ML033110043

From kanterella
Revision as of 12:40, 20 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revision 33 to Table of Contents and Revision 6 to NC.EP-EP.ZZ-0201, TSC - Integrated Engineering Response.
ML033110043
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 10/29/2003
From:
Public Service Enterprise Group
To: David Pinckney
Document Control Desk, Office of Nuclear Reactor Regulation
References
EPIP059
Download: ML033110043 (29)


Text

Document Transmittal Form TO  : NRC CIO PINCKNEY, DAVID ID: EPIP059 DOCUMENT CONTROL DESK WASHINGTON, DC 20555 Date: 10/29/03 Please update your controlled set of documents with the following documents:

Document ID Revision Status Quantity Format RecNo PRCIEPIP-TOC-COMMON000 34 A 1 H 179418 PRCINC.EP-EP.ZZ-0201 1000 7 A 1 H 179466 ALL PAGES of this acknowledgement receipt must be returned to:

Document Management PSEG Nuclear PO Box 236 Hancocks Bridge, NJ 08038 MC N4 Your signature below verifies that:

(1) the above documents have been filed and superseded documents have been removed and destroyed or clearly marked as obsolete.

(2) the mailing address and copyholder information ars correct or corrections have been identified on this transmittal.

r] Place checkmark here to be removed from controlled distribution Signature: Date:

d~

PSEG NUCLEAR ONSITE IMPLEMENTING PROCEDURES October 29, 2003 CHANGE PAGES FOR REVISION 34 The Table of Contents forms a general guide to the current revision of each section of the Onsite EPEPs. The changes that are made in this TOC Revision #34 are shown below. Please check that your revision packet is complete and remove the outdated material listed below:

ADD REMOVE Paqe Description Rev. Page Description Rev.

ALL TOC 34 ALL TOC 33 ALL NC.EP-EP.ZZ-0201 07 ALL NC.EP-EP.ZZ-0201 06 EPEP-AIJJ 1 of 1

EPIP T.O.C.

Pg. 1 of 2 PSEG NUCLEAR LLC EMERGENCY PLAN ONSITE IMPLEMENTING PSE&G TABLE OF CONTENTS October 29, 2003 PR5CM3 0L STATION PROCEDURES COPY#k£IraIq3 Revision Number E ffective Number Pages D ate NC.EP-EP.ZZ-0101(Q) ACTIONS REQUIRED AT 02 15 01/31/2003 UNAFFECTED STATION NC.EP-EP.ZZ-0102(Q) EMERGENCY COORDINATOR 05 22 10/11/2002

RESPONSE

NC.EP-EP.ZZ-0201(Q) TSC - INTEGRATED 07 24 10/29/2003 ENGINEERING RESPONSE NC.EP-EP.ZZ-0202(Q) OPERATIONS SUPPORT 06 28 08/13/2003 CENTER (OSC) ACTIVATION AND OPERATIONS NC.EP-EP.ZZ-0203(Q) ADMINISTRATIVE SUPPORT/ 04 17 01/31/2003 COMMUNICATION TEAM RESPONSE - TSC EPIP 204H EMERGENCY RESPONSE 59 26 08/13/2003 CALLOUT/PERSONNEL RECALL EPIP 204S EMERGENCY RESPONSE 59 26 08/13/2003 CALLOUT/PERSONNEL RECALL HC.EP-EP.ZZ-0205(Q) TSC - POST ACCIDENT 03 39 02/06/2002 CORE DAMAGE ASSESSMENT SC.EP-EP.ZZ-0205(Q) TSC - POST ACCIDENT 03 82 01/31/2003 CORE DAMAGE ASSESSMENT HC.EP-EP.ZZ-0301(Q)- SHIFT-RADIATION 04 21 07/29/2003 PROTECTION TECHNICIAN

RESPONSE

SC.EP-EP.ZZ-0301(Q) SHIFT RADIATION 05 35 07/29/2003 PROTECTION TECHNICIAN

RESPONSE

EPIP-TOC-COMMON Rev. 34

EPIP T.O.C.

