Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20249A4121998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7501998-04-30030 April 1998 Rev 2 to Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit ML20247F6721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Davis-Bess Nuclear Power Station,Unit 1 ML20249A4141998-04-30030 April 1998 Revised Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216B4041998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216C5131998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20202D3721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20198K7931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20203A3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Davis-Besse Nuclear Power Plant,Unit 1 ML20198S5371997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Davis-Besse Nuclear Power Station ML20217H7701997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20216H3261997-08-31031 August 1997 Monthly Operating Rept for August 1997 for DBNPS ML20217K0241997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Davis Besse Nuclear Power Station,Unit 1 ML20140H0441997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Davis-Besse Nuclear Power Station Unit 1 ML20141B9521997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Davis-Beese Nuclear Power Station Unit 1 ML20137T5271997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20136G7221997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Davis-Besse Nuclear Station Unit 1 ML20134L9831997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Dbnps,Unit 1. W/Undated Ltr ML20133G0161996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20149M4071996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Davis-Besse Nuclear Power Station Unit 1 ML20134P9821996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20128Q0611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Davis-Besse NPP, Unit 1 ML20117D5341996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20117D5411996-06-30030 June 1996 Revised MOR for June 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20116E0161996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Davis-Besse Nuclear Station Unit 1 ML20113B9111996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Davis-Beese Nuclear Power Station Unit 1 ML20117H7231996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Davis-Besse Unit 1 ML20112E6061996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for David-Besse Nuclear Power Station,Unit 1 ML20101G5251996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for DBNPS Unit 1 ML20149K7711996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Davis-Besse Nuclear Power Station.W/Undated Ltr ML20096C7971995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20095H3761995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20094L1041995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20093J2341995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Davis-Besse Nuclear Power Station ML20098A2651995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Davis-Besse Nuclear Power Station,Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & Pnpp QA Program ML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20211B0271999-08-13013 August 1999 SER Accepting Second 10-year Interval Inservice Insp Requests for Relief RR-A16,RR-A17 & RR-B9 for Plant, Unit 1 ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195K2871999-06-16016 June 1999 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20207E8011999-05-19019 May 1999 Non-proprietary Rev 2 to HI-981933, Design & Licensing Rept DBNPS Unit 1 Cask Pit Rack Installation Project ML20207F4351999-05-0404 May 1999 Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504 ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20199H5931999-01-20020 January 1999 Safety Evaluation Accepting Thermo-Lag Re Ampacity Derating Issues for Plant ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20205K5781998-12-31031 December 1998 Waterhammer Phenomena in Containment Air Cooler Swss ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20155B6781998-10-28028 October 1998 Safety Evaluation Accepting Proposed Reduction in Commitment Changes in QA Program Matl Receipt Insp Process ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With ML20237E3171998-08-21021 August 1998 ISI Summary Rept of Eleventh Refueling Outage Activities for Davis-Besse Nuclear Power Station ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236U5011998-07-23023 July 1998 Special Rept:On 980624,Unit 1 Site Damaged by Tornado & High Winds.Alert Declared by DBNPS Staff,Dbnps Emergency Response Facilities Activiated & Special Insp Team Deployed to Site by Nrc,As Result of Event ML20236R1441998-07-15015 July 1998 SER Related to Quality Assurance Program Description Changes for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236K3981998-06-30030 June 1998 SER Accepting in Part & Denying in Part Relief Requests from Some of ASME Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Davis-Besse Nuclear Power Station,Unit 1 ML20236K5131998-06-29029 June 1998 Safety Evaluation Accepting Proposed Alternate Emergency Operations Facility Location for Davis-Besse Nuclear Power Station,Unit 1 ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20249A4121998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20196B5221998-05-23023 May 1998 10CFR50.59 Summary Rept of Facility Changes,Tests & Experiments Dbnps,Unit 1 for 960602-980523 ML20236E7581998-05-19019 May 1998 Rev 0 to Davis-Besse Unit 1 Cycle 12 Colr ML20236N7501998-04-30030 April 1998 Rev 2 to Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit ML20247F6721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Davis-Bess Nuclear Power Station,Unit 1 ML20249A4141998-04-30030 April 1998 Revised Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20217P8041998-04-0707 April 1998 11RFO OTSG ECT Insp Scope ML20216B4041998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216C5131998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20202D3721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20199G6321998-01-26026 January 1998 Rev 1 to Davis-Besse Unit 1,Cycle 11,COLR ML20198R4771998-01-13013 January 1998 SER Approving Second 10-year Interval Inservice Inspection Program Plan Requests for Relief for Davis-Besse Nuclear Power Station,Unit 1 ML20198K7931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20217K6401997-12-31031 December 1997 1997 Annual Rept First Energy ML20203A3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Davis-Besse Nuclear Power Plant,Unit 1 ML20198S5371997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Davis-Besse Nuclear Power Station ML20217H7701997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20216H3261997-08-31031 August 1997 Monthly Operating Rept for August 1997 for DBNPS ML20217K0241997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Davis Besse Nuclear Power Station,Unit 1 1999-09-30
[Table view] |
Text
_ _ _ - - _ _ _ _ _ _ - - _ - _ _ _ - - - - _ _ _ .
