Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20196G4021999-06-18018 June 1999 Comment on FRN Re Rev of NRC Enforcement Policy NUREG-1600, Rev 1 & Amend of 10CFR55.49.Concurs with Need to Provide Examples That May Be Used as Guidance in Determining Appropriate Severity Level for Violations as Listed ML20206H1881999-05-0606 May 1999 Exemption from Requirements of 10CFR50,App K Re ECCS Evaluation Models. Commission Grants Licensee Exemption ML20206M5111999-04-30030 April 1999 Comment Supporting Draft RG DG-1083 Re Content of UFSAR IAW 10CFR50.71(e). Recommends That Listed Approach Be Adopted for Changes to Documents Incorporated by Ref CY-99-007, Comment Supporting Proposed Changes to Improve Insp & Assessment Processes for Overseeing Commercial Nuclear Industry That Were Published in Fr on 990122 & in SECY-99-0071999-02-22022 February 1999 Comment Supporting Proposed Changes to Improve Insp & Assessment Processes for Overseeing Commercial Nuclear Industry That Were Published in Fr on 990122 & in SECY-99-007 TXX-9825, Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps1998-12-14014 December 1998 Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps ML20154C4101998-09-30030 September 1998 Comment Re Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors.Comanche Peak Electric Station Endorses NEI Comment Ltr & Agrees with NEI Recommendations & Rationale ML20216E1051998-04-0707 April 1998 Comment Supporting Draft RG DG-1029 Titled Guidelines for Evaluating Electromagnetic & Radio-Frequency Interference in Safety-related Instrumentation & Control Sys ML20217H3611998-03-26026 March 1998 Comment Opposing Draft GL 97-XX, Lab Testing of Nuclear Grade Charcoal, Issued on 980225.Advises That There Will Be Addl Implementation Costs ML20198Q4851998-01-16016 January 1998 Comment Opposing PRM 50-63A by P Crane That Requests NRC Amend Regulations Re Emergency Planning to Require Consideration of Sheltering,Evacuation & Prophylactic Use of Potassium Iodide for General Public ML20211A4871997-09-12012 September 1997 Changes Submittal Date of Response to NRC RAI Re Proposed CPSES risk-informed Inservice Testing Program & Comments on NRC Draft PRA Documents ML20149L0311997-07-21021 July 1997 Comment on Draft Guides DG-1048,DG-1049 & DG-1050.Error Identified in Last Line of DG-1050,item 1.3 of Section Value/Impact Statement.Rev 30 Should Be Rev 11 ML20140A4871997-05-27027 May 1997 Comment Opposing Proposed Rule Re Safety Conscious Work Environ.Util Agrees W/Nuclear Energy Inst Comment Ltr ML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20135B7881996-11-29029 November 1996 Order Approving Corporate Restructuring of TU to Facilitate Acquistion of Enserch Corp ML20128M8011996-10-0303 October 1996 Comment Opposing Proposed NRC Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20097D7321996-02-0909 February 1996 Comment Opposing Petition for Rulemaking PRM-50-63 Re CPSES Request for Amend to Its Regulations Dealing W/Emergency Planning to Include Requirement That Emergency Planning Protective Actions for General Public Include Listed Info ML20094Q6421995-11-28028 November 1995 Comment Supporting Petition for RM PRM-50-62 Re Amend to Regulation Re QAPs Permitting NPP Licensees to Change Quality Program Described in SAR W/O NRC Prior Approval If Changes Do Not Potentially Degrade Safety or Change TSs ML20094H4801995-11-0808 November 1995 Comment Supporting Nuclear Energy Inst Comments on Proposed Rules 10CFR60,72,73 & 75 Re Safeguards for Spent Nuclear Fuel or high-level Radwaste ML20091M6441995-08-25025 August 1995 Comment Opposing Proposed Rule Re Review of Revised NRC SALP Program.Believes That NRC Should Reconsider Need for Ipap or SALP in Light of Redundancy ML20086M7921995-07-0707 July 1995 Comment Supporting Proposed GL Process for Changes to Security Plan Without Prior NRC Approval ML20084A0181995-05-19019 May 1995 Comment Suporting Proposed Rule 10CFR50 Re Containment Leakage Testing.Supports NEI Comments ML20077M7311994-12-30030 December 1994 Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operations for Nuclear Power Reactors ML20077L8711994-12-22022 December 1994 Comment Supporting Proposed Rule 10CFR50,55 & 73 Re Reduction of Reporting Requirements Imposed on NRC Licensees ML20073B6731994-09-19019 September 1994 Affidavit of Cl Terry Re License Amend Request 94-015 ML20073B6951994-09-19019 September 1994 Affidavit of Cl Terry Authorizing Signing & Filing W/Nrc OL Amend Request 94-016 ML20058E0561993-11-10010 November 1993 Comment on Proposed Rule Re Staff Meetings Open to Public. Believes That NRC Has Done Well in Commitment to Provide Public W/Fullest Practical Access to Its Activities ML20056G3351993-08-27027 August 1993 Comment Opposing Proposed Rule 10CFR2 Re Review of 10CFR2.206 Process ML20045D8321993-06-11011 June 1993 Comment Supporting Proposed Rules 10CFR50 & 54, FSAR Update Submittals. ML20044F3271993-05-21021 May 1993 Comments on Draft NRC Insp Procedure 38703, Commercial Grade Procurement Insp, Fr Vol 58,Number 52.NRC Should Use EPRI Definitions for Critical Characteristics ML20056C0831993-03-19019 March 1993 Texas Utils Electric Co Response to Petitioners Motion to Stay Issuance of Full Power License.