Pg. 2 of 2 PSEG NUCLEAR LLC EMERGENCY PLAN ONSITE IMPLEMENTING PROCEDURES TABLE OF CONTENTS October 29, 2003 Revision. Number Effective Number Pages Date NC.EP-EP.ZZ-0302 (Q) RADIOLOGICAL ASSESSMENT 06 19 07/29/2003 COORDINATOR RESPONSE NC.EP-EP.ZZ-0303 (Q) CONTROL POINT - 02 25 07/03/2002 RADIATION PROTECTION RESPONSE NC.EP-EP.ZZ-0304 (Q) OPERATIONS SUPPORT 08 27 07/29/2003 CENTER (OSC) RADIATION PROTECTION RESPONSE NC.EP-EP.ZZ-0305 (Q) POTASSIUM IODIDE (KI) 02 10 01/31/2003 ADMINISTRATION NC.EP-EP.ZZ-0306 (Q) EMERGENCY AIR SAMPLING 01 12 01/31/2003 NC.EP-EP.ZZ-0307 (Q) PLANT VENT SAMPLING 02 13 07/03/2002 NC.EP-EP.ZZ-0308(Q) PERSONNEL/VEHICLE 00 16 02/29/2000 SURVEY AND DECONTAMINATION NC.EP-EP.ZZ-0309(Q) DOSE ASSESSMENT 06 40 07/29/2003 (MIDAS) INSTRUCTIONS NC.EP-EP.ZZ-0310(Q) RADIATION PROTECTION 05 43 10/04/2002 SUPERVISOR - OFFSITE AND FIELD MONITORING TEAM RESPONSE NC.EP-EP.ZZ-0311 (Q) CONTROL POINT - 04 18 07/29/2003 CHEMISTRY RESPONSE NC.EP-EP.ZZ-0312 (Q) CHEMISTRY SUPERVISOR - 05 26 07/29/2003 CP/TSC RESPONSE NC.EP-EP.ZZ-0313(Q) ADVANCED DOSE ASSESSMENT 03 34 07/29/2003 (MIDAS) INSTRUCTIONS EPIP-TOC-COMMON Rev. 34

PSEG Internal Use Only Page 1 of 1 PSEG NUCLEAR LLC NC.EP-EP.ZZ-0201 (Q) Rev. 07 TSC - INTEGRATED ENGINEERING RESPONSE USE CATEGORY: II REVISION

SUMMARY

Biennial Review Yes No N/A X
1. Added specific steps to address containment sump blockage problems during the containment recirculation phase to address NRC commitment for containment sump performance issues (CRCA 70033171, Act 40)
2. Deleted Attachment 12, OPERATIONS ADVISOR CHECKLIST, as it belongs in EPEP-203. (NUTS 80059673, Act 290)

PSE&G .;

IMPLEMENTATION REQUIREMENTS Effective Date 10/29/03 CONTROL I.

cOPY # rPLF q APPROVED: ,V -, 7-J EP Manager Date APPROVED:

Sr. VP - Operations Date

NC.EP-EP.ZZ-0201 (Q)

TSC - INTEGRATED ENGINEERING RESPONSE TABLE OF CONTENTS Section Title Page 1.0 PURPOSE ................................................................... 2 2.0 PREREQUISITES ................................................................... 2 2.1. Prerequisites To Be Followed Prior To Implementing This Procedure ............. 2 2.1.1 Implement this procedure at: ................................................................... 2 3.0 PRECAUTIONS AND LIMITATIONS .................................................................. 2 3.1. Precautions and Limitations To Be Followed Prior To Implementing This Procedure: ................................................................... 2 4.0 EQUIPMENT REQUIRED ................................................................... 2 5.0 PROCEDURE .................................................................. 3 5.1. The Technical Support Supervisor (TSS) Should Perform The Following: ....... 3 6.0 RECORDS .................................................................. 3

7.0 REFERENCES

................................................................... 3 7.1. References ................................................................... 3 7.2. Cross-References.............................................................................................3 ATTACHMENTS ATTACHMENT 1 TECHNICAL SUPPORT SUPERVISOR CHECKLIST .......... ............... 4 ATTACHMENT 2 TURNOVER LOG - TECHNICAL SUPPORT SUPERVISOR (TSS) ... 7 ATTACHMENT 3 TSC ENGINNERING TASK ASSIGNMENT LOG ............ .................... 8 ATTACHMENT 4 TSC TECHNICAL SUPPORT TRACKING FORM ................................ 9 ATTACHMENT 5 POST ACCIDENT LOW PRESSURE INJECTION MONITORING (SALEM ONLY) .......................................................... 10 ATTACHMENT 6 ADVERSE CONTAINMENT MONITORING (SALEM ONLY) ............. 15 ATTACHMENT 7 DIESEL GENERATOR LOAD MONITORING (SALEM ONLY) .......... 16 ATTACHMENT 8 MAINTENANCE OF FUEL OIL TO SALEM EDG (SALEM ONLY) .... 17 ATTACHMENT 9 TECHNICAL SUPPORT TEAM LEADER CHECKLIST ......... ............ 19 ATTACHMENT 10 TURNOVER LOG - TECHNICAL SUPPORT TEAM LEADER ........ 23 ATTACHMENT 11 CORE THERMAL HYDRAULICS ENGINEER CHECKLIST ............ 24 Nuclear Common Page 1 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q) 1.0 PURPOSE This procedure provides guidance to emergency response personnel for administration of TSC Integrated Engineering Response during an emergency at Hope Creek or Salem Nuclear Generating Stations.

2.0 PREREQUISITES 2.1. Prerequisites To Be Followed Prior To Implementing This Procedure 2.1.1 Implement this procedure at:

  • The discretion of Technical Support Supervisor (TSS), Technical Support Team Leader (TSTL), or Technical Support Team Member (TSTM).
  • Upon staffing of your Emergency Response Facility.

