Request for Withholding Information from Public Disclosure
ML033240650
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/20/2003
From: Donohew J
NRC/NRR/DLPM/LPD4
To: Mallay J
Framatome ANP
Donohew J N, NRR/DLPM,415-1307
References
Download: ML033240650 (5)


Text

November 20, 2003 Mr. James F. Mallay Director, Regulatory Affairs Framatome ANP 3815 Old Forest Road Lynchburg, VA 24501

SUBJECT:

CALLAWAY PLANT, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE

Dear Mr. Mallay:

By letter dated November 6, 2003, Framatome ANP (FANP) submitted an affidavit dated October 30, 2003, executed by you, requesting that information in the presentation material entitled, "Callaway Plant - LSELS, BoP ESFAS, MSFIS Safety DCS Replacement Project -

Conceptual Design Overview," to be used at the meeting between the NRC staff and Union Electric Company (licensee for Callaway) on November 12, 2003, concerning potential instrumentation digital upgrades, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.790. A nonproprietary copy of the document was not provided for placement in the Nuclear Regulatory Commission's (NRC's) Public Document Room and for addition to the Agencywide Documents Access and Management System Public Electronic Reading Room. The NRC staff concluded that it is not practical to have a nonproprietary copy of the document because at best only introductory slides may be nonproprietary and the document is not part of an NRC staff approval of a licensing action.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

4. This Document contains information of a proprietary and confidential nature and is of the type customarily held in confidence by FANP and not made available to the public.
5. This Document has been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in this Document be withheld from public disclosure.
6. (a) The information reveals details of FANP's research and development plans and programs or their results.

(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.

(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for FANP.

J. Mallay (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for FANP in product optimization or marketability.

(e) The information is vital to a competitive advantage held by FANP, would be helpful to competitors to FANP, and would likely cause substantial harm to the competitive position of FANP.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, we have determined that information contained in the presentation slides entitled, "Callaway Plant - LSELS, BoP ESFAS, MSFIS Safety DCS Replacement Project - Conceptual Design Overview," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at (301) 415-1307.

Sincerely,

/RA/

Jack N. Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page

J. Mallay (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for FANP in product optimization or marketability.

(e) The information is vital to a competitive advantage held by FANP, would be helpful to competitors to FANP, and would likely cause substantial harm to the competitive position of FANP.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, we have determined that information contained in the presentation slides entitled, "Callaway Plant - LSELS, BoP ESFAS, MSFIS Safety DCS Replacement Project - Conceptual Design Overview," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at (301) 415-1307.

Sincerely,

/RA/

Jack N. Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:

PUBLIC cc: See next page PDIV-2 Reading RidsNrrDlpmPdiv (HBerkow)

RidsNrrPMJDonohew RidsNrrLAEPeyton RidsOgcRp EMarinos ADAMS ACCESSION NO.: ML033240650 NRR-084 OFFICE PDIV-2/PM PDIV-2/LA EEIB OGC PDIV-2/SC NAME JDonohew EPeyton:esp EMarinos MSNordlinger SDembek DATE 11/10/03 11/10/03 11/10/03 11/14/03 11/19/03 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML033240650.wpd OFFICIAL RECORD COPY

Callaway Plant, Unit 1 cc:

Professional Nuclear Consulting, Inc. Mr. Rick A. Muench 19041 Raines Drive President and Chief Executive Officer Derwood, MD 20855 Wolf Creek Nuclear Operating Corporation P.O. Box 411 John ONeill, Esq. Burlington, KA 66839 Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W. Mr. Dan I. Bolef, President Washington, D.C. 20037 Kay Drey, Representative Board of Directors Coalition for the Mr. Mark A. Reidmeyer, Regional Environment Regulatory Affairs Supervisor 6267 Delmar Boulevard Regulatory Affairs University City, MO 63130 AmerenUE P.O. Box 620 Mr. Lee Fritz, Presiding Commissioner Fulton, MO 65251 Callaway County Court House 10 East Fifth Street U.S. Nuclear Regulatory Commission Fulton, MO 65151 Resident Inspector Office 8201 NRC Road Mr. David E. Shafer Steedman, MO 65077-1302 Superintendent, Licensing Regulatory Affairs Mr. Chris Younie AmerenUE Manager, Quality Assurance P.O. Box 66149, MC 470 AmerenUE St. Louis, MO 63166-6149 P.O. Box 620 Fulton, MO 65251 Mr. Keith D. Young Manager, Regulatory Affairs Manager - Electric Department AmerenUE Missouri Public Service Commission P.O. Box 620 301 W. High Fulton, MO 65251 P.O. Box 360 Jefferson City, MO 65102 Mr. Scott Clardy, Director Section for Environmental Public Health Regional Administrator, Region IV P.O. Box 570 U.S. Nuclear Regulatory Commission Jefferson City, MO 65102-0570 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. Garry L. Randolph Vice President and Mr. Ronald A. Kucera Chief Nuclear Officer Deputy Director for Public Policy Union Electric Company Department of Natural Resources Post Office Box 620 P.O. Box 176 Fulton, MO 65251 Jefferson City, Missouri 65102