Crbr EIS Update, Monthly Progress Rept for May 1982
ML20076C119
Person / Time
Site: Clinch River
Issue date: 06/17/1982
From: Nelson I
Battelle Memorial Institute, PACIFIC NORTHWEST NATION
To: Lowenberg H
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20076B704 List:
References
FOIA-82-290 NUDOCS 8210070318
Download: ML20076C119 (3)


Text

...7 g) ],

OBallelle Pacific Northwest Laboratories P.O. Box 999 Richland, Washington U.S.A 99352 Telephone 15091375-6813 Telex 15-2874 June 17, 1982 Mr. Homer Lowenberg, Chief Engineer Office of Nuclear Materials Safety and Safeguards U.S. Nuclear Reaulatory Comission Washinnton, D.C. 20555 .

Dear Homer:

t'.Af MONTHLY REPORT ON CRBRP EIS UPDATE Attached is the May monthly report for the CRBRP update. Please contact me on FTS 509-375-6813 if you have any questions.

Very truly yours, N s __I_ s I. C. Nelson Project Manager ICN:va cc: Office of the Director, NMSS (Attn: Program Support Branch) t l

l l

l f8d10070319 820716 3 i PDR FDIA W ISS82-290 PDR .

1- ;

1 CLINCH RIVER BREEDER REACTOR EIS UPDATE LPEDGRESS DURING.MAY:

Task 1 - Review Environmental Report .

Another version of Amendment XIV (previously Amendment XIII) was received

-and reviewed.

Task 2 - Prepare Draft Sections of EIS Supplement' The second draft of Appendix D Environmental Effects of the Fu 1 Cycle, Transportation, and Waste Management,. Appendix E - Safeguards, and various sec-tions in Chapters 5 and 7 was transmitted to NRC on May 7,.1982. PNL fuel cycle,-

transportation, waste management, and safeguards staff met with NRC to incor-porate NRC comments 6n.the second draft on May 12-13, 1982. As a result of this working meeting, a third draft was transmitted May 17,~1982. . Further modi-fication was made to this draft and-a final draft was transmitted on May 24,'1982.

  • Task 3 - Respond to Public Canments and Prepare Draft Sections of Final EIS Sucolement-It is expected that the EIS Supplement will not be distributed for public comment. Present plans call for the project to proceed to Task 4.

Task 4 - Provide Public Hearing Testimony and Support Work on this task is projected to begin in mid-July, 1982 with the prepa-ration of written hearing testimony. Actual hearings are scheduled to commence in the late August - early September time frame. At.this point, the Task 3 effort will be transferred to Task 4 and a more refined estimate of Task 4 will occur when the task is better defined.

PERSONNEL TIME EXPENDITURES:

Expenditure of time, during May by PNL staff involved with the project is as follows:

Staff Hours I. C. Nelson 109 K. M. Byers 92 C. E. Geffen 134
0. F. Hill 132 R. F. McCallum 51 D. R. Payson 95 P. T. Reardon 126 F. P.-Roberts 24

- R. J. Sorenson 26 D. L. Strenge 19 Secretarial /0ther 340 TOTAL 1148

. CO'STS AND UNC0STED OBLIGATIONS:

Costs l'ncurred during May ' totaled approximately $67K. _The' cumulative to date total is-$170K._ An estimate of costs which are expected to;be incurred from June September 30, 1982 is shown below.

Month Expected Excenditure-($K)

June 18 July 2 -

' August 5

-September. S .

MILESTONES:

A milestone schedule for the project is outlined below. This schedule assumes-that PNL will not be providing responses to comments made on the draft EIS update. .

Month Milestone

- April 14 Second NRC/PNL working meeting, rev'iew of pre-liminary draft EIS update May 12, 13 Third NRC/PNL working meeting - further review of EIS update May 24 PNL submit final EIS draft update to NRC. .(May 24-June 16 PNL will assist NRC as required.

June 16 EIS update ready for printing .

August 24 . Start public hearings i