Yankee Atomic Electric Company Transmittal of Calculation for License Termination Plan (Ltp) Development
ML031920653
Person / Time
Site: Yankee Rowe
Issue date: 06/20/2003
From: Kay J
Yankee Atomic Electric Co
To:
Document Control Desk, NRC/FSME
References
-RFPFR, BYR 2003-052 YA-CALC-00-001-03, YA-CALC-00-002-03
Download: ML031920653 (1)


Text

Telephone (508) 721-7736 YANKEE ATOMIC ELECTRIC COMPANY Fale (50) 7217743 Suifte 200, 19 Midstate Drive, Aubum, Massachusetts 01501 June 20, 2003 BYR 2003-052 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Reference:

(a) License No. DPR-3 (Docket No. 50-29)

Subject:

Calculations for License Termination Plan (LTP) Development As per our discussions during the April 15, 2003 NRC meeting to discuss dose modeling, this letter provides copies of two calculations in support of our LTP development for the Yankee Nuclear Power Station (YNPS). A hardcopy of each calculation is enclosed as well as an electronic copy of the appendices via CD. The specific calculations provided are as follows:

(1) YA-CALC-00-001-03, "RESRAD 6.21 Sensitivity Analysis for Soil - Resident Farmer Scenario," and (2) YA-CALC-00-002-03, "Derived Concentration Guideline Levels for Soil at YNPS Site."

These calculations are provided for your preliminary review. If you have any questions, please contact us.

Sincerely, YANKEE ATOMIC ELECTRIC COMPANY L-jvnes A. Kay Principal Licensing Engineer cc: J. Hickman, NRC, Senior Project Manager, NMSS (2 copies)

T. O'Connell, MA DPH D. Howland, MA DEP M. Rosenstein, EPA, Region 1