ML033020252

From kanterella
Revision as of 16:40, 20 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

1 TS Page (Amd. 190) SONGS 2 & 3 - Issuance of Amds. 190/181 on Emergency Core Cooling System (ECCS) Surveillance Requirement (Tacs. MB8123/MB8124)
ML033020252
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/24/2003
From: Bo Pham
NRC/NRR/DLPM/LPD4
To:
Pham B, NRR/DLPM, 415-8450
Shared Package
ML033010636 List:
References
TAC MB8123, TAC MB8124
Download: ML033020252 (1)


Text

I -

ECCS- Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.4 Verify ECCS piping is full of water. 31 days SR 3.5.2.5 Verify each ECCS pump's developed head at In accordance the test flow point is greater than or with the equal to the required developed head. Inservice Testing Program SR 3.5.2.6 Deleted SR 3.5.2.7 .. YeiiVfy each ECCS automatic valve in the 24 months flow path actuates to the correct position 1..i.

on an actual or simulated actuation signal.

SR 3.5.2.8 Verify each ECCS pump starts automatically 24 months on an actual or simulated actuation signal.

SR 3.5.2.9 Verify each LPSI pump stops on an actual or 24 months simulated actuation signal.

(continued)

SAN ONOFRE--UNIT 2 3.5-6 Amendment No.427TT63,1.90