3.0 PRECAUTIONS AND LIMITATIONS 3.1. Precautions and Limitations To Be Followed Prior To Implementing This Procedure:

3.1.1 It is recommended that initials be used in the place keeping sign-offs, instead of checkmarks.

3.1.2 Personnel who implement this procedure shall be trained and qualified IAW the Emergency Plan.

4.0 EQUIPMENT REQUIRED As provided in the Emergency Response Facility.

Nuclear Common Page 2 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q) 5.0 PROCEDURE NOTE:

The EDO or TSS may require Engineering support prior to TSC activation.

Precautionary MANNING of the TSC with key engineering support personnel does NOT require ACTIVATION of the TSC.

Initials 5.1. The Technical Support Supervisor (TSS) Should Perform The Following:

5.1.1 DIRECT the TSTL to Implement Attachment 9, TSTL Checklist.

5.1.2 IMPLEMENT Attachment 1, TSS Checklist.

6.0 RECORDS Forward all completed procedures, forms and attachments to EP Manager.

7.0 REFERENCES

7.1. References 7.1.1 PSEG Nuclear Emergency Plan 7.1.2 EP 96-02 post-OBE spent fuel pool rack gap evaluation 7.1.3 EP 99-01 Monitor the spent fuel pool temperature 7.1.4 EP 96-01 Monitoring Salem diesel generator fuel oil 7.1.5 EP 96-06 Placing ABV System charcoal adsorber in service 7.1.6 EP 03-002 Post Accident Low Pressure Injection Monitoring 7.2. Cross-References None Nuclear Common Page 3 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 1 Page 1 of 3 TECHNICAL SUPPORT SUPERVISOR CHECKLIST The Technical Support Supervisor (TSS) shall:

NOTE Should the EDO/ERM be unable to fulfill the duties of Emergency Coordinator (EC) for any reason (e.g., sudden illness, accident, etc.) the Technical Support Supervisor (TSS) or Site Support Manager (SSM) may assume the duties and responsibilities of EC until another qualified EDO/ERM arrives at the facility. The TSS or SSM position must be filled by another individual.

NOTE SALEM - Refer to page 3 of this attachment for additional actions required at Salem Station Initials

1. ASSUME Command and Control of the TSC facility until relieved by the EDO.

TSS

2. ASSUME Supervision of the Technical Support Team.

TSS

3. INITIATE and maintain a chronological log of your activities.

TSS

4. NOTIFY the EDO when staffing is adequate to perform the technical support functions. Request the Admin. Support Supervisor to callout additional personnel as required.

TSS

5. PROVIDE assistance to the Emergency Duty Officer (EDO) in plant status and direction, Event Classification, Protective Action Recommendations (PARs) and any other activities as required.

TSS

6. COMPLETE the Task Assignments using Attachment 4, TSC Technical Support Tracking Form, and provide to the TSTL for implementation.

TSS

7. REVIEW all completed Attachment 4, TSC Technical Support Tracking Forms. Forward to the EDO for review.

TSS Nuclear Common Page 4 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 1 Page 2 of 3 Initials

8. REVIEW as appropriate, procedures being implemented by the Control Room and periodically brief the EDO and the TSTL on:
  • Support that may be required by the OS.
  • Any projected problems or areas of concern.
  • Overall direction in which the Control Room is proceeding.
  • Status of the Control Room implementation of EOP, AOP, and lOPs.
  • Status of engineering recommendations provided to the OS.

TSS

9. IF a radiological release is imminent or in progress, THEN place the TSC Emergency Ventilation System in service in the pressurized mode:

TSS HOPE CREEK SALEM Place the TSC Mode Control Direct a TSTM to place the TSC Switch (HS-9764) to PRESS (local Ventilation System in Emergency Panel 1ON21 1 at Central Alarm Operation, Station). IAW SC.OP-SO.TSC-0051 Section 5.3, Operation During High Radiation Conditions.

10. IF smoke or toxic gases are detected in the TSC air supply, THEN place the TSC Emergency Ventilation System in service in the recirculation mode: TSS HOPE CREEK SALEM Place the TSC Mode Control Direct a TSTM to place the TSC Switch (HS-9764) to RECIRC (local Ventilation System in Emergency Panel 1 N21 1 at Central Alarm Operations IAW SC.OP-SO.TSC-Station). 0051 Section 5.4, Operation During Chemical Release.

11.WHEN the TSC Emergency Filtration System is no longer required, THEN request operations to return the TSC ventilation to normal alignment IAW:

TSS HOPE CREEK --SALEM HC.OP-SO.GR-0001 (Z) SC.OP-SO.TSC-0051 Nuclear Common Page 5 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 1 Page 3 of 3 Initials

12. ESTABLISH communications with the Site Support Manager (SSM) at the EOF and provide periodic updates on the plant status. TSS
13. IF vendor assistance is required, THEN direct the TSTL to contact the Technical Support Manager at the EOF and request they provide the necessary support.

