Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 ML20132E6211996-12-17017 December 1996 Proposed Tech Specs 3/4.7.3 Re Component Cooling Water Sys ML20132B5111996-12-10010 December 1996 Proposed Tech Specs Re Groundwater Level Exceeding Current Maximum Water Level ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML20134H0051996-11-0606 November 1996 Proposed Tech Specs,Modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20134F8781996-09-0404 September 1996 Proposed Tech Specs Requiring Exemption from Certain Requirements of 10CFR50.44, Stds for Combustible Gas Control Sys in Light Water Cooled Power Reactors & 10CFR50.46, Acceptance Criteria for Eccs.. ML20107L3951996-04-25025 April 1996 Proposed Tech Specs,Providing Suppl Info Re Clarification of TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101Q0871996-04-0808 April 1996 Proposed Tech Specs Re EDG Allowed Outage Times ML20101F7971996-03-21021 March 1996 Proposed Tech Specs,Clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguards Area Ventilation Sys ML20097C0171996-01-31031 January 1996 Proposed Tech Specs,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy Portions of SRs Required During Shutdown ML20097J4341996-01-30030 January 1996 Proposed Tech Specs,Modifying Table 3.2-1 of TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9871996-01-23023 January 1996 Proposed Tech Specs,Permitting Use of 10CFR50,App J,Option B performance-based Containment Lrt ML20094N7921995-11-20020 November 1995 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0191995-10-25025 October 1995 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5921995-10-17017 October 1995 Proposed TS 4.4.5.1,Table 4.4-1,reducing from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6161995-10-17017 October 1995 Proposed Tech Specs,Allowing Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4231995-09-19019 September 1995 Proposed Tech Specs,Increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J3051995-09-19019 September 1995 Proposed Tech Specs,Revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2481995-09-0101 September 1995 Proposed Tech Specs,Allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087A1171995-07-26026 July 1995 Proposed Tech Specs,Increasing Pressurizer Safety Valve Lift Setpoint Tolerance as Well as Reduce Pressurizer High Pressure Rt Setpoint & Allowable Value ML20087A1311995-07-26026 July 1995 Proposed Tech Specs,Clarifying TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20087G3471995-03-30030 March 1995 Proposed Tech Specs Re Changes That Allow One of Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operationin Order to Refurbish Isolated Svc Water Headers 1999-08-04
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML20211D9201999-08-20020 August 1999 Revised Pages to Third Ten Year ISI Program & Relief Requests ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20195B5881999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 ML20195B5691999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20205P2511999-05-0101 May 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports ML20205P2341999-05-0101 May 1999 Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20205P2651999-02-0404 February 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20196K1971998-12-22022 December 1998 Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 ML20206N8851998-12-14014 December 1998 Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval ML20206N8711998-11-30030 November 1998 Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20236H5311998-07-0101 July 1998 Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included ML20236U8891998-06-25025 June 1998 Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML20236H5541998-06-0404 June 1998 Rev 5 to Procedure VPAP-0810, Crane & Hoist Program ML20236H5391998-06-0404 June 1998 Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program ML20206N8581998-04-30030 April 1998 Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 ML20236H5701998-04-0202 April 1998 Rev 8 to Procedure VPAP-1901, Industrial Safety & Health ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML20236H5631998-02-10010 February 1998 Rev 11 to Procedure VPAP-0105, Fitness for Duty Program ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20210Q2051997-12-31031 December 1997 1997 Severe Accident Management Tabletop (Scenario 1) Drill Manual ML20203G5191997-12-29029 December 1997 Ultrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water Piping ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20198G5401997-08-31031 August 1997 Rev 0 to NE-1133, North Anna Unit 1,Cycle 13 Startup Physics Tests Rept, Aug 1997 ML20199G5681997-06-30030 June 1997 Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not Included ML20210Q1991997-06-10010 June 1997 Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program Administration ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 1999-08-04
[Table view] |
Text
_ - _ _ _ _ .
4 Attachinont 2 Proposed Technical Specification Changes North Anna Units 1 and 2 Virginia Electric and Power Company
$R D 080038 P PDR
f 1/4.1 REACTIVITY CONTROL SYSTEMS BASE _S _ _ _ . _
3/4.13 BORATlON CONTROL 1/4.1.1.1 and 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1) the reactor can be max subcritical from all operating conditions, 2) the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3) the reactor will be maintained sufficiently suberitical to preclude inadvertent criticality in the shutdown condition.
SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS Tavg. The most restrictive condition occurs at EOL, with Tav0 at no load operating temperature, and is associated with a postulated steam line break accident and iesulting uncontrolled RCS cooldown. In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.77% AM is initially required to control the reactivity transient. Accordingly, the SHUTDOWN MARGIN requirement is based upon this limiting condition and is consistent with FSAR safety analysis assumptions. With Tavg
< 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal. A 1.77% AM shutdown margin provides adequate protection for the boron '
dilution accident.
a/4.1.1.3 BORON DILUTION A minimum flow rate of at least 3000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron
- concentration reductions in the Reactor Coolant System. A flow rate of at least 3000 GPM wlll cliculate the Reactor Coolant System volume in approximately 30 minutes. The reactivity change rate associated with boron reductions will therefore be within the capability _ for operator recognition and control.
1/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT (MTC)
The limitations on MTC are provided to ensure that the value of this coefficient remalns within the limiting nnditions assumed for this parameter in the FSAR accident and transient analyses.
The MTC values of this specification are applicable to a specific set of plant operations; accordingly, verification of MTC values at -
NORTH ANNA UNIT 1 B 3/4 1 1 Amendment No.
4 DESIGN FEATURES a in accordance with the code requirements specified in Section 5.2 of the FSAR, with allowance for normal degradation pursuant to the applicable Surveillance Requirements,
- b. For a pressure of 2485 psig, and
- c. for a temperature of 050'F, except for the pressurizer which is 680*F.
NE t 5.4.2 The total water and steam volume of the reactor coolant system is approximately 10,000 cubic feet at nominal operating conditions.
5.5 METEOROLOGICALTOWER LOCATION 5.5.1 The meteorological tower shall be located as shown on Figure 5.11.
- 5 6 FUEL STORAGE CRITICAllTY 5.6.1.1 The spent tuel storage racks are designed and shall be maintained with:
- a. A Kett equivalent to less than or equal to 0.95 when finoded with unborated water,, which includes- a conservative allowance of 3.4% della k/k for uncertaintles,
- b. A nom'nal 10 9/16 inch conter to-conter distance between fuel assemblies placed.in the storage racks.
5.6.1.2 The new fuel pit storage racks are designed and shall be maintained with a nominal 21 inch center to center distance between new fuel assert.blies such that, oil a best estimate basis, Kett will nof exceed .98, with fuel of the highest anticipated '
enrichment in place, when aqueous foam moderation is assumed.
- 5.6.1.3 If new fuel for.the first core loading is stored dry in the spent fuel storage racks, the center to center distance between the new fuel assemblies will be admristratively limited to 28 inches and the ke,t shall not exceed 0.98 when aqueous foam moderation is assumed.
NORTH ANNA UNIT 1 5-5 Amendment No.
4 ~4 , - _ , _
p
. T4.1 REACTMTV CONTROL SYSTEMS BASES _
3/4.1.1 BORATION CONTROL 3!4.1.1.1 and 314.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1) the reactor can be mado subcritical from all operating conditions, 2) the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3) the roactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.
SHUTDOWN MARGIN requiroments vary throughout core life as a function of fuel '
depletion, RCS borou concentration, and RCS Tavg. The most restrictivo condition occurs at EOL, with Tavg at no load operating temperaturo, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown. In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.77% Ak/k is initially required to control the reactivity transient. - Accordingly, the SHUTDOWN MAR 31N requiremont is based upon this limiting condition and is consistent with FSAR safety analysis assumptions, With Tavg loss than 200'F the reactivity transients resuhmg from a postulated steam line break cooldown are minimal.
3/4.1.1.3 BORON DlLUTION A mirdmum flow rate of at least 3000 GPM as provided by either one RCP or ono RHR pump as required by Specification 3.4.1.1, provides adequate mixing, provents stratification and ensures that reactivity changos will be gradual during heron concentration reductions in the Reactor Coolant System. A flow rato of at least 3000 GPM will circulate the Reactor Coolant System volume in approximately 30 minutos. The l reactivity change rate associated with boron reductions will therefore be wl'hin the capability for operator recognition and control. The requiroment that certain valves remaln closed at all times except during planned boron dilution or makeup, activities providos assurance that an inadvortent boron dilution will not occur.
NORTH ANNA UNIT 2 B 3/4 1-1 Amendment No.
. DESIGN FEATURES 5.3 REACTORCOPE EUEL ASSEMBUES i
5.3.1 The reactor core shall contain 157 fuel assemblies with each fuel assembly containing 264 fuel rods clad with Zircaloy 4. Each fuel rod shall have a nominal active fuel length of 144 inches and contain a maximum total weight of 1780 grams uranium.
The inillal core loading shal. have a maximum enrichment of 3.2 welght percent U 235.
Roload fuel shall be similar in physical design to the initial coro loading and shall have a maximum ontichment of 4.3 weight porcent U 235.
CONTROL ROD ACSEPEUES 5.3.2 The reactor core shall contain 48 full length control rod assemblios. The full length control rod assemblies shall coniain a nominal 142 inches of absorber material.
The nominal values of absorber material shall be 80 percent silver,15 percent indium and 5 percent cadmium. All control rods shall be clad with stainless steel tubing.
5.4 REACTORCOOLAMTSYSTEld DES'GN PRESSURE AND TEMPERATURE 5.4.1. The reactor coolant system is designed and shall be maintainod:
- a. In accordance with the code requirements specified in Section 5.2 of the FSAR, with allowance for normal degradation pursuant to the applicable Surveillance Requirements,
- b. For a pressure of 2485 psig, and
- c. For a temperature of 650'F, except for the pressurizer which is 680'F.
VOLUME 5.4.2 The total water and steam volume of the reactor coolant system is approximately 10,000 cubic feet at nominal operating conditions.
NORTH ANNA - UNIT 2 5-4 Amendment No.
gp:$%
7 1--
9 N
' V. ,
Attachment 3
-10. CFR 50.92, Significant Hazards Consideration-North Anna Units 1 and 2 n
Y f
y, Virginia Electric and Power Company
..t. ?
A. ---_-_____w_-s __.__e... .m.._ _
j '
10 CFR 50.92 SIGlilFICANT HAZARDS CONSIDERATION REVIEW Virginia Electric and Power Company proposes to revise the Technical Specifications for its North Anna Power Station, Units 1 and 2, by revising the description of the Reactor Coolant System (RCS) volume in the design features.
The RCS volume in Technical Specification 5.4.2 will chango from ".. 9957110 cubic feet at a nominal Tavg of 525 F" to "...approximately 10,000 cubic feet at nominal operating conditions." The reference to the RCS volumn of 9957 cubic feet in the bases for Technical Specification 3/4.1.1.3 on Boron Dilution will be deleted.
NUREG 0452, " Standard Technical Specifications for Westinghouse PWRs,
Revision 4, (STS) provides guidance to licensees when preparing Technical Specifications. One design feature specified in the STS is the RCS volume. A calculated RCS volume was obtained from the reactor vendor and included in the North Anna Technical Specifications consistent with STS guidance.
However, that calculated volume is not used in accident analyses. Rather, the transient system models used to perform accident analyses divide the RCS into component mass energy cells for which volumes are specified. The definition and volume of these mass energy cells '/ary depending on the model used and the accident being analyzed. Thus, the methodology does not require that a single total RCS volume be specified as an accident analysis basis and revising the current description would have no significant effect on safety.
Technical Specification 5.4.2, as currently worded, also may be somewhat confusing. It refers to a Tavo that is significantly lower than normal operating conditions. Also, citing an RCS volume at a Tava of 525 F provides insufficient information for meeting a tolerance of plus or minus ten cubic feet. Other parameters, cuch as system pressure and pressurizer temperature, are also required to calculate the volume to within ten cubic feet. Those parameters are not clearly defined since the citad Tavg is not based on normal operating conditions.
Technical Specificatier 3/4.1.1.3 requires the flow rate cf reactor coolant through the RCS to be 2. 3000 gpm when a reduction in RCS boron concentration is being made. The bases for Technical Specification 3/4.1.1.3 state that the minimum flow rate of at least 3000 gpm provides adequate mixing, prevents stratification and ensures that reactivity change will be gradual during boron concentration reductions in the RCS. 't then states that a flow rate of at least 3000 gpm will circulate an equivalent RCS volume of 9957 cubic feet in approximately 30 minutes, it is proposed that the phase "will circulate an equivalent Reactor Coolant System volume of 9957 cubic feet" be changed to "will circulate the Reactor Coolant System volume." Deleting the phrase does not alter the meaning of the bases and eliminates a potential conflict with the revised design feature.
l l
VirgInla Electric and Power Company has reviewed the proposed changes to the Technical Specifications against the criteria of 10 CFR 50.92 and has concluded that the proposed changes do not pose a significant hazards corsideration. This determination was based on the following points:
- 1. The proposed changes do not involve a significant increase in the probability or consequences of an accident prev!ously evaluated.
Revising the description of the RCS volume in the design features of the Technical Specifications has no impact on the probability of any accident prev'ously evaluated because total RCS volume in not used in any accident analysis.
- 2. The proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated. The proposed changes do not involve any change to plant design or methods of operation. The proposed changes do not involve operation of any plant equipment in a manner different from that in which it was designed to be operated. Since a new failure mode is not created, a new or ,
different type of accident is not made possible.
- 3. The proposed changes do not involve a significant reduction in a marg'n of safety. The proposed changes do not involve any changes to safety limits or limiting safety system settings. Neither setpoints nor operating parameters are- affected by the proposed changes.
Therefore, no significant reductions in a margin of safety occur as a result of the proposed changes.
Virginia Electric and Power Company concludes that the activities associated with these proposed Technical Specification changes satisfy the no significant hazards consideration standards of 10 CFR 50.92 (c) and, accordingly, a no significant hazards consideration finding is justified.
I k
I.
l l
. -. -