* Licensee Urges NRC to Reject Petitioners Motion & to Deny Petitioners Appeal of 921215 Order.Motion Should Be Denied.W/Certificate of Svc ML20056C1881993-03-17017 March 1993 Order.* Directs Util to Respond to Motion by COB 930319 & NRC to Respond by COB 930322.W/Certificate of Svc.Served on 930317 ML20128D9651993-02-0303 February 1993 Memorandum & Order.* Stay Request Filed by Petitioners Denied.W/Certificate of Svc.Served on 930203 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20128D3391993-02-0202 February 1993 Emergency Motion to Stay Issuance of low-power Ol.* Petitioners Specific Requests Listed.W/Certificate of Svc ML20128D4651993-02-0202 February 1993 Texas Utils Electric Co Response to Emergency Motion to Stay Issuance of low-power Ol.* Petitioner Request Should Be Denied Based on Failure to Meet Heavy Burden Imposed on Party.W/Certificate of Svc ML20128D3461993-01-29029 January 1993 NRC Staff Notification of Issuance of OL for Facility.* Low Power License May Be Issued by 930201.W/Certificate of Svc ML20128D6321993-01-29029 January 1993 Memorandum & Order.* Denies Citizens for Fair Util Regulation for Fr Notice Hearing on Proposed Issuance of OL for Facility.W/Certificate of Svc.Served on 930129 ML20127L9321993-01-26026 January 1993 Affidavit of Re Architzel Re Thermo-Lag Installation at Testing for Unit 2.* Statement of Prof Qualifications Encl ML20128D6111993-01-26026 January 1993 Joint Affidavit of I Barnes & Ft Grubelich Re Borg-Warner Check Valves.* Discusses Issues Re Borg-Warner Check Valves Raised by Cfur & Adequacy of Actions Taken by TU Electric ML20127L9181993-01-26026 January 1993 NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.* Cfur Request That Notice Re Licensing of Unit 2 Be Published Permitting Parties to Request Hearings Should Be Denied ML20127L9661993-01-26026 January 1993 Affidavit of Rl Pettis Re Borg-Warner Check Valves.* Statement of Prof Qualifications & Certificate of Svc Encl ML20127L9091993-01-25025 January 1993 Tx Util Electric Response to Citizens for Fair Util Regulation Request of 930113.* Request Fails to Raise Worthy Issue & Should Be Denied.W/Certificate of Svc ML20127L8891993-01-21021 January 1993 Order.* License Should File Response to Citizens for Fair Util Regulation Ltr Requesting That Commission Issue Fr Notice Providing for Opportunity for Hearing Re Issuance of OL by 930125.W/Certificate of Svc.Served on 930122 ML20127G9191993-01-19019 January 1993 Order.* Grants Petitioners Extension of Time Until 930122 to File Brief.Replies to Petitioners Brief Shall Be Filed on or Before 930208.W/Certificate of Svc.Served on 930119 ML20127G9441993-01-19019 January 1993 TU Electric Brief in Opposition to Petitioners Appeal of ASLB Memorandum & Order.* Requests That Petitioners Appeal Be Denied & Licensing Board 921215 Memorandum & Order Be Affirmed.W/Certificate of Svc ML20127G8041993-01-15015 January 1993 NRC Staff Response to Appeal of Licensing Board Decision Denying Petition for Leave to Intervene & Request for Hearing Filed by Bi & Di Orr.* Board 921215 Decision Should Be Upheld.Certificate of Svc Encl ML20127G7451993-01-14014 January 1993 NRC Staff Response to Motion of Petitioners RM Dow & SL Dow, (Disposable Workers of Comanche Peak Steam Electric Station),For Leave to File Out of Time & Request for Extension of Time to File Brief.* W/Certificate of Svc ML20127G7941993-01-12012 January 1993 Opposition of TU Electric to Motion for Leave to File Out of Time & Request for Extension of Time to File Brief by SL Dow (Disposable Workers of Comanche Peak Steam Electric Station) & RM Dow.* W/Certificate of Svc ML20127A5931993-01-0808 January 1993 Brief in Support of Petitioner Notice of Appeal.Aslb Erred by Not Admitting Petitioner Contention & Action Should Be Reversed.W/Certificate of Svc ML20127A6371993-01-0707 January 1993 Notice of Appeal.* Appeal Submitted Due to 921215 Memo Denying Petitioner Motion for Rehearing & Petition for Intervention & Request for Hearings.Proceedings Were Terminated by Aslb.W/Certificate of Svc 1999-06-18
