NRR E-mail Capture - Hatch Nuclear Plant, Units 1 and 2 - Acceptance of Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control
ML17139B673
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/18/2017
From: Randy Hall
Plant Licensing Branch II
To: Mcelroy G
Southern Nuclear Operating Co
References
MF9662, MF9663
Download: ML17139B673 (3)


Text

NRR-PMDAPEm Resource From: Hall, Randy Sent: Thursday, May 18, 2017 1:34 PM To: Ken McElroy Cc: Joyce, Ryan M. (RMJOYCE@southernco.com); jjhutto@southernco.com

Subject:

Hatch Nuclear Plant, Units 1 and 2 - Acceptance of Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9662 and MF9663)

May 18, 2017 Mr. G. Ken McElroy Licensing Manager Southern Nuclear Operating Company

Dear Ken,

By letter dated April 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17114A377),

the Southern Nuclear Operating Company, Inc. (SNC, the licensee) submitted a license amendment request for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (HNP). The proposed amendment would replace existing HNP Technical Specifications (TS) requirements related to operations with a potential for draining the reactor vessel with new requirements on reactor pressure vessel water inventory control to protect Safety Limit 2.1.1.3. Safety Limit 2.1.1.3 requires reactor vessel water level to be greater than the top of active irradiated fuel. The proposed amendment would incorporate changes to the HNP TS similar to those addressed in Technical Specifications Task Force (TSTF) traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 550 hours22.917 days <br />3.274 weeks <br />0.753 months <br /> to complete. The NRC staff expects to complete this review in approximately 9 months, which is January 31, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

1

If you have any questions, please contact me at (301) 415-4032.

Sincerely, Randy Hall, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC (301) 415-4032 Randy.Hall@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 3522 Mail Envelope Properties (Randy.Hall@nrc.gov20170518133300)

Subject:

Hatch Nuclear Plant, Units 1 and 2 - Acceptance of Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9662 and MF9663)

Sent Date: 5/18/2017 1:33:43 PM Received Date: 5/18/2017 1:33:00 PM From: Hall, Randy Created By: Randy.Hall@nrc.gov Recipients:

"Joyce, Ryan M. (RMJOYCE@southernco.com)" <RMJOYCE@southernco.com>

Tracking Status: None "jjhutto@southernco.com" <jjhutto@southernco.com>

Tracking Status: None "Ken McElroy" <gkmcelro@southernco.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3446 5/18/2017 1:33:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: