ML20099E182

From kanterella
Revision as of 14:26, 30 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Comment Supporting Proposed Rules 10CFR20 & 61 Re LLW Shipment Manifest Info & Reporting
ML20099E182
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/28/1992
From: Shelton D
CENTERIOR ENERGY
To: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-57FR14500, RULE-PR-20, RULE-PR-61 2072, 57FR14500-00032, 57FR14500-32, NUDOCS 9208100054
Download: ML20099E182 (1)


Text

______ _

DOCKET N 9 %

PROFC:'.20 i LG 9 fbi I /-

15 7 F/t A.rooj

[h*

h b cswremon ENERGY . uuu-UaNi.C b9'--

Donald C. Shelton 300 Masson Avenue Vce Presidst4 clear 92 AUG -4 NO:34 u w o,og 43 m Davis Besse (419'2G 2300 Docket Number 50-346 F it' M 3 0 r i t. ti <

00CKCiiN6 i. 'i a trJ License Number NPF-3 Serial Number 2072 July 28, 1992 Mr. Samuel J. Chilk _

Secretary of the Commission United States Nuclear Regulatory Commission Vashington, D.C. 20555 Attention Docketing and Service Branch

Subject:

Comments On Proposed Rules Lov-Level Vaste Shipment Manifest Information and-Reporting

Dear Mr.'Chilk:

Toledo Edison, a subsidiary of Centerior Energy, is partial ovner of and is responsible for operation of the Davis-Besse Nuclear Pover-Station. Toledo Edison has been authorized for power operation of the Davis-Besse Nuclear Power Station since April 1977. As a 10 CFR 50 licensee, Toledo Edison has a. vetted interest-in any policies the NRC may adopt which can affect the management and operation of a commercial nuclear power plant.

Toledo Edison'has reviewed the proposed rule, published in the Federal -

Register on April- 21, 1992 (57 FR 14500), entitled " Low-Level Vaste Shipment Manifest Information and Reporting" and agrees with thi.need to standardize a uniform vaste manifest. Toledo Edison supports the Edison' Electric Institute vorking group's comments on the proposed rule.

If you have any questions regarding these comments, please contact Mr. Robert V. Schrauder at (419) 321-2366.

Very y yours, LAT/dle C ec: A. B.~ Davis, Regional Administrator, NRC Region III J. B.'Hopkins, NRC Senior Project Manager V. Levis, DB-1 NRC Senior Resident Inspector USNRC Document Control Desk Utility Radiological Safety Board 9200100054 920724 PDR PR 20 57FR14500 PDR

{Q Operating Compomes

- Cleveiono Electnc mminating foteco Eo son

_ - _ _ - - _ _ - _ _ _ _ _ _ _