Monthly Operating Rept for Dec 1981.Narrative Summary Encl
ML20065T709
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/31/1982
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20065T688 List:
References
NUDOCS 8211020656
Download: ML20065T709 (9)


Text

.

OPERATING DATA REPORT 33 DOCKET NO.

DATE JANUARY 1982 COMPLETED BY E. ZUitLT TELEPHONE (315)3 63840 4

OPERATING STATUS FITZPATRICK Notes

1. Unit Name:

811201 - 811231

2. Reporting Period:

2436

3. Licensed Thermal Power (MWt).

883

4. Nameplate Rating (Gross MWe):

821

5. Design Electrical Rating (Net MWe):

830

6. Masimum Dependable Capacity (Gross MWe):

810

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons:

NOIE NONE

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr..to.Date Cumulatise 744 8760 56377 I1. Hours In Reporting Period 0

6637.2 39551.2

12. Number Of Hours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 0

6540.8 38443.6

14. Hours Generator On.Line 0

0 0

15. Unit Reserve Shutdown Hours 0

14217720 78401314

16. Gross Thermal Energy Generated (MWH) 0 4o31100 26760610
17. Gross Electrical Energy Generated (MWH) 0 4779650 25904730
18. Net Electrical Energy Generated (MWH) 0%

74.7%

68.2%

19. U. it Service Factor 0%

74.7%

68.2%

20. Unit Availability Factor 0%

67 4%

61.3%

21. Unit Capacity Factor (Using MDC Net) 0%

66.5%

56.0%

22. Unit Capacity Factor (Using DER Net) 0%

10.1%

16.9%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

NONE

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

FEBRUARY 1982

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h

656 820107 R

CK 05000333 PDR e

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 JAFNPP UNIT JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 DECDEER 1981 MONDI DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL -

(MWe-Nel)

(MWe-Net) 0 0

j7 1

0 0

,3 2

0 0

39 3

0 0

20 4

0 0

21 5

0 22 6

0 0

23 7

0 0

24 8

0 25 9

0 0

26 10 0

0 27 11 0

0 28 12 13 29 0

0 14 30 0

0 15 3g 0

16 SUBEARY: Fourth refbeling and maintenance outage continued through this.

reporting period.

1 50-333 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT N AME JAMIPP

' DATE JANUARY : 962 __

COMPLETED BY E. ZUFbJi?

REPORT MONTil DFEEMBER 1981 TELEPilONE (315)342-3840 4

i w.

's ui 5 Ii e

ei N. i.

Date E-k

? EU I'T" gj Cause & Currective Event Action to p

33

]

-5 5 m n

yUo 3 Ui j Report =

in G Prevent Recurrence oO 2

g 1

12 81103r s

744 C

1 NA NA NA Refueling outage (cumulative hours to date 1486.7)

I j

)

J I

2 3

4 F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual fus Preparation of Data B Maintenance of Test 2 ManualScram.

Entry Sheets for Licensee C Refucting 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161) i E-Operatur Training & License Examination F Administrative 5

G. Operational Errur (Explain t Exhibit I Same Suuree ll.Ot her ( E xplain)

POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATIONAL EXPERIENCES DECEMBER 1981 i

i The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7

generator maintenance, feedwater heater replacement and fire protection modifications. Presently the outage activities are on schedule.

i

]

1

_m..

. _ -,. _ _ _ _. ~., - _ _. _.. _..,..... _ _... _.

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DECEMBER 1981 I

0 EST REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

11/13 10 11120

Visual, Leaking pressure seal Replaced pressure seal 24 MOV-33 11/19 71 16156 Ops Fan stalled Cleaned & lubr1cated 8

INV-3B 11/9 10 15749 Limitorque contact out Adjusted contact - Performed 20 MOV-15C ops of adjustment preventative maintenance on Limitorque 11/21 29 16079 LLRT Incomplete main seat-Ground seat, lapped disc, lapped 120 AOV-86C disc contact pilot seat disc 11/1 00 15076 P.M.

N/A Inspected snubbers 20 Snubbers 11/27 93 16153 P.M.

N/A Performed visual inspection &

217 EDG "B"

P.M.

11/27 93 16:155 P.M.

N/A Performed visual inspection &

224 EDG "D" P.M.

11/27 13 13540 P.M.

