Similar Documents at Byron |
---|
Category:Letter
MONTHYEARRS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 2024-09-06
[Table view] |
Text
'Ar*k TELEDYNE L35668 1 of 6 7F BROWN ENGINEERING, INC.
A*Teedyno Technolugls Comepany 2508 Quality Lane KOoxville, TN 37931-3133 865-690-6819 Zoe Co0Staio
"' '*-B7yron f
Exelon Nuclear 4450 N. German-Church Road Byron, IL 61010 Report of Analysis/Certificate of Conformance LIMS.#: L35668 Project ID# EX00I-3ESPBYRON-06 Received: 07/07/2008 Delivery Date .07/28/2008 P.O.:" 01000298 REL.#00011 Release #
SDG#:
This is to certify that Teledyne Brown Engineering - Environmental Services located at 2508 Quality Lane, Knoxville, Tennessee, 37931,,has analyzed, tested and documented samples, as received by the laboratory, as specified in the applicable purchase order.
This also certifies that requirements of applicable codes, standards and specifications have been fully met, and that any quality assurance documentation which verified conformance to the,purchase order is on file and may be examined upon request.
I hereby certify that the above statements are true and correct.
P'* Kee'h Jetteh Operations Manager Cross Reference Table Client ID Laboratory ID Station ID(ifapplicable) _
- EBY-AR-7 L35668&2 _ AR-__--_---_"__
Method 'Reference Numbers Matri Analysis Method Reference WG H.3 ([DIST) EPA.906.0 This report shall not be, reproduced or distributed except in its entirety.
Page 1 of 2
Report of Analysis TELEDYNE 07/18/08 14:35 V 'OII BROWN ENGINEERING3, INC.
ATeledyne Technologies Cumipanyj L35668 Byron Station EXOO1-3ESPBYRON-06 Flag Values U = Compqund/Analyte not deected.or less. than 3 sigma No = Peak not identified in gamma spectrum
+ = Activity:concentration exceeds MD)C and 3 sigma; peak identified(garnma only)
Yes = Pak identified in gamma spectrum U* = Compound/Analyte not de tecd. Peak not identified, but forced activity concentration exceeds MDC and 3 sigma ****'Results arm reported onsan as received basis t4 High = Activity conceritration exceeds customer reporting value unless otherwise'noted Spec = MDC exceeds customer technical specification 0)
L = Low recovery MDC - Minimum-Detectable Concentration H - High recovery 00 Bolded text indicates reportable value.
Page 2 of 2
I
- -- C."
Byruon Generating Station Sample C1l1ectidonReceipt Sheet &_g 1 Groundwater Samples . EXELON NUCLEAR Sample Lab. No. Client ID Station Code Medium Str-t date Start time -Stop date Stop time Sample S Analysis Commntsrs BY-AR-7 BY- GW 06/30/2008. 13:15 06/30/2008 13:15 250 iL H-3 (DIST).
__ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ I Collected by;, Byron Station personnel Date: 06/30f2008 0)~
Date: 07/03/2008 Date: i i 0
L35668 4 of 6 Environmental, Inc. SR NO. 3549__
Midwest Laboratory Shipping Request An Allegheny Technologies Company MIDWEST LABORATORY-700 LANDWEHR ROAD . NORTHBROOK, IL60082-2310 (847),584-0700 FAX (847) 564-4517 NOTEll When returning or replacing this material, please reference SIR No0 on all documents.
PART I (To be completed by originator) D. Control Data:
A. Description of Items (Include, Quantity, Model No.,
Type, SearalNo,.;and Gdv't Property No.)
Vendor P;O. No.
Byron:
6 gallons of milk: W.O./Acct. No.
AP/AIs Location of material Ship no later than Ship via Collect D Prepaid D B. Purpose of Shipment: No'.Pcs.lctns. Cu. Ft.
Weight Est.-.Val.
I] Return:for~creditNo replacement; Part II (To be completed by El Return for rework or replacement at Vendor's expense.
Shipping Dept)
O Return for reworkior replacement at Envirormerntal, Inc'sexpense.a Actual method of shipment Federal Express, 1 Furnished on Consignment for use on P.O. No.
O Other (explain) Date Shipped 07-03-2008 C. Comments or instructions to Vendor:. Collect Prepaid FOBpoint Waybill No.
Misc.
SHIP TO: TBE L.B.
OkIGiNATOR'S INITIALSATN ATTN:
L35668 5 of 6 07/11/08 13:30 Teledyne Brown Engineering Saniple Receipt Verification/Variance Report SR #: SR17751 Client: , Exeln Project #: EX001-3EREMPBYRON-05 LIMS #: L35668
'.,1 Initiated By4IRPERRYP Init Date: _.07/101,8 Receive Date: 07/10/08 Notification of Variance 1I Person Notified: Contacted By:
Notify Date,:
Notify Method:
Notify Comment:
Client Response Person Re~ponding:,
Response Date4 Response. Method-Response Comment Criteria Yes No NA Comment 1 Shipping container custody seals present NA and intact.
2 Sample container custody seals present NA and intact.
3 Sample container's received in 4good y condition of custody received with samples oChain y 5 All samples listed- on chain of custody ýy received 6 Sample container labels present and, legible.
7 Information onl'container labels y cor.respond with chain of custody 8 Sample(s) properly preserved and, in NA.
appropriate container(s) 9 Other (Describe) NA
Raw Data Sheet (r-awdata)
Jul 18 2008, 02;35 pu Work Order: L35668 Customer: M:elon Page: I Nuclide: H-3 fDIST) Project : 1X00*I-3SPBYROM-06 Decay &
Mount Count Counter Total Sample Bkg Dkg aff.
Zngrowth Analyst Sample ID Run Analysis Referexic6 Volume/ Scavenge Milking Client In # Date/time Aliquot Date/time Date/time Weight Recovery Date/time ID counts dt counts dt Factor L35668-2 H-3 DIST 0 17-jul-08 1.S7 176 70 137 70 .208 KFY 10 ml 00;45 (M) flY- AR-?
Activity: 1.22E+02 Error: 1.1E02 .MC: 1.693+02" pCi/L LJ a-'
0Ci 0