ML20070D590
| ML20070D590 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/30/1991 |
| From: | Shelton D TOLEDO EDISON CO. |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-55FR53220, RULE-PR-MISC 55FR53220-00023, 55FR53220-23, MISC-90-10, NUDOCS 9103010032 | |
| Download: ML20070D590 (2) | |
Text
,,
~..
DOCKET NUMBER 1
_ MOOOSED RULE $ M4 f ")
lIR
'tenLD S S F 4 5 3 2 2.o
'I I
CENTERCOR U'* C ENERGY:
%3
'9}.- y* 'd F5:C9 300 Masoa Annue oonow c. shetton ye, pgm. Nuclear -
Toleoo. OH 436520001 De Besse _
(419)M P300
\\
.s 1
{
Docket-Number 50-346
[
License Number NPF-3 l
-Serial-Number 1901-L cJanuary 30, 1991 Secrete.ry[UnitedStatesNucleat Regulatory Commission
' Attention Docketing and Service Branch Vashington, D.C.-'20555
Subject:
Commer's'to SECY 90-347, " Regulatory Impact Survey Report" a
Gentlement-On December 27, 1990, the Nuclear Regulatory Commission pub 1 phed in the Federal Register, (55 FR 53220) a notice of availability of SEC1 90-347,-
" Regulatory Impact Survey Repnrt". The Federal Register solicited vritten comments from interested parties regarding the proposed corrective actions 3
' presented-in the SECY paper. Tcledo-Edison, owner / operator of-t.he Davis-Besse Nuclear Power Station, and subsidiary of Centerior Energy
- Corporation appreciates the opportunity to. comment as an. interested party.
'As--n 10 CFR Part 50 li asco, Toledo Edison h's a vested interest.in any a
jpolicies the Commission may cdopt that-have he potential to affect the 2
management and operation of:a commercial nuclear power plant.
Toledo Edison's comments.are reflec+ed in comments which are being submitted
, : on the industry's behalf: by the Nuclear Management and Resources Council (NUMARC)-'and'the< Nuclear Utility Backfitting and Reform Group (NUBARG).
- Toledo Edison endorses ~the comments.provided by NUMARC and NUBARG.
jl one additional area that Toledo Edison vould like to provide comment on-concerns the NRC staff's priority ranking. system for the management of
- licensing.revievs.
In 1988, the NRC staff developed and implemented a priority ranking system for the management of licensing reviews.
This system assigned priorities on the basis of safety significance, operational effect, and statutory responsibilities.
In 1989, in an effort to reduce the
-growing _ backlog of licensing activities, the Staff completed a study of the i
backlog and established timeliness goals for the residence time of l
licensees' requests. The effort to-reduce this backlog has taken precedence I
j
]
over the prioritization system established in 1988.
i 9103010032 910130 PDR PR MISC 55FR53220 PDR Opercitng Companies
- Clevetenc Eteemc mummoMg Toteco Ed. son gg L) J
m
_, ~.
7 G. ' lDhekst Nhber 502346i I
?
. Lic nso Nur.bsr NPF-3:
LSerial Number 19011: i 1
hfr.l'Page2L yn E
- --[.'
v y
2is m;.To1 Ado Edison realizes thatEthis. effort was initiated at-the request of the i g,0$ndustry, but believes thatCthe NRC staff is placing too much emphusis on W~~'
l reducing.;this(backlog,"thus not giving current issues enough attention.-
W 4s l Toledo. EdisonL believes: that Jthe NRC. staff should discuss, vith the '
7 n utilitiesu the outstandiing: licensing 1activitlei for each site and-determine-theLpriority;of the11asues' based on safety significance, operational issues,-
g
,"and plant needs along withLthe reduction of backlog' items.
=
yp1 a
4 m,
[.If-you have any questions concerning.this matter,'.please contact'
.s o.
mM Hr. R.% Schrauder. Manuger Nuclear Licensing, at (419) 249-2366.'
1 02
~
^
UVeryir61y yours',.
_ g e
/r l
? (
(JMM/mmb' 1
he:
P. L -Byron, DB-1.NRC Senior Resident:. Inspector s
A.fB. Davis, -Regionall Aduinis trator', 'NRC Region' III' J
W D. C. Di Iannii.-DB-1 NRC Senior. Project Manager:
~
f.
Utility-Radiological! Safety: Board -
+
.-g
- c. i l
..(
~!
i yg_
- i;.
- (;
s
'^
9-
. f 'p '
(
+
s r
V t
3 1
l i
l F-T A
3
'.3 4.
. ~..
....__.m.,_..
.~. _...-..-..-, -
3..
- - -.