RAI, Relief Request for Second 10-Year Interval Inservice Testing Program
ML030830449
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/31/2003
From: Sands S
NRC/NRR/DLPM/LPD3
To: Kanda W
FirstEnergy Nuclear Operating Co
SANDS S, NRR/DLPM, 415-3154
References
TAC MB7343
Download: ML030830449 (4)


Text

March 31, 2003 Mr. William R. Kanda Vice President - Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A200 10 Center Road Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR RELIEF REQUEST FOR THE SECOND 10-YEAR INTERVAL INSERVICE TESTING PROGRAM AT (TAC NO. MB7343)

Dear Mr. Kanda:

By letter dated June 24, 2002, FirstEnergy Nuclear Operating Company, requested relief from certain American Society of Mechanical Engineers inservice testing requirements for check valves at the Perry Nuclear Power Plant (PNPP). The relief request VR-12 proposes to extend the exercise interval for those check valves whose safety function is to limit the amount of air leakage from the emergency service water sluice gate inflatable seals, when the seals are inflated, in the event of a loss of supply air.

During the review, the Nuclear Regulatory Commission staff has identified that additional information is needed in order to complete the review. Specific questions are presented in the enclosed RAI.

The enclosed question has already been discussed with your staff. In order to accommodate PNPPs refueling outage, please respond to this RAI by April 14, 2003. If you have any questions concerning our review, or additional time is needed to respond to the RAI, please contact me at (301) 415-3154.

Sincerely,

/RA by J. Hopkins for/

Stephen P. Sands, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Request for Additional Information cc w/encl: See next page

ML030830449 OFFICE PM:LPD3-2 LA:LPD3-2 SC:LPD3-2 NAME SSands THarris AMendiola DATE 3/27/03 3/27/03 3/27/03 REQUEST FOR ADDITIONAL INFORMATION PERRY NUCLEAR POWER PLANT (PNPP)

RELIEF REQUEST FOR THE SECOND 10-YEAR INTERVAL INSERVICE TESTING PROGRAM The Nuclear Regulatory Commission staff has reviewed the June 24, 2002, FirstEnergy Nuclear Operating Company submittal regarding changes to the PNPP Relief Request VR-12 and has the following question and comment concerning the submittal:

1. The proposed extension of the exercise interval does not adequately explain why the proposed alternative provides an acceptable level of quality and safety. In addition, the submittal does not demonstrate that compliance with Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2. The proposed request is to test a check valve once in a period of time vice a minimum of two times as required by code without any additional confirmation or efforts to confirm the operational status of the valve. No supporting information is provided to show that a single test provides an adequate level of safety and quality as do the performance of multiple tests.
3. On page 2 of 2 of Attachment 1 to Perry Relief VR-12, the licensee references a Safety Evaluation that states "When the seals are inflated, seal integrity will be verified twice daily." Is this statement part of the proposed Alternative Testing? Is credit for check valve operation being taken by the verification that the seal has maintained pressure?

Perry Nuclear Power Plant, Unit 1 cc:

Mary E. OReilly FirstEnergy Corporation Carol OClaire, Chief, Radiological Branch 76 South Main St. Ohio Emergency Management Agency Akron, OH 44308 2855 West Dublin Granville Road Columbus, OH 43235-7150 Resident Inspectors Office U.S. Nuclear Regulatory Commission Mayor, Village of Perry P.O. Box 331 P.O. Box 100 Perry, OH 44081-0331 Perry, OH 44081-0100 Regional Administrator, Region III Dennis Clum U.S. Nuclear Regulatory Commission Radiological Assistance Section Supervisor 801 Warrenville Road Bureau of Radiation Protection Lisle, IL 60532-4531 Ohio Department of Health P.O. Box 118 Sue Hiatt Columbus, OH 43266-0118 OCRE Interim Representative 8275 Munson Zack A. Clayton Mentor, OH 44060 DERR Ohio Environmental Protection Agency Mr. Vernon K. Higaki ATTN: Mr. Zack A. Clayton Manager - Regulatory Affairs P.O. Box 1049 FirstEnergy Nuclear Operating Company Columbus, OH 43266-0149 Perry Nuclear Power Plant P.O. Box 97, A210 Chairman 10 Center Road Perry Township Board of Trustees Perry, OH 44081 3750 Center Road, Box 65 Perry, OH 44081 Timothy Rausch, Plant Manager FirstEnergy Nuclear Operating Company Daniel Z. Fisher Perry Nuclear Power Plant Transportation Department P.O. Box 97, SB306 Public Utilities Commission Perry, OH 44081 180 East Broad Street Columbus, OH 43215-3793 Mayor, Village of North Perry North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009