ML20095K650

From kanterella
Revision as of 03:27, 2 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Comment Supporting Draft Reg Guides DG-8010, Criteria for Monitoring & Methods for Summation of Internal & External Occupational Doses, & DG-8011, Radiation Dose to Embryo/ Fetus
ML20095K650
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/27/1992
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FRN-57FR7942, RTR-REGGD-8.034, RTR-REGGD-8.036, RTR-REGGD-XX.XXX, TASK-DG-8010, TASK-DG-8011, TASK-RE 2034, 57FR7942, NUDOCS 9205060001
Download: ML20095K650 (2)


Text

-. -

' 1

) S 09 D'? %?&2 M CENTERIOR 37F<79n /

ENERGY QJ / /" /c 2,.

/

Donald C. Shelton 300 Madison Avenue Vce President Nuclear Toledo, OH 436520001 / l Davis Besse (419)249 2300 Docket Number 50-346 l

License Number NPF-3 l Serial Number 2034 April 27, 1992 l

,S b ,

United States Nuclear Regulatory Commission g< j,_

Regulatory Publications Branch, DFIPS -

3Di l Washington, D.C. 20555 g ;rg

50 Subj ec t : i Comments On Draft Regulatory Guides DG-8010 and DG-8011;a o

$n Gentlemen: h $

C2 The comments included in this letter are submitted by Toledo Edison in response to the request of the U.S. Nuclear Regulatory Commission (NRC) for comments on Draft Regulatory Guide DG-8010, Criteria for Monitoring and Methods for Sammation of Internal and External Occupational Doses and Draft Regulatory Guide DG-8011, Radiation Dose to the Embryo / fetus. )

These Draft Regulatory Guides are intended to assist in implementation of the requirements of the revision t 10 CFR Part 20, " Standards for i Protection Against Radiation," that was published in the Federal Register (56 FR 23360) on May 21, 1991.

Toledo Edison, a subsidiary of Centerior Energy, is partial owner of i

and is responsible for operation of the Davis-Besse Nuclear Pover Station. Toledo Edison has been authorized for power operation of the Davis-Besse Nutlear Power Station since April 1977. As a 10 CFR 50 licensee, Toledo Edison has a vested interest in any policies the NRC may adopt which can affect the management and operation of a commercial nuclear power plant.

i Based on a review of Draft Regulatory Guides DG-8010 and DG-8011, the Company finds these documents acceptable as written.

9205060001 920427 PDR REGGD XX.XXX C PDR overmy companies Clewe;ond Electne mummofmg toiedo Edison

. __ _ _ _ _ .. _ _ . . _ . . . _ _ _ . _ _ . __ _ . ..r__ _ _ __ _ ___ _ _ ..

.e: . Docket Number 50-346

.- , . License Number NPF-3 Serial Number 2034 Page 2 Please refer any questions regarding these comments to Ms. R. V. Schrauder at (419) 249-2366.

Very tru yours,

.Q/ f

(

MAT /dlm cc: A. B. Davis, Regional Administrator, NRC Region III J. B. Hopkins, Ni<C Senior Project Manager V. Levis, DB-1 NRC Senior Resident Inspector S. McGuire, USNRC S. S.-Yaniv,-USNRC

. USNRC Document Control Desk Utility Radiological Safety Board 1

I L

l

  • me*N wP g- *W t* 4 me m1 * *-vf'