A\ ER AGE D AILY L: Nil P0hER LEVEL DOCKET NO. 50-336 L' Nil Davis-Besse (!!
D ATE April 13, 1992 CO\tPLEll D itY hilal Sarspur TELEP110NE ( 419) 321-738 <.
m ai, 1992 st0NTil DAY AVER AGE D AILY POhER LEVEL. DAY AVER AGE (MILY POhER LEVEL t\the Net t t \th e-Net p y 0 p 888 3 gg 887 7
3 790 ig 889 4
007 20 80 883 891
$ 3 ,
882 887 6 3 7
883 891 73 g 884 887 74 9 885 ;g 888 10 887 26 888
~
gj 890 77 887 37 889 890 73 g3 889 y, 888 g4 891 80 30 8M 3, M
15 16 886 INSlRUC110NS On this format.hst the aserne dady umt powet lese! m \1We-Net for each day in th- repomng m . nth. Omnpute to the nearest whole megawatt cor7; 9204170092 920413 PDR ADOCK 05000346 R PDR
l OPER ATLNG DATA REPORT DOCKL1NO 50-146 0WE iwIll_D I992 CON 1PLET ED liY R11n1 S3fMOu TELEPHONL (419) 321 -7 38 A' OPERATING STATUS N"
- 1. Urut Name; lblVIS-BPSSC lln i t #1 Mm b , 1992
- 2. Reporting Period:
2772
- 3. Licensed Thermal Power t%1her
- 4. Nameplate Rating (Grou Slhe- 925
- 5. Design Electrical Rating (Net Slwet 906
- 6. Stasimum Dependable Capacity (Gross Nlwer 921
- 7. Stasimum Dependable Capadty (Net Mher 877
- 5. If Changes Occur in Capacity Ratings (Items Numb <3 3 Through 7) Since Last Report Gise Reasont
- 9. Power Lesel To hhich Restricted. If Any (Net Mher
- 10. Reasons For Restrictions. If Any :
This Month Yr to-Date Comulathe
- 11. Hours in Reporting Period 744.0 2,184.0 119,833_
- 12. Number Of Hours Reactor Was Critical 719.2 2.159.2 68.335.0
- 13. Reactor Reserve Shutdown Hours 24.8 24.8 5,532.0
- 14. Hours Generator On-Line 702.3 2,142.3 66.175.4
- 15. Unit Resene Shut.down Hours 0.0 0.0 1.732.5
- 16. Grou Thermal Exrgy Generated (MWH) 1,930,643 5,917,666 16? 526.9L 17 Gross Electrical Energy Generated (MWH) 648,250 1,989.784 53,883d61-
- 15. Net Electrical Energy Generated (MWH) 615,000 1,892.058_ 50.684.54(.
- 19. Unit Senice Factor 94.4 98.1 55.2
- 20. Unit Asailability Factor 94.4 9M.1 56.7 21 Unit Capacity Factor (Using MDC Net) 94.3 98.8 48.2
- 22. Unit Capacity Factor (Using DER Net) 91,2 95.6 46.7
- 23. Unit Forced Outage Rate 5.6 1.9 24.6
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht
- 25. If Shut Down At End Of Report Period Estimated Date of Startup.