TSS

14. Implement Severe Accident Management Guidelines (SAMG/SAG) and/or Supplemental Severe Accident Management Guidelines (SSAMG) as required based on degrading plant conditions.

TSS

15. COMPLETE Attachment 2, Turnover Log - TSS Checklist when being relieved.

TSS 16.AT the conclusion of the event, THEN insure that the TSC area is returned to ready status and all paperwork related to the event is collected and forwarded to the Emergency Preparedness Manager.

TSS SALEM ONLY

1. IF R44A or R44B Dose Rate is > 1.OE+04 R/Hr, THEN Implement Adverse Containment Monitoring in accordance with Attachment 6 of this procedure.

TSS

2. WHEN the plant is placed in the "Recirculation Mode"(i.e., RHR suction is aligned to the containment sump) THEN direct the TSTL to implement Attachment 5 of this procedure, Post Accident Low Pressure Injection Monitoring. TSS
3. IF LOCA conditions exist, THEN contact the Control Room and request that the Auxiliary Building Ventilation (ABV) System Charcoal adsorber be placed in service within two hours of the LOCA in accordance with the appropriate procedure. (EP96-006) TSS
4. IF the Control Area Air Conditioning System (CAACS) is in emergency mode of operation for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, THEN a temporary fan must be installed in the security 125VDC battery room.

This room is located in southwest corner of Unit 1 4160v switchgear area & 1C battery .room at 64' elevation.

TSS Nuclear Common Page 6 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 2 Page 1 of 1 TURNOVER LOG - TECHNICAL SUPPORT SUPERVISOR (TSS)

Date: /

1. [UE] [A] [SAE] [GE] was declared @ hrs. on /

Due to:

2. The present classification, [A] [SAE] [GE] was declared @ was declared hrs. on l l
3. The Emergency Coordinator (EC) is in the [EOF] [TSC] name
4. The Oncoming and Offgoing TSS should:

Initials On / Off A. DISCUSS current conditions. Include any problems encountered or anticipated, and any ongoing, or expected actions.

/

B. REVIEW all applicable documentation including procedures, logs, etc., ensuring they are completed, correct and signed.

C. DISCUSS the TSC's priorities, personnel requirements and any support or material needs.

D. DISCUSS any Radiological, Safety, or Environmental concerns.

E. INSURE that technical support assignments are completed or reassigned as necessary. /

F. NOTIFY the TSTL and the EDO of the change in command of the TSS. Update plant status and priorities as applicable. /

G. As soon as possible, the oncoming TSS shall hold a briefing with the oncoming TSTL and TSTM's to insure a smooth

/

transition between the oncoming and off going TSC personnel.

Oncoming TSS signature Time Offgoing TSS signature Nuclear Common Page 7 of 24 Rev. 07

(

z ATTACHMENT 3 Page 1 of I ID TSC ENGINNERING TASK ASSIGNMENT LOG s1 0 DATE: PAGE OF 2C)

B TASK TASK TASK ASSIGNED CHECK 0 PRIORITY ASSIGNMENT TO COMMENTS/REMARKS/PROBLEMS APPROPRATE TITLE (NAME) STATUS (BRIEF DESCRIPTION)

I n HOLD n FORWARD El n IN PROGRESS

._____ n COMPLETE D_________

o HOLD

-u D FORWARD o IN PROGRESS CD 0,

o COMPLETE 0 o HOLD

-Ok n FORWARD o IN PROGRESS o COMPLETE n HOLD n FORWARD (n

< n IN PROGRESS to o COMPLETE z o HOLD o FORWARD o IN PROGRESS 0 l'3 o COMPLETE C:)

a HOLD n FORWARD 0 CD n IN PROGRESS 0 n COMPLETE 4

NOTE: TSTL - maintain this roster as a formal document of engineering Assignments and keeping others informed of activities in progress.

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 4 Page 1 of I TSC TECHNICAL SUPPORT TRACKING FORM TASK ASSIGNMENT: (DESCRIPTION, BRIEF) TASK#

REQUESTED BY: (CIRCLE ONE) ASSIGNED TO: TIME/DATE:

TSTL/SSM ENGINEERING RESPONSE/RECOMMENDATION:

REVIEW: TSTL* TSS EDO OS** DISPOSITION TIME:

IZ Implement INITIALS: [E° Hold FReject

  • RETAIN A COPY OF THIS DOCUMENT FOR FUTURE REFERENCE
  • ALL CORRECTIVE ACTIONS IMPLEMENTED IN THE PLANT MUST BE APPROVED BY THE OS.

