ML20099A405

From kanterella
Jump to navigation Jump to search
Comment on Proposed Rules 10CFR20 & 50 Re Reducing Regulatory Burden on Nuclear Licensees.Supports Rules
ML20099A405
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/17/1992
From: Shelton D
CENTERIOR ENERGY
To: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-57FR27187, FRN-57FR39353, RULE-PR-20, RULE-PR-50 2068, 57FR27187-00021, 57FR27187-21, AE30-2-027, AE30-2-27, NUDOCS 9207290151
Download: ML20099A405 (2)


Text

-.

J

,~ COCKF NUMGER

' v."" 03ED RULE N 1 d ,EO

[ CENTERDOR (5~7 F R. 271 J-7f

. nu i t. N ENERGY sure poned c. muon '92 JUL 24 A9 :35 x0 Masson Annue ioledo, OH 436.520001 Vce Presadent Nuclear Davis Besse (419)249 2300 N

CEi %m.

M Docket Number 50-346 License Number NPF-3 _

Serial Number 2068 July 17, 1992 Mr. Samuel J. Chilk Secretary of the Commission Nuclear Regulatory Commission Vashington, DC 20555 s Attention: Docketing and Service Branch

Subject:

Comments on Prcposed Rule, " Reducing the Regulatory Burden on Nuclear Licensees", 57 Federal Register 27187, June 18, 1992

Dear Mr. Chilk:

Toledo Edison (TE), a subsidiary of Centerior Energy, is partial ovner "

of and is responsible for operation of the Davis-Besse Nuclear Pover Station. Toledo Edison has been authorized for power operation of the Davis-Besse Nuclear Power Station since April 1977. As a 10 CFR 50 licensee, Toledo Edison has a vested interest in any policies the U.S.

NRC may adopt which can affeet the management and operation of a commercial nuclear power plant.

Toledo Edison has reviewed the proposed rule changes and fully supports the proposed revisions. However, the submittal frequency of some of the reports described in the changes are specified in Section 6.0 of the Davis-Besse Nuclear Power Station Technical Specifications as well as in the present rules. Toledo Edison recommends that it be noted in the final rules that the revised reporting requirements supersede the reporting requirements of the Technical Specifications until such time the Technical Specifications can be changed.

9207290151 920717 PDR PR 20 57FR27187 PDR operatng compames Cieveiond Electr;c mumnating j foiedo f d; son

/

Docket Numbar 50-346 License Number NPF-3 Serial Number 2068 Page 2-Should you havo any questions or require additional information, please contact Mr. Robert V. Schrauder, Manager - Nuclear Licensing at (419) 249-2366.

Sincerely yours, NKP/dl cc A. B. Davis, Regional Administrator, NRC Region III J. B.. Ilopkins, NRC/NRR DB-1 Senior Project Manager -

V. Levis, NRC Senior Resident Inspector USNRC Document Control Desk Utility Radiological Safety Board

_ ._,