ML20136H082

From kanterella
Revision as of 21:41, 18 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Intervenor Exhibit I-31,consisting of marked-up Pages 70,71, 93 & 94 to Transcript of Tg Broughton 841005 Deposition in Harrisburg,Pa Re Reporting of TMI-2 Event Info to NRC
ML20136H082
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/13/1984
From: Broughton T
AFFILIATION NOT ASSIGNED
To:
References
SP-I-031, SP-I-31, NUDOCS 8508200147
Download: ML20136H082 (6)


Text

-

  • N

'(D AUG -/ P.3 :01 t UNITED STATES OF A!1 ERICA UR" ~'t-2(- I NUCLEAR REGULATORY COMIiISSION I'"

2 IN THE MATTER OF  :

3 IIETROPOLITAN EDISON COMPANY  :

DOCI;ET NO. 50-289 SP 1 (THREE MILE ISLAND NUCLEAR  :

STATION, UNIT NO. 1)  : (RESTART-MANAGE!!ENT REMAND) 5 6

7 8 DEPOSITION OF: T. GARY BROUGl! TON 9 TAKEN BY: TIII ALERT 10 BEFORE: DIANE F. FOLTZ, RPR NOTARY PUBLIC 11 DATE: OCTOBER 5, 1984, 9:35 li.M.

U PLACE: l FRIENDS' MEETING PLACE .

13 SIXTH & HERR STREETS HARRISBURG, PEMNSYLVANIA l C 11 15 APPEARANCES:

Ifi I LYNNE BERNABEI, ESOUIRE I 17 l

FOR - TMI ALERT .

18 i

S!!AW, PITTMAN, POTTS & TROWBRIDGE i 19 BY: ERNEST L. BLAKE, JR. , ESOUIPfustaas assutatear seeisstesses  ! -

20 FOR - LICENSEE 8edet N eensisi sah h le the metter of I M 'N 21 LOIS R. FINKELSTEIII, ESOUIRE lloff angNTWis0 / ' 1 i

22 FOR - NRC STAFF Applie*e8 aseslyan V l latervoser V ma=atua  !

23 seerg err '

21 es.oreas.1

. e, -

edV/2-21/ .

wr -  :

25 asser+., 1 4/  !

N I

(' - GEIGER & LORIA REPORTING SERVICE. INC.. 1000 M ARKET ST..HBG. PA 17909 H8G. 234 2109 PA 1800 222 GLR 5 -

l i

8508200147 841213 i PDR ADOCK 05000289 l 0 PDR 1

70 1 rrect?

2 A It looks like it says 3/29/79 question mark and belou 3 it 3/30.

4 0 Chay. Thor 's an underlining between TCD called 5 3/29 and the 3/30; is that rect?

6 A That's correct.  !

7 Q l'ou, having reviewed that, can lo indicate whether 8 you're familiar with any of the information the hich follous? i 9 I:R. BLAKE: Could you repeat that? .

10 2; :r. 7:r _rr:-

11 0 Yes. I uill rephrase the question. I.ro you fa-iliar 12 vith any of the information which follows the nctation 3/29/79 13 or 3/307 Do you understand chec the notes arc indicating?

14 A There's quito a bit of this information that seems -

15 familiar and the type of information that I would have known f 16 from 3/29 or 3/30, for examplo, a Sonator's briefing, but I 17 don't remember if that was on the 29th or 30th.

18 0 I represent to you that was on 3/29.

j 19 A All right.

20 0 You have revicued the rest of it. I'm going to ask you 21 if any of that infomation, to your knowledge, was information 22 that you transmitted to Mr. Keaton starting uith ::crch 29th?

23 A Ucll, I don't recall in detail Uhat we talked about,

~

24 but it would have been this type of information, and I would 25 have been bringing him up to date on uhat uc had learned. I

(%

- GElGER & LORIA REPORTING SERVICE. lNC., 1000 M ARKET ST H8G. PA 17101 HBG 234 2109 PA l 800 222 GLRS -

c. .

71

? u

, = I l

don't see anything in here that looks inconsistent tiith what l

2 I thought I knew at that time, and that includes all the way 3

down through the entries to 7:00 to 8:00 p.m. which talks about i 4

I starting pumps. -

0 Q That uould be the first two pages of what I have l i 6

handed you, is that correct, the first tuo pages after 3/29?

7 That's correct.

11 It's the page that has the date on it i

! 8 and the page that follous it.

4 9 Q There again, I'm trying to get your best information or 10 comory on what you gave hin on I* arch 29th.

11 Is night . 1 ou, if ue go to the no::t page uhore it talks 12 about present status, there arc things in that entry t'hich I do 13 not recognize as having understood on 3/29.

14 7 7,e ..h:t are thecc thingc?

l 15

\ .

e For example, there 's a discussion here about an l 16 explosion ' the containment, some specific numbers about what f

17 looks to be the olume of non-condensibles in the primary. I 18 don't believe that t e were any calculations which had been 19 made early on 3/29 uhich w id have had this information in it.

20 I think the first calculations n 'c like that were en the '

21 morning of the 30th. So I'm not sure xactly where the 3/29 l 22 information stops.and uhcre the 3/30 info ..m* ion starts.