N/A Disassembled, inspected, 6

RCI-40 ISI reassembled 11/28 13 9068 Visual Bearing cover, Replaced plug 8

I TU-2 inspection plug l

missing 11/30 23 13539 P.M.

d/A Disassembled, inspected, 12 HPI-61 ISI reassembled

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DECEMBER 1981 Q

I ATE SYSTEM HOW DETEJTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

ENT

. 2/1 23 12012 Ops Valves leak by seat Replaced valves 32 HPI-27C &

due to erosion 28C k2/2 23 13604 Ops Valve leaks by seat Replaced valve 20 LS-90 due to erosion Isolation Valve L2/3 03 15689 Visual Sightglass hit with Replaced sightglass 2

Scram Disc.

wrench Inst. Vol.

2/3 27 1.4597 Ops Plugged suction filter Cleaned filter 15 P-11B 12/4 13 9504 Visual Steam cut pressure Replaced pressure seal 24 A0V-22 seal 62/4 13 13_541 P.M.

N/A Disassembled, inspected 12 RCI-12 ISI reassembled R2/5 23 13550 Ops Tight packing bound Repacked valve 12 HP,I-940 stem R2/7 12 14088 Ops Worn packing Repacked 44 MOV-18 62/15 23 16080 LLRT Leaking past c'at &

Lapped seat & disc - Formed new 240 HPI-65 seat ring / body threads body back seat with balzona super metal

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DECEMBER 1981 K REQ DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

ENT 12/15 46 13534 P.M.-

N/A Disassembled, inspected, 12 ESW-9A ISI reassembled 12/15 15 13537 P.M.

N/A Disassembled, inspected, 6

RBC-35A ISI reassembled 12/15 46 13536 P.M.

N/A Disassembled, inspected, 6

ESW-18A ISI reassembled 12/22 11 14084 Ops - Visual Packing gland on valve Replaced valve 15 SLC-725A bound up 12/22 03 15071 Ops - Visual Bad seals on valve Replaced valve 3

HCU-34-47 111 Valve

(

s

w POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C DECEMBER 1981 COMPONENT]#

K HOW DETECTED MALF C ON ML CTI O

DATE SYSTEM p

l 15635 Square rooters Replaced 74M,

+

12/9/81 02-3 SQr-74M & 74N I&C AGEIUG out of Proc. 'Ibl.

Recalibrated 74N 24 t

17193 Level detector Cleaned &

l 12/29/81 03 HCU-02-35 OPS Dirty rod switch doesn't adjusted switch 2

respond IS-129 Level detector Cleaned &

12/29/81 03 17194 OPS Dirty rod switch doesn't adjusted switch 2

HCU-18-43 resnond LS-129 Replaced switch 17195 Level switch j

12/28/81 03 HCU--34-39 OPS Old age doesn't work IE-129 2

02012 Replaced power

~

12/17/81 07 LPRM JIC Unknown Inspection supply 128 1

16972 Possible seal Detectors Replaced LPM 4 12/7/81 07 LPRM-28-21 OPS leakage reading string (A, B, C, 40 erratically D) 1o973 Possible seal Detectors Replaced LPRM 12/7/81 07 LPRM-36-45 OPS leakage reading string (A, B, C, 40 erratically D) 06047 Unknown Valves don't Calibrated 12/21/81 10 AOV-71 OPS open fully 71 A & B 46 16045 Defective Iow penetration 12/02/81 16-1 X-101D OPS pressure pressure Replaced indicator 2

indicator logic race No high alarm on Checked monitor, 09640 OPS between light &

09-3 panel tested o.k.

2 12/10/81 17 R4-251C annunciator Flow anitteu No output to Repaired by 11938 OPS physically 27-FQ/FY-103 manufacturer 10 l

12/6/81 27 FT-103A broken

l POWER AUTHORITY OF THE STATE OF NEW YORK

.~

JAMES A. FITZPATRICK NUCLEAR POWER PLANT

'N MAINTENANCE

SUMMARY

I&C DECEMBER 1981

  • R RE EST #

DATE SYSTEM HOW DETECTED CO NENT LFU C ON ML CIN T

R H

S 13766 Repeatability of switch gone Replaced switch 12 i L2/19/81 46 DPS-132A I&C Age 11544 High speed Recalibrated per i

indication in F-IMP-93 3 26 j;

1.1/30/81 93 EDG "D" Tach OPS Relay tach drift i

control room Calibration Replace &

13761 needed to be calibrate 31 EDG "A" to ' D" JIC Unknown 4 12/29/81 93 checked indicators i

16984 Temperature Replaced &

No temperature 3

switch calibrated 10.5 EDG "A"-TS Iih I&C alarm

L2/7/81 93 inoperative switch i

l W