[Table view] Category:TRANSCRIPTS
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20237L6161986-07-17017 July 1986 Transcript of Ef Fox 860717 Investigative Interview in Bethesda,Md Re Insp at Plant.Pp 1-16 ML20237L4091986-07-17017 July 1986 Transcript of J Gilray 860717 Investigative Interview in Bethesda,Md Re Conversations W/Westerman Re Plant.Pp 1-9 ML20238A5421986-07-11011 July 1986 Transcript of T Westerman 860711 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 257-411.Partially Deleted Supporting Documentation Encl ML20238A5311986-07-10010 July 1986 Transcript of T Westerman 860710 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 1-254 ML20238A0331986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1241986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1101986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A2961986-06-26026 June 1986 Transcript of Mk Graham 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-10 ML20238A3221986-06-26026 June 1986 Transcript of Jl Birmingham Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-29 ML20238A1731986-06-26026 June 1986 Transcript of Dl Jew Investigative Interview in Grandbury, Tx Re Region IV Regulation of Plant.Pp 1-14.Related Info Encl ML20238A2511986-06-26026 June 1986 Transcript of Jr Dale 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-25 ML20238A1961986-06-26026 June 1986 Transcript of AL Maughan 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-15. Related Info Encl 1996-12-05
[Table view] Category:DEPOSITIONS
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20237L6161986-07-17017 July 1986 Transcript of Ef Fox 860717 Investigative Interview in Bethesda,Md Re Insp at Plant.Pp 1-16 ML20237L4091986-07-17017 July 1986 Transcript of J Gilray 860717 Investigative Interview in Bethesda,Md Re Conversations W/Westerman Re Plant.Pp 1-9 ML20238A5421986-07-11011 July 1986 Transcript of T Westerman 860711 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 257-411.Partially Deleted Supporting Documentation Encl ML20238A5311986-07-10010 July 1986 Transcript of T Westerman 860710 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 1-254 ML20238A0331986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1241986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1101986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A2961986-06-26026 June 1986 Transcript of Mk Graham 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-10 ML20238A3221986-06-26026 June 1986 Transcript of Jl Birmingham Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-29 ML20238A1731986-06-26026 June 1986 Transcript of Dl Jew Investigative Interview in Grandbury, Tx Re Region IV Regulation of Plant.Pp 1-14.Related Info Encl ML20238A2511986-06-26026 June 1986 Transcript of Jr Dale 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-25 ML20238A1961986-06-26026 June 1986 Transcript of AL Maughan 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-15. Related Info Encl 1996-12-05
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20237L6161986-07-17017 July 1986 Transcript of Ef Fox 860717 Investigative Interview in Bethesda,Md Re Insp at Plant.Pp 1-16 ML20237L4091986-07-17017 July 1986 Transcript of J Gilray 860717 Investigative Interview in Bethesda,Md Re Conversations W/Westerman Re Plant.Pp 1-9 ML20238A5421986-07-11011 July 1986 Transcript of T Westerman 860711 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 257-411.Partially Deleted Supporting Documentation Encl ML20238A5311986-07-10010 July 1986 Transcript of T Westerman 860710 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 1-254 ML20238A0331986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1241986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1101986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A2961986-06-26026 June 1986 Transcript of Mk Graham 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-10 ML20238A3221986-06-26026 June 1986 Transcript of Jl Birmingham Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-29 ML20238A1731986-06-26026 June 1986 Transcript of Dl Jew Investigative Interview in Grandbury, Tx Re Region IV Regulation of Plant.Pp 1-14.Related Info Encl ML20238A2511986-06-26026 June 1986 Transcript of Jr Dale 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-25 ML20238A1961986-06-26026 June 1986 Transcript of AL Maughan 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-15. Related Info Encl 1996-12-05
[Table view] |
Text
._ .- . - _ . - - .
