OPERATING DATA REPORT 33 DOCKET NO.
DATE JANUARY 1982 COMPLETED BY E. ZUitLT TELEPHONE (315)3 63840 4
OPERATING STATUS FITZPATRICK Notes
- 1. Unit Name:
811201 - 811231
- 2. Reporting Period:
2436
- 3. Licensed Thermal Power (MWt).
883
- 4. Nameplate Rating (Gross MWe):
821
- 5. Design Electrical Rating (Net MWe):
830
- 6. Masimum Dependable Capacity (Gross MWe):
810
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons:
NOIE NONE
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date Cumulatise 744 8760 56377 I1. Hours In Reporting Period 0
6637.2 39551.2
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 0
6540.8 38443.6
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown Hours 0
14217720 78401314
- 16. Gross Thermal Energy Generated (MWH) 0 4o31100 26760610
- 17. Gross Electrical Energy Generated (MWH) 0 4779650 25904730
- 18. Net Electrical Energy Generated (MWH) 0%
74.7%
68.2%
- 19. U. it Service Factor 0%
74.7%
68.2%
- 20. Unit Availability Factor 0%
67 4%
61.3%
- 21. Unit Capacity Factor (Using MDC Net) 0%
66.5%
56.0%
- 22. Unit Capacity Factor (Using DER Net) 0%
10.1%
16.9%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
NONE
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
FEBRUARY 1982
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h
656 820107 R
CK 05000333 PDR e
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 JAFNPP UNIT JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 DECDEER 1981 MONDI DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL -
(MWe-Nel)
(MWe-Net) 0 0
j7 1
0 0
,3 2
0 0
39 3
0 0
20 4
0 0
21 5
0 22 6
0 0
23 7
0 0
24 8
0 25 9
0 0
26 10 0
0 27 11 0
0 28 12 13 29 0
0 14 30 0
0 15 3g 0
16 SUBEARY: Fourth refbeling and maintenance outage continued through this.
reporting period.
1 50-333 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N AME JAMIPP
' DATE JANUARY : 962 __
COMPLETED BY E. ZUFbJi?
REPORT MONTil DFEEMBER 1981 TELEPilONE (315)342-3840 4
i w.
's ui 5 Ii e
ei N. i.
Date E-k
? EU I'T" gj Cause & Currective Event Action to p
33
- ]
-5 5 m n
yUo 3 Ui j Report =
in G Prevent Recurrence oO 2
g 1
12 81103r s
744 C
1 NA NA NA Refueling outage (cumulative hours to date 1486.7)
I j
)
J I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual fus Preparation of Data B Maintenance of Test 2 ManualScram.
Entry Sheets for Licensee C Refucting 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161) i E-Operatur Training & License Examination F Administrative 5
G. Operational Errur (Explain t Exhibit I Same Suuree ll.Ot her ( E xplain)
POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATIONAL EXPERIENCES DECEMBER 1981 i
i The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7
generator maintenance, feedwater heater replacement and fire protection modifications. Presently the outage activities are on schedule.
i
]
1
_m..
. _ -,. _ _ _ _. ~., - _ _. _.. _..,..... _ _... _.
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DECEMBER 1981 I
0 EST REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
11/13 10 11120
- Visual, Leaking pressure seal Replaced pressure seal 24 MOV-33 11/19 71 16156 Ops Fan stalled Cleaned & lubr1cated 8
INV-3B 11/9 10 15749 Limitorque contact out Adjusted contact - Performed 20 MOV-15C ops of adjustment preventative maintenance on Limitorque 11/21 29 16079 LLRT Incomplete main seat-Ground seat, lapped disc, lapped 120 AOV-86C disc contact pilot seat disc 11/1 00 15076 P.M.
N/A Inspected snubbers 20 Snubbers 11/27 93 16153 P.M.
N/A Performed visual inspection &
217 EDG "B"
P.M.
11/27 93 16:155 P.M.
N/A Performed visual inspection &
224 EDG "D" P.M.
11/27 13 13540 P.M.
