Memo 02/10/03 Kewaunee Re DRS Input to Integrated Report IR 05000305-03-002
ML030420166
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/10/2003
From: Creed J
Division of Reactor Safety III
To: Kenneth Riemer
NRC/RGN-III/DRP/RPB5
References
IR-03-002
Download: ML030420166 (3)


See also: IR 05000305/2003002

Text

February 10, 2003

MEMORANDUM TO: Kenneth R. Riemer, Chief

Reactor Projects Branch 5

Division of Reactor Projects

FROM: James R. Creed /RA by TMadeda Acting For/

Safeguards Program Manager

Division of Reactor Safety

SUBJECT: KEWAUNEE NUCLEAR POWER PLANT

DRS INPUT TO INTEGRATED REPORT 50-305/03-02

Attached is the report input for Kewaunee Nuclear Power Plant, Unit 1, Integrated

Report 50-305/03-02. I have reviewed this input and have determined it is ready for distribution

to the licensee and dissemination to the public.

After your concurrence, please return this hard copy to me, and we will email the electronic

version to you.

Attachment: Input to Inspection Report 50-305/03-02

CONTACT: Terry J. Madeda, DRS

(630) 829-9860

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML030420166.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE RIII E RIII N RIII N

NAME TMadeda:aa JCreed KRiemer

DATE 02/05/03 02/10/03 02/10/03

OFFICIAL RECORD COPY

Cover Letter

T No input, no significant findings.

Input below, Green findings were identified.

Title Page

Inspector: T. J. Madeda, Physical Security Inspector

SUMMARY OF FINDINGS

Inspectable Area: Physical Protection

A. Inspector Identified Findings

No findings of significance were identified.

B. Licensee Identified Findings

No findings of significance were identified.

REPORT DETAILS

3. SAFEGUARDS

Cornerstone: Physical Protection

3PP4 Security Plan Changes (71130.04)

a. Inspection Scope

The inspectors reviewed Revision 18 to the Kewaunee Nuclear Power Plant Security

Manual to verify that the changes did not decrease the effectiveness of the submitted

document. The referenced revision was submitted in accordance with 10 CFR

50.54(p)(2) requirements by licensee letter dated December 20, 2002.

b. Findings

No findings of significance were identified.

1

40A5 OTHER ACTIVITIES

4OA6 Meetings

.2 Interim Exit Meetings

Interim Exit was conducted

  • Safeguards Inspection with Mr. M. Fencl on January 27, 2003

KEY POINTS OF CONTACT

Licensee

M. Fencl, Security Manager, Kewaunee/Point Beach

LIST OF DOCUMENTS REVIEWED

3PP4 Physical Protection - Security Plan Change

Kewaunee Nuclear Power Plant Security Manual; Revision 18, dated

December 20, 2002