|
---|
Category:Technical Specification
MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass2005-11-30030 November 2005 Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass 2023-05-25
[Table view] Category:Amendment
MONTHYEARRA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass2005-11-30030 November 2005 Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass ML0522003672005-08-0202 August 2005 Technical Specification Pages Re Bases Control Program (Tac No. MC3636) ML0511102212005-04-19019 April 2005 Enclosure, Amendment No. 204 on TS Revisions to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Report Requirements (Tac No. MC5129) RNP-RA/05-0005, Request for Technical Specifications Change to Section 3.8.4, DC Sources - Operating2005-02-14014 February 2005 Request for Technical Specifications Change to Section 3.8.4, DC Sources - Operating ML0405707022004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.3-20 Through 3.3-28 for Amendment 176 ML0405706622004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.3-1 Through 1.3-13 for Amendment 176 ML0405706652004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.1-1 Through 1.2-3 for Amendment 176 ML0405706702004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.4-1 Through 1.4-4 for Amendment 176 ML0405706752004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Operating License Effective Pages Through Technical Specifications Effictive Pages ML0405706832004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Table of Contents for Amendment 176 ML0405706872004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 2.0-1 Through 2.0-2 for Amendment 176 ML0405706912004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.0.1 Through 3.0.5 for Amendment 176 ML0405706942004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.1-1 Through 3.1-21 for Amendment 176 ML0405706962004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.2-1 Through 3.2-14 for Amendment 176 ML0405706992004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.3-1 Through 3.3-19 for Amendment 176 ML0407804992004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.6-1 Through 3.6-21 for Amendment 176 ML0407805072004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 5.0-1 Through 5.0-34 for Amendment 176 ML0407805052004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 4.0-1 for Amendment 176 Through 4.0-3 for Amendment 198 ML0407805042004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.9-1 Through 3.0-12 for Amendment 176 ML0407805022004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.8-1 for Amendment 176 Through 3.8-36 for Amendment 190 ML0407805002004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.7-1 Through 3.7-33 for Amendment 176 ML0405707052004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Techncial Specification Pages 3.3-29 Through 3.3-32 for Amendment 176 ML0407804962004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.5-1 Through 3.5-11 for Amendment 176 ML0407804942004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.4-1 Through 3.4-28 for Amendment 176 ML0407804912004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.4-29 Through 3.4-51 for Amendment 176 2023-02-16
[Table view] |
Text
Containment 3.6.1 3.6 CONTAINMENTSYSTEMS 3.6.1 Containment LCO 3.6.1 Containment shall be OPERABLE.
APPLICABILITY: MODES1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Containment A.1 Restore containment 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. to OPERABLE status.
B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit No. 2 3.6-l Amendment No. 176
Containment 3.6.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I
SR 3.6.1.1 Perform required Type B and C leakage rate NOTE-----
testing except for containment air lock SR 3.0.2 is not testing, in accordance with 10 CFR 50, applicable Appendix J, Option A, as modified by approved exemptions.
The leakage rate acceptance criterion is In accordance
< 1.0 L,. However, during the first unit with 10 CFR 50, startup following testing performed in Appendix J, accordance with 10 CFR 50, Appendix J, Option A, as Option A, as modified by approved modified by exemptions, the leakage rate acceptance approved criterion is < 0.6 L, for the Type B and exemptions Type C tests.
SR 3.6.1.2 Verify containment structural integrity In accordance in accordance with the Containment Tendon with the Surveillance Program. Containment Tendon Surveillance Program SR 3.6.1.3 Perform required visual examinations and In accordance Type A leakage rate testing, in accordance with the with the Containment Leakage Rate Testing Containment Program. Leakage Rate Testing Program HBRSEP Unit No. 2 3.6-2 Amendment No. 176
Containment Air Lock 3.6.2 3.6 CONTAINMENTSYSTEMS 3.6.2 Containment Air Lock LCO 3.6.2 The containment air lock shall be OPERABLE.
APPLICABILITY: MODES1, 2, 3, and 4.
ACTIONS
_-____II_-_---__--------------------- NOTES------------------------------------
- 1. Entry and exit is permissible to perform repairs on the affected air lock components.
- 2. Enter applicable Conditions and Required Actions of LCO 3.6.1, "Containment," when air lock leakage results in exceeding the overall containment leakage rate.
