Category:Letter type:CPSES
MONTHYEARCPSES-201001000, Operator Licensing Examination Data, Form 5362010-07-28028 July 2010 Operator Licensing Examination Data, Form 536 CPSES-200901377, Operator Licensing Examination Data2009-09-29029 September 2009 Operator Licensing Examination Data CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.2007-11-15015 November 2007 Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-10-22022 October 2007 Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0909 October 2007 Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0202 October 2007 Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data2007-08-29029 August 2007 Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2007-08-28028 August 2007 Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval)2007-08-22022 August 2007 Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits2007-08-16016 August 2007 Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..2007-08-16016 August 2007 License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 20082007-08-0303 August 2007 Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 CPSES-200701284, (Cpses), Operator Licensing Examination Data2007-08-0202 August 2007 (Cpses), Operator Licensing Examination Data CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 72007-07-20020 July 2007 Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-07-18018 July 2007 Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)2007-07-17017 July 2007 Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-06-21021 June 2007 Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-0092007-06-19019 June 2007 (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 CPSES-200701059, Submittal of Startup Report, Cycle 132007-06-13013 June 2007 Submittal of Startup Report, Cycle 13 CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves2007-05-22022 May 2007 License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves CPSES-200700915, Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability2007-05-0707 May 2007 Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability CPSES-200700871, Transmittal of Year 2006 Radioactive Effluent Release Report2007-04-30030 April 2007 Transmittal of Year 2006 Radioactive Effluent Release Report CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 20062007-04-27027 April 2007 Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change2007-04-18018 April 2007 Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change CPSES-200700719, Nuclear Liability Insurance2007-04-10010 April 2007 Nuclear Liability Insurance CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report2007-04-10010 April 2007 License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses2007-04-0505 April 2007 Evaluation of Pressurizer Weld Overlay Confirmatory Analyses CPSES-200700691, Core Operating Limits Report, Cycle 132007-04-0404 April 2007 Core Operating Limits Report, Cycle 13 CPSES-200700663, Transmittal of the Annual Radiological Environmental Operating Report for 20062007-03-30030 March 2007 Transmittal of the Annual Radiological Environmental Operating Report for 2006 CPSES-200700607, Property Damage Insurance2007-03-29029 March 2007 Property Damage Insurance CPSES-200700606, Decommissioning Report2007-03-29029 March 2007 Decommissioning Report CPSES-200700573, Request to Withdraw Relief Request A-72007-03-22022 March 2007 Request to Withdraw Relief Request A-7 CPSES-200700571, Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186)2007-03-19019 March 2007 Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186) CPSES-200700515, Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-03-0909 March 2007 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data2007-02-28028 February 2007 Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data CPSES-200700451, Annual Operating Report for 20062007-02-28028 February 2007 Annual Operating Report for 2006 CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports2007-02-22022 February 2007 Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)2007-02-22022 February 2007 Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-02-20020 February 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20062007-02-0808 February 2007 Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date..2007-02-0202 February 2007 Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-01-30030 January 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power2007-01-29029 January 2007 Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)2007-01-24024 January 2007 Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-01-18018 January 2007 License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2007-01-18018 January 2007 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature2007-01-10010 January 2007 Annual Report of Changes in Peak Cladding Temperature CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.2006-12-19019 December 2006 License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.2006-12-19019 December 2006 License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. 2010-07-28
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2023-09-14014 September 2023 (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-0012023-04-19019 April 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300135, License Renewal Application Revision 0 - Supplement 12023-04-0606 April 2023 License Renewal Application Revision 0 - Supplement 1 CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications2022-11-21021 November 2022 (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022022-11-21021 November 2022 Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202200350, Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report2022-10-0303 October 2022 Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report ML22192A0072022-08-22022 August 2022 Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-07-20020 July 2022 Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CP-202200006, (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended.2022-02-17017 February 2022 (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended. CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-02-15015 February 2022 Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100575, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-08-31031 August 2021 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100251, (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-07-27027 July 2021 (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100394, Supplement to License Amendment Request (LAR) 20-0062021-07-13013 July 2021 Supplement to License Amendment Request (LAR) 20-006 CP-202100065, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-05-11011 May 2021 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b CP-202000585, (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump2021-01-27027 January 2021 (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump CP-202000584, (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING2020-12-0909 December 2020 (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING CP-202000575, (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating2020-11-19019 November 2020 (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating CP-202000365, Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump2020-08-31031 August 2020 Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump CP-202000401, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-28028 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000388, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-16016 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000321, (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time2020-07-0202 July 2020 (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time CP-202000305, (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-06-24024 June 2020 (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water TXX-2002, Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program2020-04-10010 April 2020 Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program CP-201900368, Revision to Technical Specifications 3.8.1, AC Sources - Operating2020-03-31031 March 2020 Revision to Technical Specifications 3.8.1, AC Sources - Operating CP-202000016, Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2020-01-16016 January 2020 Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. CP-201900393, License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation2019-11-0707 November 2019 License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation CP-201900415, License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-11-0707 November 2019 License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program CP-201800115, License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation2018-03-29029 March 2018 License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation ML17074A4942017-04-13013 April 2017 Issuance of Amendment Nos. 168 and 168 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML16351A2002016-12-14014 December 2016 Submittal of License Amendment Request 16-003, Administrative Change to License Name CP-201600216, License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing.2016-04-27027 April 2016 License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. CP-201501062, ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments2015-11-12012 November 2015 ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments CP-201400165, (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule2014-02-0404 February 2014 (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule CP-201301322, License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule2013-11-21021 November 2013 License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule CP-201301065, Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2013-08-29029 August 2013 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process CP-201300738, License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item..2013-07-10010 July 2013 License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item.. CP-201300257, License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals.2013-03-28028 March 2013 License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals. CP-201300083, License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals.2013-01-15015 January 2013 License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals. CP-201200518, License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits2012-10-0202 October 2012 License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits CP-201200552, License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-12012-07-12012 July 2012 License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1 CP-201200012, (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent ....2012-03-28028 March 2012 (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent .... CP-201101038, License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled2011-08-0101 August 2011 License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled 2024-01-31
[Table view] |
Text
V TXU TXU Energy C. Lance Terry Ref: 10CFR50.90 Comanche Peak Steam Senior Vice President & Principal Nuclear Officer Electric Station P. O. Box 1002 (E01)
Glen Rose, TX 76043 Tel: 254 897 8920 Fax: 254 897 6652 lance.terry@txu.com CPSES-200200415 Log # TXX-02033 File # 00236 March 27, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 LICENSE AMENDMENT REQUEST (LAR) 02-04 REVISION TO TECHNICAL SPECIFICATION (TS) 5.3, "Unit Staff Qualifications" Gentlemen:
Pursuant to 10CFR50.90, TXU Generation Company LP (TXU Energy) hereby requests an amendment to the CPSES Unit 1 Operating License (NPF-87) and CPSES Unit 2 Operating License (NPF-89) by incorporating the attached change into the CPSES Unit 1 and 2 Technical Specifications. This change request applies to both units.
The proposed change will revise TS 5.3 entitled "Unit Staff Qualifications." This amendment application would revise Technical Specification 5.3, "Unit Staff Qualifications," to revise requirements that have been superseded due to the accreditation of the licensed operator training program by the Institute for Nuclear Power Operations and promulgation of the revised 10CFR55, "Operators' Licenses",
which became effective on May 26, 1987.
Attachment 1 provides a detailed description of the proposed changes, a safety analysis of the proposed changes, TXU Energy's determination that the proposed changes do not involve a significant hazard consideration, a regulatory analysis of the proposed changes and an environmental evaluation. Attachment 2 provides the affected Technical Specification pages marked-up to reflect the proposed changes.
Attachment 3 provides retyped Technical Specification pages which incorporate the requested changes. Attachment 4 provides marked-up pages of the Final Safety Analysis Report (for information only) to reflect the proposed changes to the FSAR.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance ý O )
Callaway
- Diablo Canyon - Palo Verde o South Texas Project
VATXU TXX-02033 Page 2 of 3 TXU Energy requests approval of the proposed License Amendment by September 1, 2002, to be implemented within 30 days of issuance of the license amendment. This approval date was selected in order to support the continued processing of candidates for the operator license examination scheduled to begin on November 8, 2002. The proposed Technical Specification change provides the needed flexibility for candidates to complete the licensed operator training program who meet the experience eligibility requirements of an accredited program consistent with 10CFR55.31, "How to apply," but who may not meet the American National Standards Institute (ANSI) or ANSI/American Nuclear Society (ANS) or Regulatory Guide 1.8, Revision 2, "Qualification and Training of Personnel for Nuclear Power Plants," experience requirements referenced in the current Technical Specification 5.3.1.
In accordance with 10CFR50.91(b), TXU Energy is providing the State of Texas with a copy of this proposed amendment.
