ECCS-Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.4 Verify ECCS piping is full of water.
31 days SR 3.5.2.5 Verify each ECCS pump's developed head at In accordance the test flow point is greater than or with the equal to the required developed head.
Inservice Testing Program SR 3.5.2.6 Deleted SR 3.5.2.7.. YeiiVfy each ECCS automatic valve in the flow path actuates to the correct position on an actual or simulated actuation signal.
24 months 1..i.
SR 3.5.2.8 Verify each ECCS pump starts automatically 24 months on an actual or simulated actuation signal.
SR 3.5.2.9 Verify each LPSI pump stops on an actual or 24 months simulated actuation signal.
(continued)
SAN ONOFRE--UNIT 2 3.5-6 Amendment No.427TT63,1.90