Similar Documents at Byron |
---|
Category:Letter
MONTHYEARIR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23192A0362023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23159A1302023-06-0808 June 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) ML23159A1542023-06-0808 June 2023 2022 Regulatory Commitment Change Summary Report RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process ML23157A2832023-06-0606 June 2023 Notification of NRC Baseline Inspection and Request for Information BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23003A7882023-05-11011 May 2023 Report for December 12-16, 2022, Regulatory Audit Regarding Reinsertion of a High Burnup Accident Tolerant Fuel Lead Test Assembly 2024-02-02
[Table view] |
Text
'Ar*k TELEDYNE L35668 1 of 6 7F BROWN ENGINEERING, INC.
A*Teedyno Technolugls Comepany 2508 Quality Lane KOoxville, TN 37931-3133 865-690-6819 Zoe Co0Staio
"' '*-B7yron f
Exelon Nuclear 4450 N. German-Church Road Byron, IL 61010 Report of Analysis/Certificate of Conformance LIMS.#: L35668 Project ID# EX00I-3ESPBYRON-06 Received: 07/07/2008 Delivery Date .07/28/2008 P.O.:" 01000298 REL.#00011 Release #
SDG#:
This is to certify that Teledyne Brown Engineering - Environmental Services located at 2508 Quality Lane, Knoxville, Tennessee, 37931,,has analyzed, tested and documented samples, as received by the laboratory, as specified in the applicable purchase order.
This also certifies that requirements of applicable codes, standards and specifications have been fully met, and that any quality assurance documentation which verified conformance to the,purchase order is on file and may be examined upon request.
I hereby certify that the above statements are true and correct.
P'* Kee'h Jetteh Operations Manager Cross Reference Table Client ID Laboratory ID Station ID(ifapplicable) _
- EBY-AR-7 L35668&2 _ AR-__--_---_"__
Method 'Reference Numbers Matri Analysis Method Reference WG H.3 ([DIST) EPA.906.0 This report shall not be, reproduced or distributed except in its entirety.
Page 1 of 2
Report of Analysis TELEDYNE 07/18/08 14:35 V 'OII BROWN ENGINEERING3, INC.
ATeledyne Technologies Cumipanyj L35668 Byron Station EXOO1-3ESPBYRON-06 Flag Values U = Compqund/Analyte not deected.or less. than 3 sigma No = Peak not identified in gamma spectrum
+ = Activity:concentration exceeds MD)C and 3 sigma; peak identified(garnma only)
Yes = Pak identified in gamma spectrum U* = Compound/Analyte not de tecd. Peak not identified, but forced activity concentration exceeds MDC and 3 sigma ****'Results arm reported onsan as received basis t4 High = Activity conceritration exceeds customer reporting value unless otherwise'noted Spec = MDC exceeds customer technical specification 0)
L = Low recovery MDC - Minimum-Detectable Concentration H - High recovery 00 Bolded text indicates reportable value.
Page 2 of 2
I
- -- C."
Byruon Generating Station Sample C1l1ectidonReceipt Sheet &_g 1 Groundwater Samples . EXELON NUCLEAR Sample Lab. No. Client ID Station Code Medium Str-t date Start time -Stop date Stop time Sample S Analysis Commntsrs BY-AR-7 BY- GW 06/30/2008. 13:15 06/30/2008 13:15 250 iL H-3 (DIST).
__ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ I Collected by;, Byron Station personnel Date: 06/30f2008 0)~
Date: 07/03/2008 Date: i i 0
L35668 4 of 6 Environmental, Inc. SR NO. 3549__
Midwest Laboratory Shipping Request An Allegheny Technologies Company MIDWEST LABORATORY-700 LANDWEHR ROAD . NORTHBROOK, IL60082-2310 (847),584-0700 FAX (847) 564-4517 NOTEll When returning or replacing this material, please reference SIR No0 on all documents.
PART I (To be completed by originator) D. Control Data:
A. Description of Items (Include, Quantity, Model No.,
Type, SearalNo,.;and Gdv't Property No.)
Vendor P;O. No.
Byron:
6 gallons of milk: W.O./Acct. No.
AP/AIs Location of material Ship no later than Ship via Collect D Prepaid D B. Purpose of Shipment: No'.Pcs.lctns. Cu. Ft.
Weight Est.-.Val.
I] Return:for~creditNo replacement; Part II (To be completed by El Return for rework or replacement at Vendor's expense.
Shipping Dept)
O Return for reworkior replacement at Envirormerntal, Inc'sexpense.a Actual method of shipment Federal Express, 1 Furnished on Consignment for use on P.O. No.
O Other (explain) Date Shipped 07-03-2008 C. Comments or instructions to Vendor:. Collect Prepaid FOBpoint Waybill No.
Misc.
SHIP TO: TBE L.B.
OkIGiNATOR'S INITIALSATN ATTN:
L35668 5 of 6 07/11/08 13:30 Teledyne Brown Engineering Saniple Receipt Verification/Variance Report SR #: SR17751 Client: , Exeln Project #: EX001-3EREMPBYRON-05 LIMS #: L35668
'.,1 Initiated By4IRPERRYP Init Date: _.07/101,8 Receive Date: 07/10/08 Notification of Variance 1I Person Notified: Contacted By:
Notify Date,:
Notify Method:
Notify Comment:
Client Response Person Re~ponding:,
Response Date4 Response. Method-Response Comment Criteria Yes No NA Comment 1 Shipping container custody seals present NA and intact.
2 Sample container custody seals present NA and intact.
3 Sample container's received in 4good y condition of custody received with samples oChain y 5 All samples listed- on chain of custody ýy received 6 Sample container labels present and, legible.
7 Information onl'container labels y cor.respond with chain of custody 8 Sample(s) properly preserved and, in NA.
appropriate container(s) 9 Other (Describe) NA
Raw Data Sheet (r-awdata)
Jul 18 2008, 02;35 pu Work Order: L35668 Customer: M:elon Page: I Nuclide: H-3 fDIST) Project : 1X00*I-3SPBYROM-06 Decay &
Mount Count Counter Total Sample Bkg Dkg aff.
Zngrowth Analyst Sample ID Run Analysis Referexic6 Volume/ Scavenge Milking Client In # Date/time Aliquot Date/time Date/time Weight Recovery Date/time ID counts dt counts dt Factor L35668-2 H-3 DIST 0 17-jul-08 1.S7 176 70 137 70 .208 KFY 10 ml 00;45 (M) flY- AR-?
Activity: 1.22E+02 Error: 1.1E02 .MC: 1.693+02" pCi/L LJ a-'
0Ci 0