__-___I_____-_-_---_---- __I___-_____--______---- _---1_____1_____-___----------
CONDITION REQUIRED ACTION COMPLETIONTIME A. One containment air ~--~~~-~~~~~ NOTES-------
lock door inoperable. 1. Required Actions A.l, A.2, and A.3 are not applicable if both doors are inoperable and Condition C is entered.
- 2. Entry and exit is permissible for 7 days under administrative controls.
A.1 Verify the OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed.
A.2 Lock the OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> door closed.
AND (continued)
HBRSEP Unit No. 2 3.6-3 Amendment No. 176
Containment Air Lock 3.6.2 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. (continued) A.3 --------NOTE---------
Air lock doors in high radiation areas may be verified locked closed by administrative means.
_________________I___
Verify the OPERABLE Once per 31 days door is locked closed.
B. Containment air lock interlock mechanism Required Actions B.l, inoperable. B.2, and B.3 are not applicable if both doors are inoperable and Condition C is entered.
Entry and exit of containment is permissible under the control of a dedicated individual.
Verify an OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed.
AND B.2 Lock an OPERABLE door 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> closed.
(continued)
HBRSEP Unit No. 2 3.6-4 Amendment No. 176
Containment Air Lock 3.6.2 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME B. (continued) B-3 --------NOTE---------
Air lock doors in high radiation areas may be verified locked closed by administrative means.
_1---__--______11____
Verify an OPERABLE Once per 31 days door is locked closed.
C. Containment air lock c.1 Initiate action to Immediately inoperable for reason evaluate overall other than Condition containment leakage or B. rate per LCO 3.6.1.
AND c.2 Verify a door is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> closed in the air lock.
AND c.3 Restore air lock to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.
D. Required Action and D.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completio Time not met. AND D.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit No. 2 3.6-5 Amendment No. 176
Containment Air Lock 3.6.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.1 -------------------NOTES-------------------
- 1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
- 2. Results shall be evaluated against acceptance criteria of SR 3.6.1.1, in accordance with 10 CFR 50, Appendix J, I--w- NOTE-----
Option A, as modified by approved SR 3.0.2 is not exemptions. applicable
---w---1------1 Perform required air lock leakage rate In accordance testing in accordance with 10 CFR 50, with 10 CFR 50, Appendix J, Option A, as modified by Appendix 3, approved exemptions. Option A, as modified by approved exemptions.
SR 3.6.2.2 Verify only one door in the air lock can be 24 months opened at a time.
HBRSEP Unit No. 2 3.6-6 Amendment No. 176
Containment Isolation Valves 3.6.3 3.6 CONTAINMENTSYSTEMS 3.6.3 Containment Isolation Valves LCO 3.6.3 Each containment isolation valve shall be OPERABLE.
APPLICABILITY: MODES1, 2, 3, and 4.
ACTIONS
_________________---________________I NOTES------------------------------------
- 1. Penetration flow path(s) may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each penetration flow path.
- 3. Enter applicable Conditions and Required Actions for systems made inoperable by containment isolation valves.
- 4. Enter applicable Conditions and Required Actions of LCO 3.6.1, "Containment," when isolation valve leakage results in exceeding the overall containment leakage rate acceptance criteria.
- 5. Enter applicable Conditions and Required Actions of LCO 3.6.8, "Isolation Valve Seal Water (IVSW) System," when required IVSW supply to a penetration flowpath is isolated.
CONDITION REQUIRED ACTION COMPLETIONTIME A. ---------NOTE--------- A.1 Is01 ate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Only applicable to penetration flow path penetration flow paths by use of at least with two containment one closed and isolation valves. de-activated automatic valve, closed manual valve, One or more blind flange, or penetration flow paths check valve with flow with one containment through the valve isolation valve secured.
inoperable.
(continued)
HBRSEP Unit No. 2 3.6-7 Amendment No. 176
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. (continued) A.2 --------NOTE---------
Isolation devices in high radiation areas may be verified by use of administrative means.
________________I____
Verify the affected Once per 31 days penetration flow path for isolation is isolated. devices outside containment AND Prior to entering MODE4 from MODE5 if not performed within the previous 92 days for isolation devices inside containment B. ---------NOTE--------- B.l Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Only applicable to penetration flow path penetration flow paths by use of at least with two containment one closed and isolation valves. de-activated automatic valve, closed manual valve, One or more or blind flange.
penetration flow paths with two containment isolation valves inoperable.