This communication contains no new or revised commitments.
Should you have any questions, please contact Mr. Robert A. Slough at (254) 897 5727 I state under penalty of perjury that the foregoing is true and correct.
Executed on March 27, 2002.
Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner C. L. Terry Senior Vice President and Principal Nuclear Officer By: _ _ _-_ _
Ro'eg UWalker try Regulatory Affairs Manager
t TXU TXX-02033 Page 3 of 3 RAS/ras Attachments 1. Description and Assessment
- 2. Markup of Technical Specifications pages
- 3. Retyped Technical Specification Pages
- 4. Proposed FSAR changes (for information) c - E. W. Merschoff, Region IV William D. Johnson, Region IV D. H. Jaffe, NRR Resident Inspectors, CPSES Mr. Authur C. Tate Bureau of Radiation Control Texas Department of Public Health 1100 West 49th Street Austin, Texas 78704
ATTACHMENT 1 to TXX-02033 DESCRIPTION AND ASSESSMENT to TXX-02033 Page 1 of 8 LICENSEE'S EVALUATION
- 1. DESCRIPTION
- 2. PROPOSED CHANGE
- 3. BACKGROUND
- 4. TECHNICAL ANALYSIS
- 5. REGULATORY SAFETY ANALYSIS 5.1. No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/criteria
- 6. ENVIRONMENTAL CONSIDERATION
- 7. REFERENCES to TXX-02033 Page 2 of 8
1.0 DESCRIPTION
By this letter, TXU Generation Company LP (TXU Energy) requests an amendment to the CPSES Unit 1 Operating License (NPF-87) and CPSES Unit 2 Operating License (NPF-89) by incorporating the attached change into the CPSES Unit 1 and 2 Technical Specifications. Proposed change LAR-02-04 is a request to revise Technical Specifications (TS) 5.3, "Unit Staff Qualifications" for Comanche Peak Steam Electric Station (CPSES) Units 1 and 2. This amendment request would revise TS 5.3 to revise requirements that have been superseded due to the accreditation of the licensed operator training program by the Institute for Nuclear Power Operations and promulgation of the revised 10CFR55, "Operators' Licenses", which became effective on May 26, 1987 (Reference 1).
Proposed FSAR change (for information only): See Attachment 4
2.0 PROPOSED CHANGE
The proposed change would revise TS 5.3.1 to specify an exception that requires licensed operators to comply with the requirements of Regulatory Guide 1.8, "Qualification and Training of Personnel for Nuclear Power Plants", Revision 3 rather than Revision 2.
Specification 5.3.1 will be revised to state:
Each member of the unit staff, with the exception of Licensed Operators and Senior Operators, shall meet or exceed the minimum qualifications of Regulatory Guide 1.8, Revision 2, 1987.
The following new Technical Specification 5.3.2 will be added:
Licensed Operators and Senior Operators shall meet or exceed the minimum qualifications of Regulatory Guide 1.8, Revision 3, May 2000.
The current Specification 5.3.2 will be renumbered to 5.3.3.
The proposed Technical Specification change provides the needed flexibility for license candidates to complete the licensed operator training program who meet the experience eligibility requirements of an accredited program consistent with 10CFR55.31, "How to apply", but who may not meet the American National Standards Institute (ANSI) or ANSI/American Nuclear Society (ANS) or Regulatory Guide 1.8, Revision 2, "Qualification and Training of Personnel for Nuclear Power Plants," experience requirements referenced in the current Technical Specification 5.3.1.
to TXX-02033 Page 3 of 8
3.0 BACKGROUND
On March 20, 1985, the NRC issued the Commission Policy Statement on Training and Qualification of Nuclear Power Plant Personnel (Reference 2) which endorsed the training accreditation program developed by the Institute for Nuclear Power Operations (INPO), in association with its National Academy for Nuclear Training (NANT).
Subsequently, in NRC Generic Letter 87-07, "Information Transmittal of Final Rulemaking for Revisions to Operator Licensing 10CFR55 and Conforming Amendments," (Reference 3) and NUREG- 1262, "Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses," (Reference 4), the NRC indicated it would accept a licensee's licensed operator training program if it is accredited and based on a systematic approach to training. This accreditation obviates the need to conform to the guidance of either ANSI NI 8.1-1971 (Reference 5) or ANSI/ANS 3.1-1978 (Reference 6). Reference 4 notes that References 5 and 6 may be superseded by INPO accreditation in accordance with the revised 10CFR55, and that licensees may submit a request to the NRC for an administrative change to their Technical Specifications to revise or delete, as appropriate, the TS requirements which have been superseded.