. ,- f- _- .@
.' g -
(
I
, (
r .
g 1 (The following statement _was submitted in
, 2 written form by ) F l "%%
~
l 5 g 8 " Prior to incarceration, I was working at the i D .I o
c 9 Comanche Peak nuclear power plant construction s i te
10 under the name of f[-
[
j= 12
_M "I was arrested at the si te on 1
13 The very fact that a fugitive could obtain employr '
h . I4 at the-site caused questions to be asked about their
% E 15 security measures, especially when it was learned that ;
16 w
a my job gave me access to all areas of the cons truction I7 job, even the most confidential.
h.
C 18 "I can personally attest to and will be E i 19
{ supported by documented records of several faults in .
7 20
, the electrical phase of construction at Comanche Peak 1
as of i 22
- "Having been employed as a journeyman i 23 d
g electrician by Brown & Root, Inc. during the latter part 24 of 1979 until at Comanche Peak, I l g- worked in the e le c t ri, cal ' termination crewdoing the P
8601170219 851213 3.LDERSON REPORTING COMPANY. INC.
PDR FOIA ' ^'
GARDE 85-59 PDR -
.- - 'C "e .
. - = ~
== e- e'~~~~~ ' ~~ ~ ~ ' '~2'^' ' Y"'L -
7 Y*
a ., . 3y 1 actual phsyical termination of the wiring and later on l
l 2 the ' checkout crew.' i
. 4
[ 3 "This latter crew checks the wiring done 4 by the termination crew as to accuracy and proper
. 5 termination technique.
X.
j e
6 "I was required to turn in a written and G
g 7 signed report on each cable checked by me. Some, if 8 not all of these faults can be verified and located a
a 9 through these reports.
i l
.h 10 "These faults include improper lug sizing 5 l ,~'
5 11 a nd a ct. u_.a. ]. _ phys i ca. .l. . al te r at. i_on.. o f lug s , splicing of ca b;
- s ,2 7 . g d 12 patching of dam. aged cables, improper pin setting on j - ~ _ . _ - - .. ..
[ l : 13 ' c. ano n ' type plu.gs, - faulty grounding, wiring not proper 1.
y : - . . . - - . . . . .._ _. ,.
- 'g 7 C' I -
F 14 p r o t.e.c t e d fr_o.m... a.b..r a s i o n , wire t. ens. ion too high, and
. _ i - ..
g {= 15 improper protection of cables during thermal welding.
3 .
)s. 16
" Lugs are a wiring device that attach.to f I7 the ends of wires or cab le s as an aid to termination 18 and.come in a' variety of styles and sizes. The ' ring I9
{ ~ type' used at Comanche Peak has a hole in its tongue 20 to accept screws from terminal blocks.
21 "These holes can be of varying size d e p'e n d e n -
22 upon what diameter or stud size screw the terminal block 23 .
is engineered for.
c.
' ' 24. I l " A s tud size sii is smaller in diameter in i
J 25 lIboth the threaded portion and th.e head of-the screw ,
- 1
- 2. -
x .
ALD' SON REPORTING COMPANY. INC. ~j
\ '{ a
- p ;. *m . : p. . .: . ..;r .:
l k [.