Nuclear Common Page 9 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 5 Page 1 of 5 POST ACCIDENT LOW PRESSURE INJECTION MONITORING (SALEM ONLY)

1. Action Level RHR lined up for suction from the Containment Sump in a post accident situation.
2. Action Statements THE TECHNICAL SUPPORT TEAM LEADER SHALL:

Initials 2.1 Request the SM to have the ECCS Pump Performance Analysis Log (Attachment

5. page 2 of NC.EP-EP.ZZ-0201(Q)), completed hourly and provided (FAXED) to the TSTL in the TSC for reviev.

2.2 Evaluate ECCS Pump Performance Analysis Log Data (Attachment 5. page 2).

provided hourly from the Control room against Pump Operating curves.

(Attachment 5, pages 3.4,5).

TSTL 2.3 IF containment sump blockage is suspected based on review of ECCS Pump data.

NOTE Indications of containment sump blockage may include the following:

. Erratic Current (amps) indicated on Charging. SI or RHR Pumps

. Erratic Discharge Pressure indicated on Charging, SI or RHR Pumps

. Erratic Flowv indicated on Charging. SI or RHR Pumps

. Erratic or unexpected containment Sump Level indication THEN develop contingency plans and recommendations to mitigate the effect of sump blockage. Mitigation strategies that should be considered/evaluated include:

  • Securing one train of ECCS pumps
  • IF Containment Spray Pumps are using the containment sump as their suctions source. consider securing one train.
  • Throttling RFIR injection flow
  • Use of the CVCS positive displacement pump (PDP) cross-connection per procedure. SI9(2).OP-SO.C'C-0023, Cross-Conin'ecl Alignment to Unit 2(1).

(EP03-002) ISTL

.4 Provide analysis results and contingency plans or recommendations to the TSS /

l"DO for review and routing to the Shift Manaoer lbr approval and TSTL implernentation.

Nuclear Common Page 10 of 24 Rev. 07

I z SALEM UNIT # _ NOTE: CIRCLE ALL UNSATISFACTORY INDICATIONS 0 ECCS PUMP PERFORMANCE

_ _ ANALYSIS LOG I AND NOTIFY THE TSS/EDO. DATE:

CD INSTRUMENT INDICATIONS (HOURLY) TIME I TIME I TIME TIME TIME TIME TIME NO. TIT t I .

0

-o PARAMETER MIN MAX 0

3 LA 2445 CONT. SUMP LEVEL (%) 41 86 3

0 PA 5511 CONT. PRESSURE (PSIG) -3 +47 PI 942 BIT PRESSURE (PSIG) 440 2500 1 PUMP) _2 PUMPS_

IA 5310 #1 CH. PUMP AMPS 49 84 IA 5311 #2 CH. PUMP AMPS 49 84 Fl 917 CH. PUMP FLOW (TOTAL) (GPM) 0 780 - 830

___JIE~l1 PMP A2 UMPSL }

Fl 128b -1 SEAL INJECTION FLOW(GPM) 0 78 I PI 923 #1S PUMP DISH PRESS 770 1500 0 )

ED

-0 ( g PI 919 #2 SI PUMP DISH PRESS 770 1500 CDim Z

ta o -I IA 5432 #1SI PUMP AMPS 28 56

" _1 enl .

IA 5433 #2 SI PUMP AMPS 28 56 CV C,

Fl 922 #1SI PUMP FLOW (GPM) 0 (CL) 650 (CL)

-(COLDLEG)

Fl 918 #2 S PUMP FLOW (GPM) 0 (CL) 650 (CL)

_(COi I F. I PI 635 #1RHR PUMP DISH PRESS 130 190 z

PI 647 #2 RHR PUMP DISH PRESS 130 190 0 m

-D IA 5001 #1RHR PUMP AMPS 28 55 r~n To IA 5002 #2 RHR PUMP AMPS 28 55

-D Fl 946 #1RHR PUMP FLOW (GPM) 0 5000 CD Fl 947 #2 RHR PUMP FLOW (GPM) 0 5000 .0 0L NOTES: 1. REFERE TO ATTACHED PUMP CURVES FOR CAPACITY VS TOTAL HEAD.

2. VALIDATE ABNORMAL INDICATIONS BY CORRELATING ALL AVAILABLE DATA.
3. X-OUT-- INDICATIONS FOR NON-RUNNING PUMPS.
4. CONTROL ROOM STAFF SHOULD TRANSMIT THIS DATA HOURLY TO THE TSTL IN THE TSC.

z C

0

-I Centrifugal Charging Pump 0

2 0 3 0) 0~

0 C-I - t I 1 1 11 - - I - --I- - I - I - I - - I I 4-4-6

  • I I -

C- -

o-hI CDJ C-,

2 V) H

.. H CDJ *o:

D I cr2cr V) s2 =

0 (D m

-~~~ a: C4 Z Q o H o~ -46u  : (0 __;; W CD al,0n A~~~V N~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 0 Ul r"

L C-1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~I z

VJ

£12 in

-U 0.