In addition, the NRC has published NRC Regulatory Issue Summary 2001-01, "Eligibility of Operator License Applicants," dated January 18, 2001 (Reference 7), "...to familiarize addressees with the NRC's current guidelines for the qualification and training of reactor operator (RO) and senior operator (SO) license applicants." This document again acknowledges that 10CFR55.31(a)(4), as amended on March 25, 1987, states that, "...the Commission may accept a certification that the applicant has successfully completed a Commission-approved training program that is based on a systems approach to training ...." Regulatory Issue Summary (RIS) 2001-01 further makes the following statements:
"...a facility licensee's training program would be considered approved by the NRC when it is accredited by the National Nuclear Accrediting Board (NNAB)."
"The fact that every licensee has voluntarily obtained and periodically renewed the accreditation of its licensed operator training program suggests that every facility licensee is implementing the experience and education guidelines endorsed by the NNAB. The NRC staff understands that the current version of those guidelines are outlined by the National Academy for Nuclear Training (NANT) in its 'Guidelines for Initial Training and Qualification of Licensed Operators,' (NANT 2000 guidelines) which were issued in January 2000."
"... the NANT's guidelines for education and experience (those that were in effect in 1987 or those that were issued in January 2000) outline acceptable methods for implementing the Commission's regulations in this area."
"The staff encourages all facility licensee's to review their requirements and commitments related to RO and SO education and experience and to update their documentation (e.g., FSAR, TS, and training program descriptions) to enhance consistency and minimize confusion."
to TXX-02033 Page 4 of 8
4.0 TECHNICAL ANALYSIS
Licensed operator qualifications and training can have an indirect impact on accidents previously evaluated. However, the NRC considered this impact during the rulemaking process, and by promulgation of the revised 10CFR55 rule, determined that this impact remains acceptable when licensees have an accredited licensed operator training program that is based on a systems approach to training. The NRC has concluded in References 4 and 7 that the standards and guidelines applied by INPO in their training accreditation program are equivalent to those put forth or endorsed by the NRC. Therefore, maintaining an INPO accredited, systems based licensed operator training program is equivalent to maintaining an NRC approved licensed operator training program which conforms with applicable NRC Regulatory Guides or NRC endorsed industry standards.
The licensed operator qualification and training program will continue to comply with the requirements of 10CFR55. The TXU Energy licensed operator training program is accredited by INPO and is based on a systems approach to training.
Since the proposed TS change is administrative in nature, it does not affect plant design, hardware, system operation, or procedures.
Based on the above discussion, the proposed TS change is consistent with IOCFR55 and does not adversely affect nuclear safety or plant operations.
5.0 REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration TXU Energy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10CFR50.92, "Issuance of amendment," as discussed below:
- 1. Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed TS change is an administrative change to clarify the current requirements for licensed operator qualifications and licensed operator training program. These changes conform to the current requirements of 10CFR55. The TS requirements for all other unit staff qualifications remain unchanged.
Although licensed operator qualifications and training may have an indirect impact on accidents previously evaluated, the NRC considered this impact during the rulemaking process, and by promulgation of the revised 10CFR55 rule, concluded that this impact remains acceptable as long as the licensed operator training program is certified to be accredited and is based on a systems approach to training. TXU Energy's licensed to TXX-02033 Page 5 of 8 operator training program is accredited by INPO and is based on a systematic approach to training.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed TS change is an administrative change to clarify the current requirements for licensed operator qualifications and licensed operator training program and to conform to the revised 10CFR55. The TS requirements for all other unit staff qualifications remain unchanged.
As noted above, although licensed operator qualifications and training may have an indirect impact on the possibility of a new or different kind of accident from any accident previously evaluated, the NRC considered this impact during the rulemaking process, and by promulgation of the revised rule, concluded that this impact remains acceptable as long as the licensed operator training program is certified to be accredited and based on a systems approach to training. As previously noted,TXU Energy's licensed operator training program is accredited by INPO and is based on a systems approach to training.
Additionally, the proposed TS change does not affect plant design, hardware, system operation, or procedures. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed TS change is an administrative change to clarify the current requirements applicable to licensed operator qualifications and licensed operator training program. This change is consistent with the requirements of 10CFR55. The TS qualification requirements for all other unit staff remain unchanged.