N/A Disassembled, inspected, 6
RCI-40 ISI reassembled 11/28 13 9068 Visual Bearing cover, Replaced plug 8
I TU-2 inspection plug l
missing 11/30 23 13539 P.M.
d/A Disassembled, inspected, 12 HPI-61 ISI reassembled
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DECEMBER 1981 Q
I ATE SYSTEM HOW DETEJTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
ENT
. 2/1 23 12012 Ops Valves leak by seat Replaced valves 32 HPI-27C &
due to erosion 28C k2/2 23 13604 Ops Valve leaks by seat Replaced valve 20 LS-90 due to erosion Isolation Valve L2/3 03 15689 Visual Sightglass hit with Replaced sightglass 2
Scram Disc.
wrench Inst. Vol.
2/3 27 1.4597 Ops Plugged suction filter Cleaned filter 15 P-11B 12/4 13 9504 Visual Steam cut pressure Replaced pressure seal 24 A0V-22 seal 62/4 13 13_541 P.M.
N/A Disassembled, inspected 12 RCI-12 ISI reassembled R2/5 23 13550 Ops Tight packing bound Repacked valve 12 HP,I-940 stem R2/7 12 14088 Ops Worn packing Repacked 44 MOV-18 62/15 23 16080 LLRT Leaking past c'at &
Lapped seat & disc - Formed new 240 HPI-65 seat ring / body threads body back seat with balzona super metal
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DECEMBER 1981 K REQ DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
ENT 12/15 46 13534 P.M.-
N/A Disassembled, inspected, 12 ESW-9A ISI reassembled 12/15 15 13537 P.M.
N/A Disassembled, inspected, 6
RBC-35A ISI reassembled 12/15 46 13536 P.M.
N/A Disassembled, inspected, 6
ESW-18A ISI reassembled 12/22 11 14084 Ops - Visual Packing gland on valve Replaced valve 15 SLC-725A bound up 12/22 03 15071 Ops - Visual Bad seals on valve Replaced valve 3
HCU-34-47 111 Valve
(
s
w POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
I&C DECEMBER 1981 COMPONENT]#
K HOW DETECTED MALF C ON ML CTI O
DATE SYSTEM p
l 15635 Square rooters Replaced 74M,
+
12/9/81 02-3 SQr-74M & 74N I&C AGEIUG out of Proc. 'Ibl.
Recalibrated 74N 24 t
17193 Level detector Cleaned &
l 12/29/81 03 HCU-02-35 OPS Dirty rod switch doesn't adjusted switch 2
respond IS-129 Level detector Cleaned &
12/29/81 03 17194 OPS Dirty rod switch doesn't adjusted switch 2
HCU-18-43 resnond LS-129 Replaced switch 17195 Level switch j
12/28/81 03 HCU--34-39 OPS Old age doesn't work IE-129 2
02012 Replaced power
~
12/17/81 07 LPRM JIC Unknown Inspection supply 128 1
16972 Possible seal Detectors Replaced LPM 4 12/7/81 07 LPRM-28-21 OPS leakage reading string (A, B, C, 40 erratically D) 1o973 Possible seal Detectors Replaced LPRM 12/7/81 07 LPRM-36-45 OPS leakage reading string (A, B, C, 40 erratically D) 06047 Unknown Valves don't Calibrated 12/21/81 10 AOV-71 OPS open fully 71 A & B 46 16045 Defective Iow penetration 12/02/81 16-1 X-101D OPS pressure pressure Replaced indicator 2
indicator logic race No high alarm on Checked monitor, 09640 OPS between light &
09-3 panel tested o.k.
2 12/10/81 17 R4-251C annunciator Flow anitteu No output to Repaired by 11938 OPS physically 27-FQ/FY-103 manufacturer 10 l
12/6/81 27 FT-103A broken
l POWER AUTHORITY OF THE STATE OF NEW YORK
.~
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
'N MAINTENANCE
SUMMARY
I&C DECEMBER 1981
- R RE EST #
DATE SYSTEM HOW DETECTED CO NENT LFU C ON ML CIN T
R H
S 13766 Repeatability of switch gone Replaced switch 12 i L2/19/81 46 DPS-132A I&C Age 11544 High speed Recalibrated per i
indication in F-IMP-93 3 26 j;
1.1/30/81 93 EDG "D" Tach OPS Relay tach drift i
control room Calibration Replace &
13761 needed to be calibrate 31 EDG "A" to ' D" JIC Unknown 4 12/29/81 93 checked indicators i
16984 Temperature Replaced &
No temperature 3
switch calibrated 10.5 EDG "A"-TS Iih I&C alarm
- L2/7/81 93 inoperative switch i