II r.-..

I111 . I I I 0

- .- rn I

r-y -

2I I I I I I I I I II2II II I I I

.... -ntrrr I50 I I I I I i 1111 I r-..

T4I0I ntr, II Ill or II l ll ll 111111nTT1r1 II

~ - =O

_II 0I 50 I 00 150 200 250 300 350 400 450 500 550 0 0

CAPACITY IN GPM 0 0

D 4

I z

0 Ct C) Safeety Injection Pump 0

3 3

0o ct ct I-kn a) o)N

-4 4-,

a1. aN to U) tn - Im CD a =

CD (D to w

IL 0 w CD m 0

C-, CD e ,

C:

C0)

.11 C.) o 0

0 o oL C',

Or (0 o2 ti 0l~ z

'Z

-a 0 -I 0 0 100 200 300 400 500 600 700

'.3

CAPACITY IN GPM 0 0

1-4

z 0

3I 0

Residual -IeaL Removal Pump 0 0 0- 0 0if)-

- O 0

-I--.--- - - - - - - - - - - -----I--

-O 0n V) 0 C0 L4 F- -i-I- -

0 ri CD IV CL) C3 -J4-*i- -f- -- - - ----------- i--- J---&- - - -

-0C (I]

-- -- 4 4- t- 4- - I- f4- I- 4-I C) 0) m o  :-

.0 0-CVJ A\

C-D 0 0 I-4

_ 0.

O_0_ _ _ _ _ __ ___ _ __ _ _ _S r >' _ __ _ -, I

- VJ Z- z 0 , -

0 'in 1111 -u 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000

CAPACITY IN GPM ° CD 4

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 6 Page 1 of I ADVERSE CONTAINMENT MONITORING (SALEM ONLY)

TECHNICAL SUPPORT SUPERVISOR (TSS) SHALL:

1. Monitor (at least once every 30 minutes) the Integrated Dose and Dose Rate in the containment as indicated on Radiation Monitor Locations Display on SPDS and perform the following:

Initial/Time

a. IF the Dose Rate, as indicated by R44A or R44B, is greater than or equal to 1E5 R/HR (>100,000 R/HR) AND the Integrated Dose as indicated by R44A or R44B is less than 1E6 R, (<1,000,000 R),

THEN Contact the STA with the above information and inform that Adverse Containment Condition due to high radiation DOES NOT exist and he/she should refer to EOP-CFST-1 for actions required.

TSS Time

b. IF the Integrated Dose as indicated by R44A or R44B is greater than or equal to 1E6 R (>1,000,000 R),

THEN Contact STA and notify of the Integrated Dose value and that Adverse Containment Conditions due to high radiation DO exist and he/she should refer to EOP-CFST-1 for action required. l TSS Time Nuclear Common Page 15 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 7 Page 1 of I DIESEL GENERATOR LOAD MONITORING (SALEM ONLY)

EVALUATED loading of any and all running Emergency Diesel Generators against the "Excessive Load Chart" below:

EXCESSIVE LOAD CHART TIME LIMIT MAXKW ASSUMED PF MAX KVAR MAX KVA RATING RATING RATING 1/2 HOUR 3100 .8 2325 3875 2 HOURS 2860 .8 2145 3575 2000 HOURS 2750 .8 2063 3438 CONTINUOUS 2600 .8 1950 3250

2. IF the MAXIMUM LOAD RATING IN KW, KVAR, or KVA is exceeded, recommend to the TSS, using a TSC Technical Support Tracking Form (Attachment 4) of this procedure, that unnecessary loads be secured until the load is less then maximum rating.
3. EVALUATE the cumulative loading effects by performing the following calculation:

N 1/8000 + N2/2000 + N3/730 + N4/.5 = X(effect factor)

Where: (run time in hours)

N1 = Run time > the continuous rating N2 = Run time > 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating N3 = Run time > 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> rating N4 = Run Time > 1/2 hour rating

4. IF the effect factor (X above) is approaching or above 1.0, THEN recommend to the TSS, using TSC Technical Support Tracking Form (Attachment 4) of this procedure, that unnecessary loads be secured. Emergency Diesel Inspection or Overhaul should be considered per manufacture guidance.
5. DISCONTINUE this attachment if-no Emergency diesel generators are powering a vital bus.