Licensed operator qualifications and training can have an indirect impact on a margin of safety. However, the NRC considered this impact during the rulemaking process, and by promulgation of the revised 10CFR55, determined that this impact remains acceptable when licensees maintain a licensed operator training program that is accredited and based on a systems approach to training. As noted previously, TXU Energy's to TXX-02033 Page 6 of 8 licensed operator training program is accredited by INPO and is based on a systems approach to training.
The NRC has concluded, as stated in NUREG-1262, "Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses," that the standards and guidelines applied by INPO in their training accreditation program are equivalent to those put forth or endorsed by the NRC. As a result, maintaining an INPO accredited, systems approach based licensed operator training program is equivalent to maintaining NRC approved licensed operator training program which conform with applicable NRC Regulatory Guides or NRC endorsed industry standards. The margin of safety is maintained by virtue of maintaining an INPO accredited licensed operator training program.
In addition, the NRC has recently published NRC Regulatory Issue Summary 2001-01, "Eligibility of Operator License Applicants," dated January 18, 2001, "to familiarize addressees with the NRC's current guidelines for the qualification and training of reactor operator (RO) and senior operator (SO) license applicants." This document again acknowledges that the INPO National Academy for Nuclear Training (NANT) guidelines for education and experience, outline acceptable methods for implementing the NRC's regulations in this area.
Therefore, the proposed changes do not involve a significant reduction in a margin of safety.
Based on the above, TXU Energy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c) and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatory Requirements/Criteria 10 CFR 55.4 defines systems approach to training to mean a training program that includes the following five elements:
(1) Systematic analysis of the jobs to be performed.
(2) Learning objectives derived from the analysis which describe desired performance after training.
(3) Training design and implementation based on the learning objectives.
(4) Evaluation of trainee mastery of the objectives during training.
(5) Evaluation and revision of the training based on the performance of trained personnel in the job setting.
10CFR55.31 (a)(4) specifies in part that the Commission may accept certification that the applicant has successfully completed a Commission-approved training program that is based on a systems approach to training and that uses a simulation facility acceptable to the Commission under 10 CFR 55.45(b). NRC Generic Letter 87-07 and NUREG-1262, to TXX-02033 Page 7 of 8 indicated that the NRC would accept a licensee's licensed operator training program if it is accredited and based on a systems approach to training.
The TXU Energy licensed operator training program is accredited by INPO and is based on a systems approach to training. The licensed operator qualifications and training program will continue to comply with the requirements of 10CFR55.
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
TXU Energy has evaluated the proposed TS change request consistent with the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10CFR51.21, "Criteria for and identification of licensing and regulatory actions requiring environmental assessments." TXU Energy has determined that this proposed TS change request meets the criteria for a categorical exclusion set forth in paragraph (c)(10) of 10CFR51.22, "Criterion for categorical exclusion; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review." This determination is based on the fact that this change is being proposed as an amendment to a license issued pursuant to 10CFR50, "Domestic Licensing of Production and Utilization Facilities," and it changes recordkeeping, reporting, or administrative procedures or requirements. Therefore, pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the proposed amendment.
to TXX-02033 Page 8 of 8
7.0 REFERENCES
- 1. Volume 52, Federal Register, Page 9453 (52 FR 9453), dated March 25, 1987.
- 2. "Commission Policy Statement on Training and Qualification of Nuclear Power Plant Personnel," 50 FR 11147, dated March 20, 1985.
- 3. NRC Generic Letter 87-07, "Information Transmittal of Final Rulemaking for Revisions to Operator Licensing 10 CFR 55 and Conforming Amendments," dated March 19, 1987.
- 4. NUREG-1262, "Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55, "Operators' Licenses," published November 1987.
- 5. ANSI N18.1-1971, "Selection and Training of Nuclear Power Plant Personnel."
- 6. ANSI/ANS 3.1- 1978, "Selection, Qualification and Training of Personnel for Nuclear Power Plants.
- 7. NRC Regulatory Issue Summary 2001-01, "Eligibility of Operator License Applicants,"
dated January 18, 2001.
ATTACHMENT 2 to TXX-02033 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)
Page TS 5.0-5 to TXX-02033 Unit Staff Qualifications Page 1 of I 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications 5.3.1 Each member of the unit staf,,/with the exception of licensed Senior Reacto OperatoarnsSROy pd licensed Reactor OPerators (RO).a-i meet or exceed tJe minimum quaalifications of Regulatory Guide 1.8, Revision 2, 1987.
