ML20112B636

From kanterella
Revision as of 00:59, 18 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amend to Tech Specs Re PORC Review of Fire Protection Program & Implementing Prodedures
ML20112B636
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/16/1996
From: William Cahill
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20112B638 List:
References
JPN-96-023, JPN-96-23, JPTS-95-005, JPTS-95-5, NUDOCS 9605230048
Download: ML20112B636 (4)


Text

.

123 Main street Wraite Plains, New York 10601 914-681 6840 914-287-3309 (FAX)

  1. > NewYorkPbwer - .i. c.. &.

tv Authority c* " *"' o"~

May 16,1996 JPN-96-023 U. S. Nuclear Regulatory Commission ATTN: Docurnent Control Desk Mail Station P1-137 Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specifications Regarding PORC Review of Fire Protection Prooram (JPTS-95-0051

Dear Sir:

This upplication for an amendment to the James A. FitzPatrick Technical Specifications (TS) proposes to delete the requirement for the Plant Operating Review Committee (PORC) to review the fire protection program and implementing procedures. This proposal will reduce the administrative burden on the committee while making PORC's responsibilities more consistent with the other responsibilities described in Section 6.1.5.6 of the TS.

PORC will continued to oversee changes to the FitzFatrick fire protection program through its review of nuclear safety evaluations.

An additional change is proposed to delete redundant fire protection program inspection and audit requirements from Specification 6.14.A and 6.14.B. Similar inspections and audits are performed under the cognizance of the Safety Review Committee (SRC), as required by Specification 6.5.2.9.

The signed original of the Application for Amendment f.o the Operating Ucense is enclosea foi filing. Attachment I contains the proposed new TS pages and Attachment 11 is the Srrety Evaluation for the proposed changes. A markup of the affected TS pages is inciuded as Attachment 111.

t i A copy of this application and the associated attachments is being provided to the designated New York State Official in accordance with 10 CFR 50.91.

010034

~

f 00 (f 9605230048 960516 y I PDR ADOCK 05000333 \

P PDR i

i l .

i i

  • l No commitments are being made by the Authority in this submittal. If you have any questio,ns, please contact Ms. C. D. Faison.

Very truly yours, l

/ PA W. J. Cahill, Jr. ,

l ~ Chief Nuclear Officer  !

! i att: as stated i

cc
Regional . Administrator  ;

U. S. Nuclear Regulatory Commission  ;

475 Allendale Road  ;

King of Prussia, PA 19406 Off;ce of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 136 1.ycoming, NY 13093 Ms. K. Cotton, Acting Project Manager Project Directorate 1-1 Division of Reactor Projects-l/Il ,

U. S. Nuclear Regulatory Commission Mail Stop 14B2 Washington, DC 20555 Mr. F. William Valentino l

President New York State Energy, Research, and Development Authority

! 2 Rockefeller Plaza  ;

Albany, NY 12223-1253 l

i I b a

i

.