(continued)
HBRSEP Unit No. 2 3.6-8 Amendment No. 176
Containment Isolation Valves 3.6.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETIONTIME C. ------------------------------------------- NOTE---------------------------------------------------------------------------
c.1 Isolate the affected 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Only applicable to penetration flow path penetration flow paths by use of at least with only one one closed and containment isolation de-activated valve and a closed automatic valve, system. closed manual valve,
__-__-___--____--I__-- or blind flange.
One or more AND Penetration flow paths with one containment c.2 ---- NOTE------
isolation valve Isolation devices in inoperable. high radiation areas may be verified by use of administrative means.
-__-1-____1________-_
Verify the affected Once per 31 days penetration flow path for isolation is isolated. devices outside containment AND Prior to entering MODE4 from MODE5 if not performed within the previous 92 days for isolation devices inside containment (continued)
HBRSEP Unit No. 2 3.6-9 Amendment No. 176
Containment Isolation Valves 3.6.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETIONTIME D. Required Action and D.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND D.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 42 inch penetration (Supply or Exhaust) purge valves open and 6 inch penetration (pressure or vacuum relief) valves open simultaneously.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.1 -------------------NOTE--------------------
The 42 inch and 6 inch valves may not be open simultaneously.
Verify each 42 inch purge supply and 31 days exhaust valve and each 6 inch pressure and vacuum relief valve is closed, except when the valves are open for safety related reasons, or for tests or Surveillances that require the valves to be open.
(continued)
HBRSEP Unit No. 2 3.6-10 Amendment No. 176
Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS(continued)
SURVEILLANCE FREQUENCY SR 3.6.3.2 -------------------NOTE--------------------
Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
Verify each containment isolation manual 31 days for valve and blind flange that is located containment outside containment and not locked, sealed isolation or otherwise secured and required to be manual valves closed during accident conditions is (except closed, except for containment isolation Penetration valves that are open under administrative Pressurization controls. System valves with a diameter
< 3/8 inch) and blind flanges AND 18 months for Penetration Pressurization System valves with a diameter
< 3/8 inch SR 3.6.3.3 ~~~~~~~-~~I~---~~-- NOTE--------------------
Valves and blind flanges in high radiation areas may be verified by use of administrative means.
Verify each containment isolation manual Prior to valve and blind flange that is located entering MODE4 inside containment and not locked, sealed from MODE5 if or otherwise secured and required to be not performed closed during accident conditions is within the closed, except for containment isolation previous valves that are open under administrative 92 days controls.
(continued)
HBRSEP Unit No. 2 3.641 Amendment No. 176
Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS(continued)
SURVEILLANCE FREQUENCY SR 3.6.3.4 Verify the isolation time of each automatic In power operated containment isolation valve accordance is within limits. with the Inservice Testing Program SR 3.6.3.5 Verify each automatic containment isolation 18 months valve that is not locked, sealed or otherwise secured in position, actuates to the isolation position on an actual or simulated actuation signal.
SR 3.6.3.6 Verify each 42 inch inboard containment 18 months purge valve is blocked to restrict the valve from opening > 70'.
HBRSEP Unit No. 2 3.6-12 Amendment No. 176
Containment Pressure 3.6.4 3.6 CONTAINMENTSYSTEMS 3.6.4 Containment Pressure LCO 3.6.4 Containment pressure shall be > -0.8 psig and < +l.O psig.
APPLICABILITY: MODES1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Containment pressure A.1 Restore containment 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not within limits. pressure to within limits.
B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
- associated Completion Time not met. AND B.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I
SR 3.6.4.1 Verify containment pressure is within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limits.
HBRSEP Unit No. 2 3.6-13 Amendment No. 176
Containment Air Temperature 3.6.5 3.6 CONTAINMENTSYSTEMS 3.6.5 Containment Air Temperature LCO 3.6.5 Containment average air temperature shall be < 12OOF.
APPLICABILITY: MODES1, 2, 3; and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Containment average A.1 Restore containment 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> air temperature not average air within limit. temperature to within limit.
B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I
SR 3.6.5.1 Verify containment average air temperature 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is within limit.
HBRSEP Unit No. 2 3.6-14 Amendment No. 176
Containment Spray and Cooling Systems 3.6.6 3.6 CONTAINMENTSYSTEMS 3.6.6 Containment Spray and Cooling Systems LCO 3.6.6 Two containment spray trains and two containment cooling trains shall be OPERABLE.
APPLICABILITY: MODES1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. One containment spray A.1 Restore containment 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> train inoperable. spray train to OPERABLE status.
10 days from discovery of failure to meet the LCO B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met.
