ML20080F654

From kanterella
Revision as of 03:18, 22 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Cycle 16 Reload Evaluation Rept for Fcs,Unit 1. Rept Provides Evaluation of Core Design & Performance for Operation During Cycle 16
ML20080F654
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/20/1995
From: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20080F659 List:
References
LIC-95-0001, LIC-95-1, NUDOCS 9501300120
Download: ML20080F654 (1)


Text

_ - _ - - _ - - _ _ _ __----

! Omaha Pubuc Power District P.O. Box 399 Hwy. 75 North of Pt. Calhoun Fort Calhoun. NE 680234399 402/636-2000 l

l l

l January 20, 1995 LIC-95-0001 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, DC 20555

Reference:

Docket No. 50-285 Gentlemen:

SUBJECT:

Fort Calhoun Station (FCS) Cycle 16 Reload Evaluation Report Enclosed for your information is the Cycle 16 Reload Evaluation Report for Fort Calheun Station Unit No. 1. This report provides an evaluation of core design and performance for operation during Cycle 16. Operating limit changes will be accommodated through revision of the Core Operating Limits Report contained in the FCS Operating Manual.

Please contact me if you have any questions.

S ncerely, l #

()

T. i.. Patterson Division Manager Nuclear Operations TLP/tcm Enclosure c: LeBoeuf, Lamb, Greene & MacRae (w/o enclosure)

L. J. Callan, NRC Regional Administrator, Region IV (w/o enclosure)

R. P. Mullikin, NRC Senior Resident inspector (w/o enclosure) t S. D. Bloom, NRC Project Manager 30003,; T l

assuo 9501300120 DR 950120 ' I ADOCK 05000285 (

PDR

.s