- 26. Units in Test Status (Pnor to Commeretal Operationr Forecast Achiesed INITIA L CRITIC ALITY INITI A L. ELECTRICITY COMMERCI AL OPER AllON pum )
UNIT $3ftfrDOWitS A!7D IUWER PEIPJCTIOftS
-m,30-346 -
UtsIT NAME Davis-Besse el Int April 13. 1992 ,
COMPIETED BY tilal Sarsour psPerr texrne March, 1992 TEtzrnanc (419 p 321-73e4 r
t e
, c_
o .
~
c %gy ucensee
- 4 e e cause a corrective I$*
w w g
.No. Date h # Event e e c o Mtic" to p $ e u sr. , ,
3 x g g$f 2 **" 't ' 5"
= v o
P'"*"t ** "'**
- 8 t 1 32-03-01 F 10.4 11 5 NA NA NA Power reduction to approximately 6 percent to take the turbine-generator off line to allow contain-ment entry for Containment Air Coolers cleaning and to perform containment walkdown and inspection for leaks.
2 42-03-01 F 31.3 H 3 92-002 SB PCV i
The reactor tripped by the Anticipatory Reactor Trip System '
(ARTS) following a turbine trip.
'See Operational Summary for further details. ;
F: Tsreed Peason: Nthod:
- Exhibit G - Instrw;tsons for Preparation of Data S: Scheduled A-Equirment railure (Explain) 1-m nual Entry Sheets for Licensee Event Report (IIR)
B--mte:tecance or Test 2-s nual Scram File t'? MEG-0161 )
c-Refueling 3-Automatic Scram D-Regulatory Restriction 4-continuation from '
E-operator Training & License Examination Previous Month Exhib A I - Same Source F-Administrative 5-Ioad Reductson
- Report challenges to Power Operated Relief valves G-Operational Error (Explain) 9-other (Emplain) (PORVsl and Pressuriger CwSe Safety valves (PCSvs)
H-other (Explain) l l
Operational Summary March, 1992 Reactor power reduction to approximately 6 percent continued. A manual power l
reduction to 6 percent was initiated to take the turbine-generator off line to allow containment entty for Containment Air Coolets (CACs) cleaning and inspection for the source of a small Reactor Coolant System (RCS) leak that was causing boron deposits on the Containment Air Coolers.
The turbine-generator was taken off line at 0326 hours0.00377 days <br />0.0906 hours <br />5.390212e-4 weeks <br />1.24043e-4 months <br /> on March 1, 1992.
At 1157 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.402385e-4 months <br /> on March 1, 1992, and after the completion of Containment Air Coolers cleaning, reactor power was slovly increased and the turbine-generator I was synchronized on line at 1348 hours0.0156 days <br />0.374 hours <br />0.00223 weeks <br />5.12914e-4 months <br /> on March 1, 1992.
~
At 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> on March 1, 1992, while the unit was at approximately 40 percent of full power, a reactor trip occurred. The reactot tripped by the Anticipatory Reactor Trip System (ARTS) following a turbine trip. The turbine trip vas due to actuation of the exhaust hood temperature trip circuit when Maintenance - I&C personnel vere checking the condition of the vacuum pressure switches at a junction box local to the turbine. It has been determined that a meter test lead came into contact with the wrong terminal point, vhich then actuated the turbine exhaust hood high temperature trip for the main turbine.
The reactor was critical at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on March 2, 1992, and the turbine-generator was synchronized on line at 2221 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.450905e-4 months <br /> on March 2, 1992.
Reactor power was slovly increased to approximately 100 percent, which was achieved at 0625 hours0.00723 days <br />0.174 hours <br />0.00103 weeks <br />2.378125e-4 months <br /> on Mar ch 3, 1992, and maintained at this power level for the rest of the month-M
. REFUELING'INFORMATION- Date March 1992
- 1. Name of facility:. Davis-Besse Unit 1 f
2' . Scheduled date-for:next' refueling outage? March 1993
- 3. The number of fuel assemblies-(a) in the core and (b) in the spent fuel storage pool, and (c) the new fuel storage areas.
~
l j
1.a) 177 (b) 393 (c) 0 \
The present licensed spent fuel pool storage capacity and the size of any l increase in licensed storage capacity that-has been requested or is olanned, in number'of fuel assemblies.
Present: 735
- 5. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
Date: 1994 - assuming ability to unload the entire core into the spent fuel pool is maintained b
9 i
k
-, . -, .. - < - . _ . .+ .--,.I'