for short periods of time during normal operation, operation on speed control shall be' permitted. During such operation, the turbine load limiter shall be set to limit turbine output to correspond to the planned reactor output.

27 As Proposed l

.i

....~

_ _ =

l

\\

l i

t i

i l

i l

ATTACHNENT 2 CONSUNERS POWER CONPANY j

BIG ROCK POINT PLANT l

DOCKET 50-155 i

CURRENT-TECHNICAL SPECIFICATION PAGE MARKED UP TO ILLUSTRATE CHANGE l

Submitted November 7, 1996 i

l l

l l

l t

a i

1 Page i

i

i-i 4.2.6 (Cbntd)

Containment Sphere Post-Incident Spray System, and 1

a j

Backup Service Water System to the Containment Sphere.

One electric fire pump and one diesel fire pump, each rated at

]

1000 gpm, 254-foot head, shall be provided.

4.2.7 Ventilation System l

Ventilation shall be provided through two full-capacity fans, each rated at 30,000 cfm, located in the ventilation stack. Ventilation air i.

to.and from the containment sphere shall be via equipment located within the ventilating room. This room is located outside the containment sphere and shall contain the isolation. valves, air heating

/

equipment, filters and necessary controls.

The filters shall be provided for cleaning inlet air. Flow of air shall be from areas of lowest contamination probability toward areas of highest contamination probability, and then out the stack.

4.2.8 Reactor Service Water System I

)

l Cooling of the reactor cooling water system shall be agcomplished by two full size heat exchangers, each rated at.9 x 10 Btu /h, supplied with service water from Lake Michigan via.the service water pumps.

i Scs.vsec wswec a I

j 4~2.9 Iratre;c.t and S rvi:0 Air System 1

Segwe c

_msw ecuT Ir.:trun::t and-::rvic: air shall be supplied by three, nonlubricated

[

air compressors, each rated at 70 scfm. Instrument air shall also pass i

i through a dryer.

4 wD onc, ueslobicatecl air comecessa j.

4.2.10 Turbine Generator Unit c46 ci at too seb.

.The turbine shall be 3600 rpm, tandem-compound, double-flow, i

condensing unit directly connected to a hydrogen-cooled generator.

1 The turbine generator unit, including its controls and auxiliaries, j

shall be designed for operation on saturated steam.

i The initial rating'of the turbine shall be 54,500 kw at 1000 psig, saturated, and 3.5 inches Hg absolute exhaust pressure.

The gen-erator initially shall be rated at 70,588 kva with a 0.85 power factor and 30 psig hydrogen pressure.

j Tha turbine shall normally be operated on the initial pressure reguletor, which permits the turbine to follow the output of the a

i reactor. During turbine. start-up and shutdown, and for short periods of time during normal operation, operation on speed control shall

.i be permitted. During such operation, the turbine load limiter shall be

[

set to limit turbine output to correspond to the planned reactor output.