23 Q And there is no apparent stopping point the notes; 31 is that f air to say?

25 n prer ..g2t I gee here there n nethin; cryict,- th2t e

s

-t

- CEICER & LORIA REPORTING SERVICE. INC., 1000 M ARKET ST..H8G. PA 17101 H8G. 234 2109 PA 1000 222 GLR 5 -

93 I

t I,  !*S . BEPl??EEI: It in te the extent !*r. Diechnnp--

2 I*n. BLAI*E: I think you must have some other purpose 3 in min as to such a question, and I regard it as inappropriate..

4 *

.S. BERITABEI: Let me state our position on the record.!

5 This does ha to do with the analysis being done of the t 6

accident on IIar 5 28th and the information that was communicated 7 to management and tside the site generally. It also has to 8

l

\

do eith evaluation of he information that can available.

! 9 I:P . BLAKE: The ,uestion, as I recall it, was a 1

10 hypothetical about reporting to the NRC--

l l 11 r.*S . Benz:ABEI: That's rrect.

12 I:R. DIAKE: --which the r ord will reflect. I can't 13 square that uith the stated purpose.

1

.( '

14 MS. BEnUABEI: It has to do wi an evaluation of the i

l 15 seriousness of the accident and what uas rep rted to management.,

i 16 MR. BLAKE: The question did not have o do uith l 4

17 management.

18 gS. BEPl!ABCI: I'm not going to argue uith y , I*r .

19 Blake.

l 20 MR. BLAKE: It had to do with the U?.C.

j 21 -07 :*: , ;;r;;,,,nr ;

22 That's right.

j O In your analysis if you had determined 23 that your analycis of the information you roccived indicated l

i l

i 24 core denage, that is, talking about core damage greator than 25 you had previously believed, would that be the type of informatica

- GEIGER 4 LORIA REPORTING SERVICE. INC.. 1000 MARKET ST.. HOG. PA 17101 H5G. 234 2109 PA 1000 222 CLR$ -

l l

i

' 9_4_

( 1 you would report to the Unc?

2 A I would not have done that directly, j 3 Q lion would you have done that, sir?

4 A I again uould have reported it I guess on the 28th or 5 early on the 29th through 11r. Keaton, and then when ::r. Wilson 6 came out with a more formal organization to deal eith this, I 7 believe he was the proper contact then.

! 8

_7 g ,c ,c; .culdn't n.2fe' cent:cte9 tbn r"r eirectly e

's I 9 NA Mo.

N -

10 IIR. BLAKE: Are you noting mv standine objection to i 11 this line ,'qiss Sernabei?

U MS. hERNAEEI: Yes. There is no line. Teo questions.

13 BY RS. BER:ABEI: i 14 Q Mou, do you h ou uhen repressurizaticn of the reactor i i

15 began on March 28th?

16 A I'm not sure in uha contcy.t you're using repre.tauri-17 zation. There were times uhen p ssure was adjusted upward and 18 donnuard during the day.

19 0 I'm talking in the sense that cro's been a general 20 description of the strategics employed to b ng the reactor to 21 a stable condition during the day, and there ha been testimony 22 generally that at-a certain point in the early morn .g there U was a repressurization, an attempt to repressurize. Th're was l 21 then an attempt to depressurize, to get on a decoy heat re val 25 systn- and then in tha n"*a"-nan n* "^'^ ""'-' *bern "'" '"

~

- GEIGER 8 LORIA REPORTING SERVICE. INC.. 1000 M ARKET ST.. HBG. PA 17101 NBG. 234 2109 PA 1800 222 GLRS -

-r UNITED STATES OF AMERICA NUCLEAR REGULATORY C0bNISSION In the Matter of )

)

MElROPOLITAN EDISON COMPANY ) Docket No. 50-289sP

) (Restart - Remand on Mgt)

(Three Mile Island Nuclear )

Station, Unit No. 1) )

I have read the transcript of my deposition taken on October 5, 1984 in connection with the captioned matter and, subject to the corrections listed on the attached forms; state that the transcript is true and correct.

^% ~-l hSm T. Gary Broughton ,

l

./

Subscribed"and Sworn to before me this ai day of et- h s # r- , 1984 Ai d kwb Notary Public cApot J. scHtNSKI Notary Puthe Of New J?rsey My cown- s.- 2: set a wr My Commission Expires:

0788u

J

, r*

  • UNITED STATES OF AMERICA NUCLEAR REGULATORY C0ft11SSION In the Matter of )

)

MEIROPOLITAN EDISON COMPANY )

) Docket No.50-289SP (Three Mile Island Nuclear ) (Restart - Remand on Mgt.)

Station, Unit No. 1) )

'IRANSCRIFT CORRECTIONS Correction to transcript of deposition of T. Gary Broughton taken October 5,1984 Page Line(s) Change To Read

$ um . le.s

)

- "d,%m.m -

I t . - . .

/ 7 -%3 A,,u ., M es T. Gary Broughton e Subscribed and Sworn to before me this 31 day of Mcise , 1984 Notary Public CAROL J. SCHINSKI Notary Public of New Jef99V My commission ep res sect. 29. terr My Commission Expires:

b h$

" - , , _ - - , _ . - .