, , ,,,,.,g.....,.....-smi.....-... m...~~.-,..........r........w.g.s.... .--,s-.-~~
.. -Y -
- . l
^
- r. ,
AS
, 1 than a stud size 8 or.10. The, lugs.for these, in order
- s . .
2 to fit the different terminal blocks and screw size
~
i 3 and at the same time maintain the amperage capacity 4 they are rated for, are manuf actured with a different
? .
~
. 5 shaped tongue.
X
$ 6 "For example, #12 copper wire has an amperagt k7 ;-
rating of 20 amps, and a lug designed to accept the wire mus t have the same or larger ampacity.
ld 8 d 9 "The rating of a lug is determined by the si:
i
$ 10 and shape of the tongue. It must have a specific area E.
f its surface in contact with the terminal block or h
N
{ 11
.g
=
[ -, d 12 its amapacity will be lessened.
~ f E YD .k 13 " A lug with its tongue designed for a #10 E
h >2- v.
g 14 screw has a hole in its tongue that is-larger than the VJ G -
j {c 15 hole in one designed for a #6 or #8 screw. The tongue j
. 16 is also wider and thinner. '
e d
u 17 "If a lug designed for a #10 screw is used a
{ 18 on a terminal' block designed for use with '!8 screws, E
I9 j -its. ampaci t'y is lessened because a #8 screw having a 20 smaller head size only applies pressure to the inner j 21 ring of the lug tongue causing a ' balling' effect.
- !- l
. 22 l 1,
l
\
"It causes the outer edges of the tongue to
.-- 23 j curl outward, also less area under the screw head is )
$ 24 I ig ,
in contact with the terminal block because of its larger h
f 25 hole. l T
.
\ .
M s
.l
. ..kl ' . ,- , ;
tL ,
Z '
ALDERSON REPORTING COMPANY,INC. '
bl. '. . .
ss..<.'..
..,..~.m.m..,.., s .x.,
n .g
,,s,.m..s...
v.~.
- ,...v.,...,.v . .s; .
......4..s...s..
l
, s.
y i.
G87A, I "There are many instances where.this has e 1
- 2. happened at Comanche Peak. 'Some of these are:
3 "1. Auxiliary B ui'l di ng Reactor #1---Lug
! 4 ' designed for an approximate screw size of 3/8" was
, 5 used oh a te rmina~1 'b lo ck d e s,i.g n e d for #10 screws.
X 6 "This was done with the aid of a steel washer f7 without the use of contact aid to prevent electrolysis 3 between the two dissimilar metals.
Y d 9 "2. Switchgear Room. Several lugs designed' i
( i h
E 10 for 1/4" screws were used on terminal blocks designed
\. I 11 for #10 screws.
v 12 "These two instances stand out in my mind t 13 but there a r.e many mo-re in particular concerning the
]-
=-
4 I4 circulating water system and fire control; however f h I $
$,1 5 15 without reference materials I cannot be more specific.
=
t:
I6 "However, there is at least ofte instance I e .
I7 can recall -- in fact for which I am at least partially b 18 -
_ responsible.
C 19
{ "This is the termination of a 1000 MCM 20 cable with the use of a 750 MCM lug that was drilled 21 to accept the larger cable size. It was done after 22 protest by both myself and another 'l e, 23
,; journeyman working as my partner on the termination crew.
6 24 ,
E i " Drilling 'the lug affected its ampacity in h'
25
! two manners: one, it reduced'the amount of metal to su
,a . . .
? ,
. ALDERSON REPORTING COMPANY. INC L .
"me *.
..;.! V ' ; a , e t j, ,
o ,
i -
.:.. . ~ v. . .: c4i..e. 3 eem.m3 s 4. s. s #w,em.s.n.* v-se.we em.ner .,- ,ss ~
y.
y .
N,.
. - . .s- .
. . - 187 1 conduct electricity and it was a bolt type mechanical
- 2 lug,. meaning that the lug was secured to..the cable b'y I
i 3 means of a bolt'or set screw in its body.
4 " Drilling the lug body had the effect of
, 5 lessening the nun.ber of threads to not more than three A
f6 or four for the set screw to be screwed into.
f7 "This was in a Motor Control Center in the 8 Circ'ulating Water system. Any failure in the circulating n o o 9 water system which provides coolant water for the reactor s .
i z o
g 10 could possibly cause very serious problems.