Revision 3, May 2000.
5.3@ For the purposes of 1 OCFR55.4, a licensed Senior Reactor Operator (SRO) and a licensed reactor operator (RO) are those individuals who, in addition to meeting the requirements of TS 5.3@"* perform the functions described in 10CFR50.54(m).
COMANCHE PEAK - UNITS 1 AND 2 5.0-5 Amendment Noýý4x
ATTACHMENT 3 to TXX-02033 RETYPED TECHNICAL SPECIFICATION PAGES Pages TS 5.0-5 to TXX-02033 Unit Staff Qualifications Page 1 of 1 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications 5.3.1 Each member of the unit staff, with the exception of licensed Senior Reactor Operators and licensed Reactor Operators, shall meet or exceed the minimum qualifications of Regulatory Guide 1.8, Revision 2, 1987.
5.3.2 Licensed Senior Reactor Operators (SRO) and licensed Reactor Operators (RO) shall meet or exceed the minimum qualifications of Regulatory Guide 1.8, Revision 3, May 2000.
5.3.3 For the purposes of 10CFR55.4, a licensed Senior Reactor Operator (SRO) and a licensed reactor operator (RO) are those individuals who, in addition to meeting the requirements of TS 5.3.2, perform the functions described in 10CFR50.54(m).
COMANCHE PEAK - UNITS 1 AND 2 5.0-5 Amendment No. XX
ATTACHMENT 4 to TXX-02033 PROPOSED FSAR CHANGES (FOR INFORMATION ONLY)
Pages 13.1-13 Table 13.1-1 to TXX-02033 Page 1 of 2 CPSES/FSAR 13.1.2.2 Supervisory Succession The Plant Manager (see Section 13.1.1.2.1) is responsible for the operation of CPSES. If the Plant Manager is absent or becomes incapacitated, then, unless otherwise designated, the following station staff assume the subject responsibilities in the order listed:
- 1. Operations Manager
- 2. Maintenance Manager During back shift and weekend periods when the station staff is not on site, the Shift Manager is responsible for all activities at CPSES.
13.1.2.3 Shift Crew Composition The minimum on-duty shift complement for various modes of single and dual unit operation is shown in Table 13.1-2 and is as follows:
Two USNRC Licensed Operators should be in the Control Room for each reactor while undergoing a start-up, scheduled shutdown or reactor trip recovery.
With two units licensed to operate (Both Units in Mode 5 or 6), each shift crew shall have at least six members, including one Shift Manager and two USNRC Licensed Operators.
With two units licensed to operate and one or both operating (Mode 1, 2, 3, 4), each crew shall have at least eight members, including one Shift Manager, one Unit Supervisor and three USNRC Licensed Operators.
An organization chart for CPSES for one and two unit operation is provided in Figure 13.1-3.
13.1.3 QUALIFICATION REQUIREMENTS FOR PLANT PERSONNEL 13.1.3.1 Minimum Qualification Requirements The minimum ualification re uirements fo licensed Senior Reactor b(*_era nd Reactor Operators re in accordance with Regulatory Guide 1.8 %3vtJand are ispaye in a e .1- . All other plant personnel minimum qualification requirements are in accordance with Regulatory Guide 1.8, Revision a risplayed in Table 13.1 P).
13.1.3.2 Qualifications of Plant Personnel Resumes of current key operating organization personnel are provided in Appendix 13.1A.
13.1-13 AMENDMENT 97 February 1, 2001 to TXX-02033 Page 2 of 2 CPSES/FSAR TABLE 13.1-1 (Sheet 1 of 3)
MINIMUM QUALIFICATIONS OF PLANT PERSONNEL IN ACCORDANCE WITH REGULATORY GUIDE 1.8, REVISION 2 NOTE:
(1) Recommended, but not required (2) Recommended in addition to experience (3) Experience required to independently perform job (4)* In accordance with Regulatory Guid 1.8, Revision 3, May 2000 VICE PRESIDENT of NUCLEAR OPERATIONS OR PLANT MANAGER OPERATIONS MANAGER MAINTENANCE MANAGER MAINTENANCE DEPARTMENT MANAGERS SHIFT OPERATIONS MANAGER SHIFT MANAGER SENIOR REACTOR OPERATOR SHIFT TECHNICAL ADVISOR REACTOR OPERATOR PLANT EQUIPMENT OPERATOR Amendment 97 February 1, 2001