ML20086G188

From kanterella
Revision as of 12:04, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards ISI Rept for Activities Performed at Plant from 931210 to 950429,including Fifth Refueling Outage
ML20086G188
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/10/1995
From: Phares R
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086G197 List:
References
L30-95(07-10)LP, L30-95(7-10)LP, NUDOCS 9507140162
Download: ML20086G188 (1)


Text

. . . . . ..

=

lihnois Power Company Cisnton Power Station i P.O. Box 678

, Chnion. IL 61727 Tel 217 935-8881 U-602465 R L30 95(07 -10 )LP 1 A.120 July 10, 1995 Docket No. 50-461 Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Clinton Power Station t

Inservice Inspection Summary Report

Dear Sir:

In accordance with ASME Section XI, Article IWA-6000, Illinois Power Company (IP) submits the enclosed Inservice Inspection Summary Report. This summary report addresses the

[

- Inservice Inspection activities performed at Clinton Power Station from December 10,1993 to April 29,1995 including the fifth refueling outage.

E Sincerely yours, Db Ar s Richard F. Phares Director, Licensing AJP/kdk Enclosure i cc: NRC Clinton Licensing Project Manager NRC Resident Oflice, V-690 Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety

'I I

! .3 I i 3 3 9507140162 950710 PDR ADOCK 05000461 Q PDR

- , . _