MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
.
OPERATING DATA REPORT 33 DOCKET NO.
DATE JANUARY 1982 COMPLETED BY E. ZUitLT 4
TELEPHONE (315)3 63840 OPERATING STATUS FITZPATRICK Notes
- 1. Unit Name:
- 2. Reporting Period:
811201 - 811231
- 3. Licensed Thermal Power (MWt).
2436
- 4. Nameplate Rating (Gross MWe): 883
- 5. Design Electrical Rating (Net MWe): 821
- 6. Masimum Dependable Capacity (Gross MWe): 830
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons:
NOIE
- 9. Power Level To Which Restricted,if Any (Net MWe): NONE
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date Cumulatise 744 8760 56377 I1. Hours In Reporting Period 0 6637.2 39551.2
- 12. Number Of Hours Reactor Was Critical 0 0 0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 0 6540.8 38443.6 0 0 0
- 15. Unit Reserve Shutdown Hours 0 14217720 78401314
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 0 4o31100 26760610
- 18. Net Electrical Energy Generated (MWH) 0 4779650 25904730 0% 74.7% 68.2%
- 19. U. it Service Factor 0% 74.7% 68.2%
- 20. Unit Availability Factor 0% 67 4% 61.3%
- 21. Unit Capacity Factor (Using MDC Net) 0% 66.5% 56.0%
- 22. Unit Capacity Factor (Using DER Net) 0% 10.1% 16.9%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
NONE
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: FEBRUARY 1982
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h
R 656 820107 CK 05000333 PDR e
- AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 MONDI DECDEER 1981 AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL -
DAY (MWe-Net)
(MWe-Nel) 0 j7 0 1
0 ,3 0 2
0 39 0
3 0 20 0
4 ,
0 0 21 5
22 0 6
0 0 7 23 0
0 24 8
0 9 25 0 0 10 26 0 0 11 27 0 0 12 28 13 29 0 0 14 30 0 3g 0 15 16 0
SUBEARY: Fourth refbeling and maintenance outage continued through this.
reporting period.
1 DOCKET NO.
50-333 - .
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAMIPP
' DATE JANUARY : 962 __
COMPLETED BY E. ZUFbJi?
REPORT MONTil DFEEMBER 1981 TELEPilONE (315)342-3840 4
i
! w.
e ei 's ui 5 Ii
'*"**" gj Cause & Currective N. i . Date E- k $ ? EU Event I'T" Action to p 33 :] -5 5 m Report =
n in G yUo oO 2 3 Ui j g Prevent Recurrence 1
12 81103r s 744 C 1 NA NA NA Refueling outage (cumulative hours to date 1486.7)
I j
)
J I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual fus Preparation of Data B Maintenance of Test 2 ManualScram. Entry Sheets for Licensee C Refucting 3 Automatic Scram. Event Report (LER) File (NUREG-i D Regulatory Restriction 4 Other (Explain) 0161)
E-Operatur Training & License Examination F Administrative -
5 G. Operational Errur (Explain t Exhibit I Same Suuree ll.Ot her ( E xplain)
POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATIONAL EXPERIENCES DECEMBER 1981 i
i The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7
generator maintenance, feedwater heater replacement and fire ,
protection modifications. Presently the outage activities are on schedule.
i
]
1
.--,,. , , ,. _m.. - _ . . - - . _ - , . _ _ _ _ . ~ . , - _ _ . _ . . _ . . , . . . . . _ _ . . . _ . . . _ _ _ - _ _ _ . . _ _ - . _ , - . . . _ - . . - - - - _ _ _ _ .
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT .
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DECEMBER 1981 I
DATE SYSTEM 0 EST REPAIR
, HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 11/13 10 11120 Visual, Leaking pressure seal Replaced pressure seal 24 MOV-33 11/19 71 16156 Ops Fan stalled Cleaned & lubr1cated 8 INV-3B 11/9 10 15749 Limitorque contact out Adjusted contact - Performed 20 MOV-15C ops of adjustment preventative maintenance on Limitorque 11/21 29 16079 LLRT Incomplete main seat- Ground seat, lapped disc, lapped 120 AOV-86C disc contact pilot seat disc 11/1 00 15076 P.M. N/A Inspected snubbers 20 Snubbers 11/27 93 16153 P.M. N/A Performed visual inspection & 217 EDG "B" P.M.
11/27 93 16:155 P.M. N/A Performed visual inspection & 224 EDG "D" P.M.
11/27 13 13540 P.M. N/A Disassembled, inspected, 6 RCI-40 ISI reassembled 11/28 13 9068 Visual Bearing cover, Replaced plug 8 I TU-2 inspection plug l missing 11/30 23 13539 P.M. d/A Disassembled, inspected, 12 HPI-61 ISI reassembled
POWER AUTHORITY OF THE STATE OF NEW YORK '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT -
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DECEMBER 1981 ATE SYSTEM Q I HOW DETEJTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ENT
. 2/1 23 12012 Ops . Valves leak by seat Replaced valves 32 HPI-27C & due to erosion .
28C k2/2 23 13604 Ops Valve leaks by seat Replaced valve 20 LS-90 due to erosion Isolation Valve L2/3 03 15689 Visual Sightglass hit with Replaced sightglass 2 Scram Disc. wrench Inst. Vol.
2/3 27 1.4597 Ops Plugged suction filter Cleaned filter 15 P-11B 12/4 13 9504 Visual Steam cut pressure Replaced pressure seal 24 A0V-22 seal 62/4 13 13_541 P.M. N/A Disassembled, inspected - 12 RCI-12 ISI reassembled R2/5 23 13550 Ops Tight packing bound Repacked valve 12 HP,I-940 stem R2/7 12 14088 Ops Worn packing Repacked 44 MOV-18 62/15 23 16080 LLRT Leaking past c'at & Lapped seat & disc - Formed new 240 HPI-65 seat ring / body threads body back seat with balzona
. super metal
POWER AUTHORITY OF THE STATE OF NEW YORK -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT '.
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
, DECEMBER 1981 DATE SYSTEM K REQ HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE ENT T 12/15 46 13534 P.M.- '
N/A Disassembled, inspected, 12 ESW-9A ISI reassembled .
12/15 15 13537 P.M. N/A Disassembled, inspected, 6 RBC-35A ISI reassembled 12/15 46 13536 P.M. N/A Disassembled, inspected, 6 ESW-18A ISI reassembled 12/22 11 14084 Ops - Visual Packing gland on valve Replaced valve 15 SLC-725A bound up 12/22 03 15071 Ops - Visual Bad seals on valve Replaced valve 3 HCU-34-47 111 Valve
(
s
w .
POWER AUTHORITY OF THE STATE OF NEW YORK '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT < .
MAINTENANCE
SUMMARY
I&C DECEMBER 1981
- K HOW DETECTED O DATE SYSTEM ML COMPONENT]# MALF C ON CTI p l 15635 Square rooters Replaced 74M, +
12/9/81 02-3 SQr-74M & 74N I&C AGEIUG out of Proc. 'Ibl. Recalibrated 74N 24 !
t 17193 Level detector Cleaned &
l 12/29/81 03 HCU-02-35 OPS Dirty rod switch doesn't adjusted switch 2 respond IS-129 Level detector Cleaned & ,
12/29/81 03 17194 OPS Dirty rod switch doesn't adjusted switch 2 !'
HCU-18-43 resnond LS-129 17195 Level switch -
Replaced switch j 12/28/81 03 HCU--34-39 .;, OPS Old age doesn't work IE-129 2
~
02012 Replaced power 1
12/17/81 07 LPRM JIC Unknown Inspection supply 128 ,
16972 Possible seal Detectors Replaced LPM 4 12/7/81 07 LPRM-28-21 OPS leakage reading string (A, B, C, 40 erratically D) 1o973 Possible seal Detectors Replaced LPRM !
- 12/7/81 07 LPRM-36-45 OPS leakage reading string (A, B, C, 40 erratically D) 06047 Unknown Valves don't Calibrated 12/21/81 10 AOV-71 OPS open fully 71 A & B 46 16045 Defective Iow penetration 12/02/81 16-1 X-101D OPS pressure pressure Replaced indicator 2 indicator logic race No high alarm on Checked monitor, 09640 OPS between light & 09-3 panel tested o.k. 2 12/10/81 17 R4-251C annunciator Flow anitteu No output to Repaired by 11938 OPS physically 27-FQ/FY-103 manufacturer 10 12/6/81 27 FT-103A broken
l POWER AUTHORITY OF THE STATE OF NEW YORK .~
- JAMES A. FITZPATRICK NUCLEAR POWER PLANT 'N
- MAINTENANCE
SUMMARY
I&C DECEMBER 1981 DATE SYSTEM
- R RE EST # HOW DETECTED T
CO NENT LFU C ON ML CIN R H S Repeatability of 13766 i L2/19/81 46 I&C Age switch gone Replaced switch 12 DPS-132A 11544 High speed Recalibrated per i i 1.1/30/81 93 EDG "D" Tach OPS Relay tach drift indication in F-IMP-93 3 26 j; control room -
13761 Calibration Replace &
4 EDG "A" to ' D" JIC Unknown needed to be calibrate 31 12/29/81 93 checked indicators i Temperature -
Replaced &
16984 No temperature 3 EDG "A"-TS Iih I&C switch alarm calibrated 10.5
- L2/7/81 93 inoperative switch i
l W
__ ___