Nuclear Common Page 16 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 8 Page 1 of 2 MAINTENANCE OF FUEL OIL TO SALEM EDG (SALEM ONLY)

EP96-001 Initials

1. REVIEW available MAJOR EQUIPMENT AND ELECTRICAL STATUS sheets ELECTRICAL STATUS section and determine current Emergency Diesel Generator (EDG) use. TSTL
2. EVALUATE plant conditions and determine if EDG operations will be required for > 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. TSTL
3. IF EDG operations ARE NOT required for > 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, THEN notify the TSM that EDG fuel oil maintenance is not required at this time. Continuously monitor plant conditions for changes that may require TSTL re-evaluation of step 2 above.
4. IF EDG operations ARE required for >4 hours, THEN complete a "TSC Technical Support Tracking Form" and request that the OS determine of the status of the 20,000 Barrel Fuel Oil storage Tank (FOST) and associated transfer piping used to fill the Diesel Fuel Oil Storage Tanks (DFOSTs)

TSTL A. IF plant conditions preclude Operations Dept. routine checks of DFOST levels at the prescribed frequency (e.g.

radiological or higher priority concerns),

THEN request the OS to direct the OSCC to assemble and dispatch a team to evaluate DFOST inventory.

B. IF normal fuel oil transfer capability DOES exists, THEN request the OS to ensure DFOSTs levels are maintained greater than Tech Spec limits IAW Normal Operating Procedures.

C. IF normal fuel oil transfer capability DOES NOT exist, THEN request the TSM (NETS 5007) to develop an action plan for alternative EDG fueling methods per TSC Technical Support Tracking Form (Attachment 4) and inform the OS that you have requested EOF Technical Support.

Nuclear Common Page 17 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 8 (cont.)

Page 2 of 2 NOTE Maplewood Lab should be contacted to provide onsite support for fuel oil sampling.

Initials

5. WHEN requested to develop an action plan for alternative EDG fueling methods to the DFOSTs, THEN implement the following actions: TSTL A. COORDINATE with the EOF Purchasing Support to procure and deliver fuel oil, see note below, from an offsite source and fill the DFOST from the Emergency fill Connection.

NOTE The following diesel fuel oil suppliers and transport companies have current enforceable contracts with PSE&G for emergency fuel oil supply:

Fuel suppliers Fuel transport companies if supplier cannot transport Amerada Hess Corp. Dana transport Inc.

Coastal Oil NY Marshall Service Inc.

Ross Fogg Oil Corp S. J. Transportation Inc.

B. IF needed as a backup to action "A" above, THEN assemble temporary hoses and pumps to transfer fuel oil from the FOST to the DFOST Emergency Fill Connection.

6. COMPLETE and forward the selected action plan for alternative EDG fueling methods on a "TSC Technical Support Tracking Form."

TSTL Nuclear Common Page 18 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 9 Page 1 of 4 TECHNICAL SUPPORT TEAM LEADER CHECKLIST NOTE SALEM - Refer to page 3 of this attachment for additional actions required at Salem Station Initials

1. REPORT to the TSS and obtain a briefing.

TSTL

2. INITIATE and maintain a chronological log of your activities.

TSTL

3. BRIEF team members on the plant and emergency status.

TSTL

4. DIRECT Core Thermal Hydraulics Engineer to implement Attachment 11.

TSTL

5. DIRECT TSTM(s) to verify SPDS and/or CRIDS availability.

TSTL

6. DIRECT a TSTM to monitor plant activities on the OSC Radio Monitor.

TSTL

7. WHEN staffing is adequate to perform the technical support functions, THEN inform the TSS. Request the Administrative Support Supervisor to callout additional personnel as required.

TSTL

8. ASSIGN TSTM(s) specific tasks using TSC Technical Support Tracking Form (Attachment 4) of this procedure.

TSTL

9. DOCUMENT all assigned tasks using Attachment 3, TSC.Engineering Task Assignment Log of this procedure.

TSTL (Attachment continued on the next page.)

Nuclear Common Page 19 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 9 Page 2 of 4 Initials

10. ENSURE the engineer's OPERATIONAL STATUS BOARD is updated every 15 minutes (TSS may modify the frequency or data list as appropriate.):

TSTL HOPE CREEK SALEM

a. Obtain the operational a. Obtain the information from SPDS information by requesting the by the following:

TSC Communicators to provide

  • Go to the top menu bar and the information from VAX LA select "Top Level Display" on 120 printer, Menu Option #2 or the drop down menu or select from the Control Room the "Top Level Display" icon.

Communicators.

  • Select the "REPORTS" button on the screen.
  • Select the "STATUS BOARD PARAMETERS" on the screen.
  • Click "OK" on printer dialog box to print all of the Operational Status Board parameters in order.
  • Update the Operational Status Board.

OR OR

b. Obtain the information from b. IF SPDS is not available THEN CRIDS PAGE DISPLAY #232. Request the TSC Communicators to obtain the information from the Control Room Communicators and update the Operational Status Board every 15 minutes or as determined by the TSS.
11. ENSURE the engineer's MAJOR EQUIPMENT & ELECTRICAL STATUS SHEET is reviewed once per event or upon any significant change in plant status.

TSTL

12. ESTABLISH communications with the Technical Support Manager (TSM) at the EOF. -Provide-an update-on engineering activities and request engineering support, if required.

TSTL (Attachment continued on the next page.)