B.2 Be in MODE 5. 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> C. One containment c.1 Restore containment 7 days cooling train cooling train to inoperable. OPERABLE status. AND 10 days from discovery of failure to meet the LCO (continued)
HBRSEP Unit No. 2 3.6-15 Amendment No. 176
Containment Spray and Cooling Systems 3.6.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETIONTIME D. Two containment D.l Restore one 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> cooling trains containment cooling inoperable. train to OPERABLE status.
E. Required Action and E.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition C AND or D not met.
E.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. Two containment spray F.1 Enter LCO 3.0.3. Immediate1y trains inoperable.
OR Any combination of three or more trains inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.6.1 Verify each containment spray manual, power 31 days operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.
(continued)
HBRSEP Unit No. 2 3.646 Amendment No. 176
Containment Spray and Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.6.2 Operate each containment cooling train fan 31 days unit for 2 15 minutes.
SR 3.6.6.3 Verify cooling water flow rate to each 31 days cooling unit is 2 750 gpm.
SR 3.6.6.4 Verify each containment spray pump's In accordance developed head at the flow test point is with the greater than or equal to the required Inservice developed head. Testing Program SR 3.6.6.5 Verify each automatic containment spray 18 months valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.6.6.6 Verify each containment spray pump starts 18 months automatically on an actual or simulated actuation signal.
SR 3.6.6.7 Verify each containment cooling train 18 months starts automatically on an actual or simulated actuation signal.
SR 3.6.6.8 Verify each spray nozzle is unobstructed. Following activities which could result in nozzle blockage HBRSEP Unit No. 2 3.6-17 Amendment No. l-76 194
Spray Additive System 3.6.7 3.6 CONTAINMENTSYSTEMS 3.6.7 Spray Additive System LCO 3.6.7 The Spray Additive System shall be OPERABLE.
APPLICABILITY: MODES1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Spray Additive System A.1 Restore Spray 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. Additive System train to OPERABLE status.
AND At least 100% of the Spray Additive System flow equivalent to a
- single OPERABLE Spray Additive System train available to an OPERABLE Containment Spray Train.
B. Spray Additive System B.l Restore Spray 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable for reasons Additive System to other than OPERABLE status.
Condition A.
C. Required Action and c.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND c.2 Be in MODE5. 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> HBRSEP Unit No. 2 3.6-18 Amendment No. 176
Spray Additive System 3.6.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.7.1 Verify each spray additive manual, power 31 days operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.
SR 3.6.7.2 Verify spray additive tank solution volume 184 days is > 2505 gal.
SR 3.6.7.3 Verify spray additive tank NaOH solution 184 days concentration is > 30% by weight.
SR 3.6.7.4 Verify each spray additive automatic valve 18 months in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
HBRSEP Unit No. 2 3.6-19 Amendment No. 176
Isolation Valve Seal Water System 3.6.8 3.6 CONTAINMENTSYSTEMS 3.6.8 Isolation Valve Seal Water (IVSW) System LCO 3.6.8 The IVSW System shall be OPERABLE.
APPLICABILITY: MODES1, 2, 3, and 4.
ACTIONS CONDITION RIEQUIRED ACTION COMPLETION TIME I
A. IVSW system A.1 Restore IVSW system 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. to OPERABLE status.
B. Required Action B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and associated Completion Time AND not met.
B.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.8.1 Verify IVSWtank pressure is > 44.6 psig. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I
SR 3.6.8.2 Verify the IVSW tank volume is
> 85 gallons.
HBRSEP Unit No. 2 3.6-20 Amendment No. 176 187
Isolation Valve Seal Water System 3.6.8 SURVEILLANCE REQUIREMENTS(continued)
SURVEILLANCE FREQUENCY SR 3.6.8.3 Verify the opening time of each air In accordance operated header injection valve is within with the limits. Inservice Testing Program SR 3.6.8.4 Verify each automatic valve in the IVSW 18 months System actuates to the correct position on an actual or simulated actuation signal.
SR 3.6.8.5 Verify the IVSW dedicated nitrogen 18 months bottles will pressurize the IVSW tank to
> 44.6 psig.
SR 3.6.8.6 Verify IVSW seal header flow rate is: 18 months
- a. < 52.00 cc/minute for Header A,
- b. < 16.50 cc/minute for Header B, C. < 32.50 cc/minute for Header C, and
- d. < 23.00 cc/minute for Header D.
HBRSEP Unit No. 2 3.6-21 Amendment No. 176 187