ML20097G573

From kanterella
Jump to navigation Jump to search
Comment Supporting Petition for Rulemaking PRM-50-63 Re Use of Potassium Iodide
ML20097G573
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/13/1996
From:
CENTERIOR ENERGY
To: Hoyle J
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-60FR58256, RULE-PRM-50-63 60FR58256-00053, 60FR58256-53, NUDOCS 9602210316
Download: ML20097G573 (2)


Text

m I -

a b-CENTER 00R COCdETED

,D ENERGY U$tT m p, se 300 Mooison Avenue ,,-_.a Toledo, OH 43652-0001 '96 FEB 20 A1,, m oent. uooieo, Dovts Besse 419-249-2300 OF F!C . f i ~ ~C if F

Docket Number 50-346 DOCE ; "'

g.y-License Number NPF-3 DOCKETNUMBER Serial Ntunber 2359 pg February 13, 1996 Mr. John C. Hoyle Secretary of the Commission United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Docketing and Service Branch

Subject:

Comments on Petition for Rulemaking Filed by Mr. Peter G. Crane (60 FR 58256)

Gentlemen:

Toledo Edison (TE), a subsidiary of Centerior Energy, is partial owner of and is responsible for operation of the Davis-Besse Nuclear Power Station. Toledo Edison has been authorized for power operation of the Davis-Besse Nuclear Power Station since April 1977. As a 10 CFR 50 licensee, TE has a vested interest in any rules which the Nuclear Regulatory Commission (NRC) may adopt which can affect the management and operation of a commercial nuclear power plant.

Toledo Edison has reviewed the written comments submitted by the Nuclear Energy Institute (NEI) to the NRC concerning Mr. P. G. Crane's petition for rulemaking that the standard in 10CFR50.47 be amended to include, among the protective actions for the general puolic, the prophylactic use of potassium iodide (KI). Toledo Edison fully supports NEI's position that stockpiling or predistribution of KI will not add any significant public health and safety benefit to the adequate level of protection currently provided by existing emergency planning at and around commercial nuclear power plants. Therefore, TE strongly urges the NRC to deny the petition for rulemaking proposed by Mr. Crane.

9602210316 960213 PDR PRM 50-63 PDR operating Componies Cleveland Electnc liluminating Toledo Edison O yt

t a l i. Docket Number 50-346 License Number NPF-3

! Serial Number 2359 Page 2 Should you have any questions or require additional information, please contact Mr. James L. Freels, Manager - Regulatory Affairs, at (419) 249-2366.

Very truly yours, GAB / eld cc: L. L. Gundrum, NRC Project Manager H. J. Miller, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector USNRC Document Control Desk Utility Radiological Safety Board l

l l

1 i

i I

l l

l