%(
. iE
+ E 11 "At least one cable in the Annunciator b $
(: 12 Logic Panels in the control room for Reactor il was i != 13 spliced in the annunciator panel itself and covered iLi - *
% 5 14 over with other wires to hide it from sight.
E
{= 15 "The cable was too large (it was assumed) c
' 16 to terminate on the fuse block to which it was designated.
a.
F g
17 "Upon examination of the fuse block I found ha E 18 the cable terminated to the wrong side of it. Had'it bee:
. =
~
19 1 terminated on the correct size the original cable 20 would have fit.
5 21 7
"The splice was made on the orders of 1 22 l Frank Platt, the General Foreman over termination.
I I *23 .
"Also in the Annunciator panels there were j
} 24 p , several '
Canon' type plugs in which the pins were not I 15 j
seated. properly. ,
2 ...-
.g
. )f ;' .."... . . . . .. .. .: .. . . . . . . * . : . ..: .- *
~a ' . -
g . ALDER' N. REPORTING COMPANiilNC.
.- . . - . ,'<.; -p ;: . . . ;- f.. _
y.: ,.
~
c.- w# maa;msy s ...w,.ms,_... .y..._.y _. . .. .w ..._ .m .. .e.,.,.,s.,...,.m. . , . , . . ,. m
7.. l .-
487 1 "This can cause the connector pins to be 2 p'ushed back into the body of the plug causing the pin v .
, 3 or pins to have poor contact.
i i 4 "The Annunciator Logic Panels give ' tlue alarm
, 5 if.any part of the sys tem malf unctions . Any malfunction X
6 in the annunciator system can cause no. alarm to be given
$ 7 in any emergency to which the plant may be subject.
8 " Portions of the grounding system for the
% 0 N d 9 cable trays in the Spreader Room were damaged either by i
v E
{ h 10 A
an employee collecting copper or deliberate vandalism.
(f { 11
" Strands were cut from the cables in several Uh _
12 places. The conductors were never cut entirely in two NT =
$ 13 but the removal of a strand of no matter what length
=
! 34 reduces th e capacity of the conductor.
E 15 "In.the Control Center for Reactor #1 1 16 i literally hundreds and possibly thousands' of wires were..,
e ,
I7 brought out of their metal raceway and pulled sharply '
I e
I over their sharp, unprotected edges, making them C
j 19 particularly vulnerable to abrasion and vibration.
20 "Every portion of every system in the plant 21 could be adversely affected by this faulty procedure.
n .
"At leas t one cable in the Switchgear Room
- 23 i
c was damaged while being pulled. I ts insulation was .
4 24
{ , nicked in several places and patched with heat shrink f 25 .
y tubing instead of being replaced.
g[
- 3) -
ALDERC N REPORTIN'G COMPANY, INC.
' ~
.h u . . 1;
. .x u . .y .
? .
- 7. ..c . . .. .
. +- .
Alf9').
I! ;
u ;
i "In at least two instances wires or cables V
2 were too short by only*a matter'of inches for proper l 3 termination. These were pulled very tigh tly and 4 terminated.
, '. 5 "They were pulled' tight enough tihat there 5
is the possibility'of their being pulled from their f6 j 7 lugs.
m s
i a
8l "One of these is in the Spreader Room; d
d 9 another is in a Motor Control Center in the Cir cul a ting z'
kE $ E 10 Water System.
r D !.11 " ' Cad welding ' or thermal welding of the
.4
!i 4
e Z
12 grounding conductors on the cable t. rays was done after /
'I E y 1 13 many cables had already been pulled through them.
[ 14 "I could not inspect for damage, bot the only E
E 15 protection used on the cables was an asbestos blanket E
j 16 that protected only the cables in the immediate vicinity t- 17 of the weld.
a -
C 18
,, "I am necessarily vague on which particular
.c.
I9 j cabinet or panel or even system to which I refer due to 20 time elapsed and the large number of sys tems on which l
l 21 l
I worked.
22 '
"With reference materials the location of i 23 t.'n e s e faults could be,much more closely identified as 24
-n l could others not mentioned specifically herein.
l ,
" Signed.this 14th , day of June 1982 at iNo coueiN.Y. INC.
~U --