Nuclear Common Page 20 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 9 Page 3 of 4 Initials

13. REVIEW and forward all Attachment 4, TSC Technical Support Tracking Forms to the TSS. (Retain a copy for formal documentation).

TSTL

14. COMPLETE Attachment 10, Turnover Log - Technical Support Team Leader, when being relieved.

TSTL

15. AT the conclusion of the event, THEN insure that the team's area is returned to ready status and that all paperwork related to the event is turned over to the TSS. TSTL SALEM ONLY
1. IF any Vital Bus is powered from an emergency diesel generator, THEN direct staff member to implement Attachment 7, "DG Load Monitoring", of this procedure.

TSTL

2. IF Salem has experienced an Operating Basis Earthquake (OBE), THEN coordinate implementation of the spent fuel rack inspection IAW SC.DE-TS.ZZ-4406(Q), Evaluation of Post-OBE Rack-to-Rack and Rack-to-Wall Gaps. (EP96-002)

TSTL

3. IF Spent Fuel Pool (SPF) temperature increases past 1250 F, THEN MONITOR the SPF Temperature (local indication). (EP99-001)
a. IF the temperature reaches 1490 F., THEN COORDINATE through the EDO to have Operations restore one SFP Cooling Pump and one Heat Exchanger to cool down the SFP IAW S1 (2).OP-SO.SF-0002(Q), SPENT FUEL COOLING SYSTEM OPERATION.
b. ASSURE this action is taken in sufficient time to prevent exceeding the pool design temperature of 180: F. (It should take approximately 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> to reach 180o F.)
c. MONITOR the SFP temperature until it returns to < 1250 F.

TSTL

4. MONITOR the status of Emergency Diesel Generator (EDG) fuel oil availability by implementing Attachment 8, Maintenance of Fuel Oil to Salem Emergency Diesel Generators, as appropriate. (EP96-001)

TSTL (Attachment continued on the next page.)

Nuclear Common Page 21 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 9 Page 4 of 4 Initials

5. IF both Si pumps have been running for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, THEN monitor SI pump room temperatures (P250 and/or local monitoring) at least every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If room temperature exceeds 120 0F, then complete a TSC Technical Support Tracking Form (Attachment 4) which recommends the following to the OS:
a. Stop one of the two running Si pumps.
b. Stop the Si pump room cooler fan, if running.
c. If room temperature continues to increase above 120'F, then request Site Protection in the OSC to put together temporary ventilation to the SI pump room if the area is accessible.

TSTL Nuclear Common Page 22 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 10 Page 1 of 1 TURNOVER LOG - TECHNICAL SUPPORT TEAM LEADER Date:

1. [UE] [A] [SAE] [GE] was declared @ hrs.on / I Due to:
2. The present classification, [A] [SAE] [GE] was declared @ was declared hrs. on l l Due to:
3. The Emergency Coordinator (EC) is in the [EOF] [TSC] name
4. The Oncoming and Offgoing TSTL shall:

Initials On / Off A. DISCUSS current conditions. Include any problems encountered or anticipated, and any ongoing, or pending technical support assignments.

B. REVIEW all applicable documentation including procedures, logs, etc., ensuring they are completed, correct and signed.

C. DISCUSS the team's priorities, personnel requirements and any support or material needs.

D. DISCUSS any Radiological, Safety, or Environmental concerns.

E. INSURE that technical support assignments are completed or reassigned prior to TSTM(s) being relieved or dismissed. _________/_________

F. NOTIFY the TSS and the EDO of the change in command of the TSTL...lJpdate-plant status.and.pdorities as-applicable. /

Oncoming TSTL signature time Offgoing TSTL signature Nuclear Common Page 23 of 24 Rev. 07

NC.EP-EP.ZZ-0201 (Q)

ATTACHMENT 11 Page 1 of 1 CORE THERMAL HYDRAULICS ENGINEER CHECKLIST The Core Thermal Hydraulics Engineer (CTHE) shall:

Initials

1. REPORT to TSTL upon arrival and receive assignment.

CTHE

2. ANALYZE core thermal hydraulic parameters to determine current conditions of the core.

CTHE

3. DEVELOP recommendations concerning plant operations to maintain safe core conditions.

CTHE

4. PROVIDE support to the Control Room staff on core reactivity conditions such as shutdown margin, boration requirements, control rod movements or patterns, etc.

CTHE

5. EVALUATE fuel damage based on core thermal conditions, rad monitoring, and/or specific chemistry sample results:

CTHE HOPE CREEK SALEM IAW HC.EP-EP.ZZ-0205, IAW SC.EP-EP ZZ-0205, "TSC - Post Accident Core "TSC - Post Accident Core Damage Assessment". Damage Assessment".

6. COORDINATE fuel damage assessments with the TSC Chemistry Supervisor and inform TSTL of results.

CTHE

7. FORWARD all procedures, forms, etc., to the TSTL when the emergency is terminated.

CTHE Nuclear Common Page 24 of 24 Rev. 07